HUL – Haridwar: 1,126 kWp metal sheet rooftop solar in Uttarakhand
HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 1,126 kWp
- Installation
- Metal sheet roof
- Location
- Haridwar, Uttarakhand
- Finance model
- CAPEX
Plant details
- Client
- HUL
- Industry
- FMCG
- Capacity
- 1,126 kWp (DC), with 1,100 kW (AC) of inverters
- Service
- EPC
- Status
- Operational. Built by Adhvanik Energy; maintained by the client.
1,126 kWp is a large plant for any factory, needing a big area and a strong connection to the site's panel. At a DC/AC ratio of 1.02, the inverters seldom run at their limit.
Our list does not yet record when the HUL plant was commissioned. The month will be added once it is confirmed.
Closest in capacity on the list: HUL – Orai (1,131 kWp, Uttar Pradesh).
More on the area: Uttarakhand · Haridwar and Roorkee. See it in the filterable project list.
Engineering
How a 1,126 kWp plant is put together
The plant is one of the metal sheet roof plants on our list. On a shed in Uttarakhand, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.
On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
What CAPEX means here
The CAPEX route puts ownership with the client from the day of commissioning. The plant is the owner's asset, and the owner decides how it is maintained and for how long.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Haridwar
Where HUL – Haridwar sits on our list
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,126 kWp here. 19 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Besides this Haridwar plant, our list has 8 other plants in Haridwar. Between them they cover FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
In Uttarakhand the list shows 14 projects in 4 towns. Named sectors include FMCG; electrical and electronics; pharma; polymer.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar. Rules for Uttarakhand: solar policy.
Projects
More plants near Haridwar
Also in Haridwar
- Legrand – Haridwar537 kWp · RCC · Jan 2024
- HUL – Haridwar, 801 kWpGround mount
- HUL – Haridwar, 800 kWpGround mount
- HUL – Haridwar, 685 kWpGround mount
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other plants on metal sheet roofs
- Lemken – Nagpur477 kWp · Metal sheet roof · Jul 2022
- Arihant Auto – Aurangabad162 kWp · Metal sheet roof · May 2022
- Legrand – Sinnar, 508 kWpMetal sheet roof · Apr 2022
- Soma Resort – Nashik, 50 kWpMetal sheet roof · Feb 2022
Common questions
Questions about HUL – Haridwar
Is 1,126 kWp the module or the inverter size at the plant?
The plant carries 1,126 kWp of modules and 1,100 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. The two ratings sit within 5% of each other, a DC/AC ratio of 1.02.
Who looks after the 1,126 kWp plant at Haridwar?
Under CAPEX the client owns this Haridwar plant. Adhvanik Energy built it, and the client handles day-to-day upkeep itself.
How do I find out if my roof can carry 1,126 kWp?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 1,126 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
Send your Uttarakhand town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.