Project · Uttarakhand
HUL – Haridwar: 64 kWp ground-mount solar in Uttarakhand
HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 64 kWp
- Installation
- Ground mount
- Location
- Haridwar, Uttarakhand
- Finance model
- CAPEX
This plant at a glance
- Client
- HUL
- Industry
- FMCG
- Capacity
- 64 kWp
- Service
- EPC
- Status
- Operational. Built by Adhvanik Energy; maintained by the client.
64 kWp is at the smaller end of the plants on our list: one roof, with room for a second phase later.
The commissioning month for HUL – Haridwar is still being confirmed, so no date appears in the plant record yet.
For scale, the nearest match in capacity is Plastiblends – Daman (67 kWp, Dadra and Nagar Haveli and Daman and Diu).
On the location pages: Uttarakhand · Haridwar and Roorkee. It is also listed in the full project list.
Engineering
The engineering behind a plant like HUL – Haridwar
For 64 kWp on open land in Haridwar, soil conditions set the foundation type. The layout also has to leave space for the internal roads and fire access of an operating site.
Cable runs are longer than on a roof, so trench routes, cable sizing and the inverter location are fixed early to keep losses down. A ground plant is also easy to reach for cleaning and inspection, because nobody works at height.
On Asset Connect, a 64 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.
Finance model
How the plant is paid for
Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site.
CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.
Haridwar
FMCG plants in Uttarakhand
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp64 kWp here. 33 plants on our list are in this range.
- Type of installation
- Ground mountSpare land inside the plant boundary.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 9 plants in Haridwar, and the plant is one of them. Sectors named there: FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
Across Uttarakhand our list holds 14 plants in 4 towns, commissioned between 2023 and 2026.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar. Rules for Uttarakhand: solar policy.
Projects
Other plants on the list
Also in Haridwar
- HUL – Haridwar, 685 kWpGround mount
- HUL – Haridwar, 436 kWpGround mount
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
- Akome Life Care – Haridwar600 kWp · Metal sheet roof · Apr 2025
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other ground-mount plants
- Syngenta – Aurangabad404 kWp · Ground mount · Jun 2022
- HUL – Orai1,131 kWp · Ground mount · Apr 2022
- HUL – Haridwar, 801 kWpGround mount
- HUL – Haridwar, 800 kWpGround mount
Common questions
What people ask about this plant
How big is the HUL – Haridwar plant?
The list gives 64 kWp for the HUL plant, the module capacity (DC). The inverter rating is not recorded, so no AC figure is shown.
What does the roof mean for the 64 kWp plant at Haridwar?
Ground mount: steel structures on foundations, on land the site owns, with trenches carrying cable back to the panel.
Do you build plants in Uttarakhand?
Yes. 9 plants are listed for Haridwar, among 14 in Uttarakhand. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 64 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Want a 64 kWp plant on your own site?
Send your Uttarakhand town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.