Project · Uttarakhand
Akome Life Care – Haridwar: 600 kWp metal sheet rooftop solar in Uttarakhand
Akome Life Care bought the plant under CAPEX and owns it. The plant has supplied the site since Apr 2025.

- Capacity
- 600 kWp
- Installation
- Metal sheet roof
- Location
- Haridwar, Uttarakhand
- Finance model
- CAPEX
This plant at a glance
- Client
- Akome Life Care
- Industry
- Pharma
- Capacity
- 600 kWp (DC), with 475 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Apr 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 600 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local. Its 600 kWp of modules feed 475 kW of inverters, a DC/AC ratio of 1.26.
Running since Apr 2025, the plant has been through a summer and a monsoon. Its seasonal pattern is now visible. Apr 2025 falls in the hot season.
The plant closest to it in size on our list is ArcelorMittal Nippon Steel – Bahadurgarh (600 kWp, Haryana). Apr 2025 also saw Hexagon Prints – Palghar (350 kWp, Maharashtra) and Simplex Metal Processors – Pithampur (500 kWp, Madhya Pradesh) commissioned. Of the Uttarakhand plants on our list, Balmer Lawrie – Selaqui was commissioned just before it and Blink Infra – Selaqui just after.
More on the area: Uttarakhand · Haridwar and Roorkee. See it in the filterable project list.
On site
3 photos from the plant. Select one to enlarge.
Engineering
The engineering behind a plant like Akome Life Care – Haridwar
The 600 kWp at the plant sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.
Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like the Akome Life Care plant is drawn with those in place, so no row loses output to a shadow that was visible on the first day.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
Who owns the plant, and who runs it
At this Haridwar plant the client carried the capital cost of the 600 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Haridwar
Pharma plants in Uttarakhand
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp600 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Haridwar is a repeat location on the list, with 9 plants listed. The named sectors are FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
Across Uttarakhand our list holds 14 plants in 4 towns, commissioned between 2023 and 2026.
Pharmaceutical plants keep air handling and utilities running around the clock, which gives a solar plant a steady load to serve.
Roof access on a pharma site follows site rules, so installation is planned with the EHS team.
Sector pages: industries we work with. Rules for Uttarakhand: solar policy.
Projects
Other plants on the list
Also in Haridwar
- HUL – Haridwar, 1,126 kWpMetal sheet roof
- HUL – Haridwar, 801 kWpGround mount
- HUL – Haridwar, 800 kWpGround mount
- HUL – Haridwar, 685 kWpGround mount
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other plants on metal sheet roofs
- MTC – Bidadi, 181 kWpMetal sheet roof · Apr 2024
- UCC – Pune, 166 kWpMetal sheet roof · Nov 2023
- Ginni Gopal – Boisar104 kWp · Metal sheet roof · Jan 2023
- Arihant Gold Plast – Sarigam274 kWp · Metal sheet roof · Sep 2022
Common questions
Questions about Akome Life Care – Haridwar
How long has the plant been running?
Apr 2025. That is when the 600 kWp plant in Haridwar began supplying the site, and the generation record runs from then.
Who looks after the 600 kWp plant at Haridwar?
The client owns it, because this Haridwar plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
Can the Akome Life Care – Haridwar design be repeated at my site?
Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.
Guides and glossary
Guides and terms behind a 600 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Want a 600 kWp plant on your own site?
Send your Uttarakhand town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.