Locations
Industrial rooftop solar in Uttarakhand
9 CAPEX plants and 4 PPA plants: 14 Uttarakhand projects across Haridwar, Roorkee, Selaqui and Rudrapur, on metal sheet, RCC and ground-mount plants.
- projects listed here in Uttarakhand
- 14
- places with a plant
- 4
- industries named
- 5
- most recent commissioning
- Jul 2026
Uttarakhand
CAPEX and PPA in the same towns
Uttarakhand has 14 projects listed here, spread across four industrial towns. By finance model, 9 were CAPEX and 4 were PPA / OPEX (the model is not recorded for 1).
Both models appear in the same towns, which shows the choice is made factory by factory: some owners want the plant on their balance sheet and others want the power without the outlay. Our CAPEX and PPA pages set out what each one means for cash flow.
The list also includes a ground-mount plant, which is worth knowing if your roof will not carry your load.
Where the plants are
Haridwar, Roorkee, Selaqui and Rudrapur
10 projects
Haridwar and Roorkee
Haridwar, Roorkee
Consumer goods, pharma, polymer and electrical plants in Haridwar district.
FMCG · Electrical & Electronics · Pharma · Polymer
Haridwar and Roorkee industrial solar page2 projects
Selaqui
Two industrial plants near Dehradun.
Warehousing
2 projects
Rudrapur
Two consumer-goods plants in the Udham Singh Nagar belt.
FMCG
What the list shows
Sectors, roofs and finance models in Uttarakhand
Counts for the projects listed here in Uttarakhand.
Sectors
- FMCG9
- Electrical & Electronics1
- Pharma1
- Polymer1
- Warehousing1
- General industrial1
Roof types
- Ground mount5
- Metal sheet roof5
- Metal sheet + RCC2
- RCC2
Finance model
- CAPEX9
- PPA / OPEX4
FMCG is the largest named sector (9 of 14 projects). Roof types: 5 on ground mount, 5 on metal sheet roofs, 2 on metal sheet + RCC and 2 on RCC. By finance model, 9 were CAPEX and 4 were PPA / OPEX (the model is not recorded for 1).
Projects
Plants listed in Uttarakhand
Newest first.
- 332 kWp
HUL – Haridwar, 332 kWp
Uttarakhand
Commissioned Jul 2026
- 332 kWp
Blink Infra – Selaqui
Uttarakhand
Commissioned Dec 2025
600 kWp
Akome Life Care – Haridwar
Uttarakhand
Commissioned Apr 2025
- 530 kWp
Balmer Lawrie – Selaqui
Uttarakhand
Commissioned Dec 2024
- 300 kWp
Plastiblends – Roorkee
Uttarakhand
Commissioned Apr 2024
537 kWp
Legrand – Haridwar
Uttarakhand
Commissioned Jan 2024
- 1,000 kWp
Dabur – Rudrapur, 1,000 kWp
Uttarakhand
Commissioned Nov 2023
- 400 kWp
Dabur – Rudrapur, 400 kWp
Uttarakhand
Commissioned Nov 2023
- 1,126 kWp
HUL – Haridwar, 1,126 kWp
Uttarakhand
- 801 kWp
HUL – Haridwar, 801 kWp
Uttarakhand
- 800 kWp
HUL – Haridwar, 800 kWp
Uttarakhand
- 685 kWp
HUL – Haridwar, 685 kWp
Uttarakhand
Plant pages
2 more plants listed in Uttarakhand
Older plants, each with its own page.
What to check first
Checks for an Uttarakhand factory, from roof load to monsoon
- 01
Whether your roof can carry the load
If it cannot, ground-mount or offsite solar may fill the gap.
Ground-mount solar - 02
CAPEX against PPA, plant by plant
You can mix models across factories. Price both for each site.
Compare CAPEX and PPA - 03
Rules for your connection
Metering and surplus terms differ by state. Read the current position before you size.
Uttarakhand solar policy - 04
Monsoon drainage and cleaning
Plan cleaning and drainage for the wet season, and ask for the wind-load assumptions in writing.
Solar O&M and AMC
Guides and glossary
Guides and terms for Uttarakhand factories
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Common questions
What Uttarakhand factories ask before they buy
Speak with an industrial solar engineerDo you build both CAPEX and PPA plants in Uttarakhand?
Yes. By finance model, 9 were CAPEX and 4 were PPA / OPEX (the model is not recorded for 1). The free study gives you an ROI sheet and a budgetary quote for your roof.
Which Uttarakhand towns have you built in?
Haridwar, Rudrapur, Selaqui and Roorkee. Each plant appears in the projects section with its town and commissioning month.
Have you built ground-mount plants in the state?
Yes, one is listed, a ground-mount plant for a consumer-goods warehouse in Haridwar. The ground-mount page sets out when it makes sense and what it needs.
Does monsoon rain affect a plant in Haridwar or Roorkee?
Rain and cloud lower output in the wet months, and drainage and cleaning need a plan. Ask any proposal for monthly generation, not only an annual figure, so the monsoon months are visible before you sign.
Is there an Adhvanik engineer near my factory in Uttarakhand?
Our team includes people based in Haridwar. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.
What do the net-metering and open-access rules say in Uttarakhand?
The regulator sets the terms, and the terms move. Our Uttarakhand policy page sets out the current position with sources; read it before you size the plant, because the rules decide whether surplus power is exported, banked or avoided by design.
Free feasibility study
Haridwar, Roorkee, Selaqui or Rudrapur? Tell us your bill
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation