Locations

Industrial rooftop solar in Karnataka

Two plants at Bidadi on the Bengaluru–Mysuru expressway, commissioned together in April 2024, and a 637 kWp plant with no town recorded.

projects listed here in Karnataka
3
plants built on CAPEX
2
industries named
2
most recent commissioning
Mar 2026

Karnataka

Bidadi, and one plant with no town recorded

Karnataka has 3 projects listed here, and the records are uneven. One has no town recorded. One of the two Bidadi entries has no sector, roof type or finance model, and gives only a capacity of 100 kW (AC).

Bidadi is a town on the Bengaluru–Mysuru expressway, about 32 km from Bengaluru, in Ramanagara taluk. Toyota Kirloskar Motors has a unit there. Both Bidadi entries were commissioned on 1 April 2024, and the one with full details is an automotive plant of 181 kWp on a metal sheet roof.

Bengaluru, 32 km up the road, sits at about 900 m, which keeps its summers mild: the April average high is 34.1°C. Rain comes with the monsoon from June to September, September is the wettest month at about 208 mm, and the annual total is near 1,078 mm. A monthly yield estimate shows those wet months; an annual figure hides them.

The third plant, 637 kWp on a metal sheet roof, was commissioned in March 2026. Of the plants we built, 2 were CAPEX.

Where the plants are

Bidadi, on the Bengaluru–Mysuru expressway

  • 2 projects

    Bidadi

    An automotive plant of 181 kWp on a metal sheet roof, and a second entry of 100 kW (AC), both commissioned on 1 April 2024.

    Automotive

What the list shows

Sectors, roofs and finance models in Karnataka

Counts for the projects listed here in Karnataka.

Sectors

  • Automotive1
  • Textile1

Roof types

  • Metal sheet roof2
  • RCC1

Finance model

  • CAPEX2

Service

  • Built by Adhvanik2
  • O&M only (built by others)1

Of the plants we built, 2 were CAPEX. Where a row has no sector, roof or model, the counts above leave it out instead of guessing.

What to check first

Four questions for an automotive plant near Bengaluru

  1. 01

    Yield for June to September

    Ask for monthly generation, because the rain in the Bengaluru area falls in those four months.

    Guide: performance ratio
  2. 02

    Which capacity is quoted

    One Bidadi entry lists only an AC figure. Ask each proposal to state DC kWp and AC kW side by side, since the two differ.

    Glossary: kWp and kW
  3. 03

    Shift pattern

    Auto-component lines often run in shifts. Ask how your hours line up with the solar day before the plant is sized.

    Guide: reading your electricity bill
  4. 04

    Clamps and fasteners

    Before design starts, get the sheet maker's written position on how an array may be fixed to your roof.

    Metal sheet roof solar

Common questions

What Karnataka factories ask before they buy

Speak with an industrial solar engineer
Why does one Karnataka entry show only an AC capacity?

Its DC capacity is not recorded in the source list, so the page shows 100 kW (AC) and does not estimate a DC figure. DC kWp is the module total; AC kW is what the inverters deliver. The kWp vs kW term explains the gap.

Which Karnataka industries have you built for?

Automotive and textile appear in the list, and one row has no sector. Tell us your factory's town and average monthly bill, and the free 7-day feasibility study starts from those.

Do you work beyond the Bidadi area?

Our Karnataka plants are at Bidadi and one site with no town recorded. If your factory is elsewhere in the state, the same two facts start the study: town and average monthly bill.

Should an automotive plant near Bengaluru buy the plant or use a PPA?

Of the plants we built, 2 were CAPEX. Buying means you own the plant and its savings; a PPA means Adhvanik invests and owns, and you pay for the electricity it generates. Ask for both prices on the same roof and the same tariff.

Compare CAPEX and PPA for your factory

Who covers Karnataka for site visits and enquiries?

Our team includes people based in Bengaluru. Whatever your town, the first step is the same: your location and a recent electricity bill. An engineer replies within 48 hours.

Speak with an industrial solar engineer

What do the net-metering and open-access rules say in Karnataka?

Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.

Get a free feasibility study

Free feasibility study

Karnataka factory near Bengaluru? Ask for the wet-month yield

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study