Industrial rooftop solar in Rajasthan

One CAPEX plant and one PPA plant: 201 kWp at Sotanala and 480 kWp at Newai, commissioned in 2026 and 2024.

projects listed here in Rajasthan
2
places with a plant
2
industry named
1
most recent commissioning
Mar 2026

Rajasthan

One plant bought, one on a PPA

Rajasthan has 2 projects listed here, and each uses a different finance model. The Sotanala plant (201 kWp, March 2026) was bought outright. The Newai plant (480 kWp, March 2024) is a PPA, so the factory pays for the power and we own and run the plant.

Sotanala RIICO is one of the industrial areas that the Kotputli-Behror district page lists, with Neemrana, Behror, Shahjahanpur and Keshwana. The district was formed in August 2023 from parts of Jaipur and Alwar districts, so older records may show either of those names. Our list gives the village and does not say which estate the plant is in.

Summers in that district are long, hot and dry, with hot winds called lu, and the rain falls in a few months of the year. Wind and dust are the roof questions here: ask for the wind-load basis in writing, and ask how often the modules are washed.

Newai is a tehsil headquarters in Tonk district, on the Jaipur–Kota highway about 70 km from Jaipur, known for small and medium industry, especially edible vegetable oils. The plant listed there serves an FMCG factory and sits on a roof that is partly metal sheet and partly RCC, so one contract carries two mounting designs.

Where the plants are

Sotanala and Newai

  • 1 project

    Sotanala

    A 201 kWp CAPEX plant on a metal sheet roof, commissioned in March 2026.

  • 1 project

    Newai

    A 480 kWp PPA plant for an FMCG factory, on a metal sheet and RCC roof, commissioned in March 2024.

    FMCG

What the list shows

Sectors, roofs and finance models in Rajasthan

Counts for the projects listed here in Rajasthan.

Sectors

  • FMCG1
  • General industrial1

Roof types

  • Metal sheet + RCC + Ground mount1
  • Metal sheet roof1

Finance model

  • CAPEX1
  • PPA / OPEX1

By finance model, 1 was CAPEX and 1 was PPA / OPEX. The two plants put CAPEX and PPA side by side in one state, but two plants are too few to say which suits Rajasthan factories better.

What to check first

Four checks before you pick CAPEX or PPA in Rajasthan

  1. 01

    A roof of two materials

    Where metal sheet and RCC share a site, each needs its own mounting, ballast and waterproofing plan. Ask for them as separate drawings.

    RCC roof solar
  2. 02

    Wind on the roof

    Ask for the wind-load basis of the mounting in writing, with the roof sheet maker's comment on it.

    Metal sheet roof solar
  3. 03

    Who washes the modules

    Dust settles between rains. The proposal should name the washing interval and who pays for the water.

    Solar O&M and AMC
  4. 04

    CAPEX against PPA on one roof

    Ask for both prices on the same roof, then compare them across the whole PPA term, not only the first year.

    Solar PPA for factories

Common questions

What Rajasthan factories ask before they buy

Speak with an industrial solar engineer
Can a Rajasthan factory get solar with no capital outlay?

Yes. The Newai plant is a PPA: the factory buys the power and we own and maintain the plant. By finance model, 1 was CAPEX and 1 was PPA / OPEX. The free 7-day feasibility study prices CAPEX and PPA for your roof.

Solar PPA for factories

Which Rajasthan areas have you worked in?

Sotanala, which the Kotputli-Behror district page lists as an RIICO industrial area, and Newai in Tonk district. Tell us your factory's town and average monthly bill if you are elsewhere in the state.

What changes when a roof is part metal sheet and part RCC?

The two surfaces take different fixings. Metal sheet needs clamps that respect the sheet warranty; RCC needs ballast or anchors and a waterproofing detail at every penetration. Ask for each as its own design, with one monitoring system across both.

Is there an Adhvanik engineer near my factory in Rajasthan?

Our team includes people based in Jaipur. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.

Speak with an industrial solar engineer

What do the net-metering and open-access rules say in Rajasthan?

Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.

Get a free feasibility study

Free feasibility study

CAPEX or PPA for a Rajasthan roof? Get both priced

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation