Contact

Get a free feasibility study for your factory

Tell us where the factory is and roughly what it pays for electricity. An engineer gets back to you within 48 hours. The study that follows takes 7 days, is free and carries no obligation to build with us.

The study gives you

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
  • Budgetary quote

Speak with an industrial solar engineer

+91 22 4618 3484

Monday to Saturday, 9 am – 7 pm IST. Or email solar@adhvanik.com.

Free feasibility study, no obligation. An Adhvanik engineer replies within 48 hours, and the study takes 7 days.

What the study includes, and why we ask

You receive:

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
  • Budgetary quote

Your state, city and monthly bill let the engineer size a plant and test the numbers before the first call. Roof area, address and notes shorten that call, so you can provide them now to save time on the call.

Everything is required unless it is marked (optional).

The engineer calls this number to confirm your site.

A rough range is enough. The engineer asks for the actual bills later.

A guess is fine. Leave it blank if you do not know.

All your sites, including ones you are not asking about today.

Undecided is fine. The study gives you an ROI sheet and a budgetary quote either way.

Helps the engineer find your roof on satellite imagery before the call.

Use “Find on Google Maps”, search for your factory, drop a pin, then tap Share and paste the link here.

After you enquire

What happens after you send the form

  1. 01

    An engineer calls you

    The engineer confirms where the site is, asks what you want solar to do for the plant, and asks for the documents listed below.

    within 48 hours
  2. 02

    We study the site

    Your bills, daytime load and roof go through GreenAdhvanik.

  3. 03

    You get the study

    It covers the items listed at the top of this page.

    7 days
  4. 04

    You decide

    Use the numbers in your own CFO or board discussion.

Before the call

What to have ready for the call

You do not need any of this to send the form, but having it to hand saves follow-up requests.

  • Electricity bills for the last 12 months, for every meter at the site.
  • Sanctioned load or contract demand, as printed on the bill.
  • Roof type and approximate area, with photos or drawings if you have them.
  • Your shift pattern and the hours your heaviest machines run. Solar produces in daylight, so this tells us how much of it you can use directly.
  • Any spare land inside the boundary, or parking, that could carry panels.
  • If you already have a solar plant: who built it and who maintains it today.

Writing about something else? Pick the right inbox

Offices in Mumbai and Ahmedabad

Common questions

Questions people ask before they send the form

What the study covers, what to send and who replies.

What does the feasibility study include?

Four things: financial ROI sheet based on a preliminary design; policy check for your state and connection; roof feasibility and the area available for installation; budgetary quote. You do not need to have chosen CAPEX or a PPA before you ask.

How CAPEX, PPA, lease and EMI compare

What do I have to send? Do I need to upload a bill?

Only the form. You pick a bill range from a list, and nothing is uploaded through the website. The engineer asks for your last 12 months of bills when they contact you. Roof area, address and notes are optional and only shorten that first conversation.

When will someone contact me?

An engineer gets back to you within 48 hours of your enquiry. If you would rather speak first, call +91 22 4618 3484.

Do you work in my state?

Our plants are spread across 17 states, with team members based in 19 cities, including Delhi, Haridwar, Hyderabad, Chennai, Bhopal, Indore. Put your site location in the form and we will confirm.

Can you take over a plant another company built?

Yes. We take over operation and maintenance of plants built by other EPCs under an AMC, and we maintain 170+ factories today. Choose the O&M or AMC option in the form, and tell the engineer who built the plant.

AMC for existing solar plants

Call us+91 22 4618 3484Get a free feasibility study