Short answer
A behind-the-meter plant is sized to your daytime load, so the factory uses almost everything it generates and the saving does not depend on export credits. Net metering, net billing and gross metering matter when a plant produces a surplus, and the national rules and your state set what that surplus is worth. For most large factory plants, size to the load first.
Key takeaways
- Behind-the-meter plants are sized so the factory uses nearly all the output on site; nothing depends on export credits.
- Net metering lets surplus units offset grid units, but national rules point it at loads up to 500 kW, and each state sets the detail.
- Most large factory plants are behind-the-meter, or on gross metering or net billing, so the export value of surplus matters.
- Size to your daytime load, especially weekends and holidays, and the metering choice becomes a smaller decision.
Four ways to meter a factory solar plant
How a plant connects to your electrical system and to your distribution company’s (DISCOM’s) meter decides what each unit it generates is worth. Four arrangements are common. Behind-the-meter, net metering and gross metering each have a glossary entry.
| Arrangement | How it works | What a surplus unit is worth |
|---|---|---|
| Behind-the-meter (self-consumption) | The plant feeds your internal network on your side of the DISCOM meter and is sized so the site uses nearly all of it. | Little or nothing: surplus is avoided by design or curtailed by export control. |
| Net metering | Exports and imports are netted over the billing period on one bidirectional meter. | Up to the value of a grid unit, within the settlement rules of your state. |
| Net billing / net feed-in | Exported units are valued at a rate set by the regulator, separately from what you pay for imports. | The export rate, usually below your import tariff. |
| Gross metering | All generation is metered and sold to the DISCOM; your consumption is billed as before. | The feed-in tariff for every unit, not just the surplus. |
What the national rules say about net metering
The Electricity (Rights of Consumers) Amendment Rules, 2021, notified in June 2021, allow net metering for prosumers with loads up to 500 kW or up to their sanctioned load, whichever is lower. Above that, the rules contemplate net billing or gross metering. They also leave the arrangements for net metering, gross metering, net billing and net feed-in to each state commission’s regulations, issued from time to time.
Two consequences follow for factories. First, many industrial plants are larger than 500 kW, so net metering is often not on the table for them. Second, everything that matters day to day, from settlement periods and banking to credit rates and capacity caps, is decided at state level and changes with new regulations.
Why weekends and holidays decide the answer
A factory that runs through daylight hours, six or seven days a week, can absorb a large plant behind the meter. One that stops on Sundays, runs a single shift or has long holiday shutdowns will produce surplus on those days. That surplus is where the arrangements differ.
Assumptions
- 13,00,000 units a year from the plant
- 5% of output falls on shutdown days and exceeds the site load
- Avoidable cost ₹8.00 per unit for units used on site
- Surplus units a year
- 65,000
- Their value if used on site
- ₹5.2 lakh
- Their value if curtailed behind the meter
- ₹0
- Their value under net billing
- Surplus × the regulated export rate
Small shares of surplus are often cheaper to curtail than to chase, but the answer changes with plant size, shutdown days and your state’s export rate.
Assumed figures to show the method. Not a quote and not a result from any Adhvanik plant.
Time-of-day tariffs add another layer. The 2023 amendment to the same rules sets lower tariffs for solar hours for commercial and industrial consumers, so a unit of solar used at midday may replace a cheaper grid unit than one used at another time. Ask for the saving to be modelled slot by slot.
How much of your saving rests on policy
A plant runs for about 25 years; metering regulations are revised far more often. A behind-the-meter plant sized to the daytime load depends least on those revisions: its value rests on the tariff you already pay, not on export credits. A plant whose economics depend on exporting a large share of its output is exposed if credit rates, banking terms or capacity caps change. Net metering is still worth using where it is available. Know what share of the saving depends on it.
Which arrangement suits which site
- Behind-the-meter suits sites with steady daytime load, larger plants above the net-metering threshold, and owners who want the saving insulated from export rules.
- Net metering suits smaller sites within the threshold whose load varies across the week, where banking surplus for later use is worth more than curtailing it.
- Net billing or gross metering can make sense where the regulated export rate is attractive, but model the saving on that rate, not on your import tariff.
Start from a full year of interval data, including holiday weeks, rather than monthly totals.
Four questions to put to any vendor about metering
Which metering arrangement have you assumed, and is it available for my plant size in my state today?
If the DISCOM will not grant net metering for your plant size, the saving in the proposal disappears.
What share of generation is surplus in your model, and how have you valued it?
Surplus valued at the import tariff inflates the saving.
How is export controlled if surplus cannot be exported?
You need to know how much generation the controller will curtail and when.
What happens to the saving if the state changes its metering rules?
It shows how much of the case rests on policy rather than on your own consumption.
Our feasibility study includes a policy check for your state and connection, so you can see this before you commit.
Sources
Policy and tax rules change. Facts below were checked in Nov 2026; confirm the version in force for your state and tax year before you sign.
- India Environment Portal: Electricity (Rights of Consumers) Amendment Rules, 2021 (June 2021) (opens in a new tab)
- Mercom: Government approves net metering for rooftop solar systems up to 500 kW capacity (30 June 2021) (opens in a new tab)
- Electricity (Rights of Consumers) Amendment Rules, 2023: rule 8A, Time of Day tariff (opens in a new tab)
