Solar O&M
Solar O&M for factory plants, with uptime and performance guarantees
Adhvanik Energy's own engineers watch, fix and answer for the plants we build, on contracts of up to 25 years. You receive a monthly report signed by an engineer, and lost generation is credited at ₹3.00/kWh when the plant falls short of its guarantee.
- average asset uptime
- 99%
- factories under active maintenance
- 170+
- uptime guarantee
- 95%
The commitments
What is guaranteed, how we respond and what is a result
Your signed contract sets the final terms.
| Item | What it says | What it means for you |
|---|---|---|
| Contractual commitmentsWritten into the contract | ||
| Uptime | 95% uptime guarantee | The plant has to be available to generate. Availability is measured on the plant. |
| Performance ratio | A performance-ratio guarantee | A plant can be switched on and still underperform. PR catches dust, string faults and derating that uptime alone misses. |
| Shortfall | Lost generation is credited at ₹3.00/kWh | The credit is paid per unit lost against the guarantee. |
| Contract term | Up to 25 years available | Long enough to cover the working life of the plant, so the people who built it stay answerable for it. |
| Breakdown responseHow we respond to a fault | ||
| Remote response | Within 1 working day | An engineer reads the plant data, isolates the cause and fixes it remotely where possible. |
| Engineer on site | Within 2 working days | If the fault cannot be fixed remotely, an engineer attends site within this window. |
How performance is measured
Uptime and performance ratio
They answer different questions, so the contract uses both.
| Question | Uptime | Performance ratio (PR) |
|---|---|---|
| The question it answers | Was the plant available to generate? | How well did the plant turn the sunlight it received into electricity? |
| What it catches | An inverter that trips, a breaker that opens, a plant that is switched off. | Dust on the modules, string faults and derating, when the plant is on but producing less than it should. |
| A cloudy week | Does not count as downtime: the plant is available, there is just less sun. | Allowed for. PR compares output with the sunlight received, so a cloudy week lowers generation but barely moves PR. |
| In the contract | 95% uptime guarantee | A performance-ratio guarantee |
If the plant falls short
Lost generation is credited at ₹3.00/kWh. The credit is measured against the guarantee, so a shortfall costs us money too.
Illustration, not a quote. At ₹3.00/kWh, 1,000 kWh of lost generation would be a credit of ₹3,000.
Ask your contract
- Over what period is the shortfall measured?
- What is excluded, for example a grid outage?
- How and when is the credit applied?
Fault response
How a fault is found and fixed
What happens when a string, an inverter or a breaker underperforms.
- 01
The alert
Asset Connect raises an alert when generation or performance ratio falls below where it should be for the sunlight the plant is getting.
- 02
Remote response
An engineer reads the inverter and string data, finds the likely cause and fixes it remotely where possible.
- 03
On site
If the fault cannot be fixed remotely, an engineer attends, already knowing what to look for.
- 04
Closed and reported
The fix goes into that month’s signed report. Lost generation within the guarantee is counted against it.
What the team does
What our standard O&M scope includes
Every O&M (operation and maintenance) contract starts from this scope.
4 preventive maintenance cycles a year
Up to 10 breakdown visits a year
Daily remote monitoring
Subscription to the Asset Connect software included
Performance monitoring and enhancement
Cleaning
Module cleaning, checked with AI
Factory roofs collect dust from yards, roads and process exhaust, and dirty modules lose output. Our standard scope includes 24 to 26 cleaning cycles a year, more where site conditions need them, and cleaning quality is audited with AI-enabled checks.
- Each cleaning round verified by AI-enabled checks
- Output tracked on Asset Connect, so the effect of each round is visible
Coverage
In-house engineers, based close to the plants
The engineer who attends your plant works for the company that built it and carries its guarantee, so there is no hand-off to a separate maintenance contractor. Attending site within 2 working days depends on engineers living near the plants.
Team members are based in
- Delhi
- Haridwar
- Hyderabad
- Chennai
- Bhopal
- Indore
- Aurangabad
- Pune
- Nagpur
- Daman & Diu
- Jaipur
- Bengaluru
- Kolkata
- Baddi (Himachal Pradesh)
- Gurugram (Haryana)
- Guwahati
- Noida (Uttar Pradesh)
- Patna
- Vijayawada
- States we have worked in
- 17
- Cities where our team is based
- 19
- team members
- 100+
Offices: Mumbai (head office) and Ahmedabad (corporate & technical office). The cities above are where our people are based, separate from our offices.

Safety
Safe access for the people who maintain the roof
O&M means people working on factory roofs for the life of the plant. Walkways and safety lines are designed in, with handrails where the risk assessment calls for them.
- Dedicated safety department
- Site-level safety inspections
- Mandatory walkways and safety lines
- Handrails and safety mesh based on site risk assessment
- Documented closure of every EHS observation
On site
Our O&M engineers, on site
Site visits, roof inspections and work at height are done by our own engineers, in hard hats and high-visibility vests, with a harness where the roof calls for one.

Ajay Bhade, O&M EngineerSite visit on a client rooftop 
Naveen MV, O&M EngineerSafe access to the roof 
Satrajeet Singh, O&M EngineerHarness on for work at height 
Arjun Sharma, O&M EngineerInspection in the panel room
Existing plants
Plant built by another EPC?
We take over maintenance of plants built by other companies under an AMC (annual maintenance contract), and move them onto Asset Connect. Many clients have seen generation rise by 5 to 10% after the move; that is an average, not a guarantee.
- Guarantee levels set after a review of the plant
- Remote response within 1 working day
- Monthly report signed by an engineer
Common questions
Guarantees, response times, cloudy weeks and scope
Answers reflect how our standard O&M contract works. Your signed contract governs.
Speak with an industrial solar engineerWhat does the 95% uptime guarantee mean?
It is a written commitment in our O&M contract that the plant's availability will be at least 95%. The contract also carries a performance-ratio guarantee. Lost generation is credited at ₹3.00/kWh. How availability is measured is set in your signed contract.
What is the difference between uptime and performance ratio?
Uptime says whether the plant was available to generate. Performance ratio (PR) says how well it turned the sunlight it received into electricity. A plant can be on all day and still lose output to dust on the modules or a faulty string; uptime would look fine and PR would fall. That is why the contract has both.
What happens if the plant generates less than guaranteed?
Lost generation is credited at ₹3.00/kWh. For example, 1,000 kWh of lost generation would be a credit of ₹3,000. How the shortfall is measured, and over what period, is set in your contract.
Is the 99% average uptime a guarantee?
No. 99% is the average asset uptime across the plants we maintain, a result. The guarantee in the contract is 95%.
How fast do you respond to a fault?
We respond remotely within 1 working day. If the fault cannot be fixed remotely, an engineer attends site within 2 working days.
What happens to generation in the monsoon or on cloudy days?
Every solar plant generates less under cloud. Performance is judged by performance ratio, which compares output with the sunlight the plant received, and Asset Connect tracks irradiance next to generation for this reason. A cloudy week lowers generation but barely moves PR. A fault lowers both.
Who does the maintenance work?
Our in-house O&M team, dedicated to client sites. The engineer who attends your plant works for the company that built it and carries the guarantee. Team members are based in 19 cities. Today we maintain 170+ factories.
How long can an O&M contract run?
Up to 25 years. A contract can cover the working life of the plant, because we built it and expect to stand behind it.
Our plant was built by another company. Can you maintain it?
Yes. We take over operation and maintenance of plants built by other EPCs under an AMC (annual maintenance contract). The guarantee levels are set after we review the plant. AMC pricing typically ranges from ₹500 to ₹1,000 per kW a year, depending on the plant's capacity, its age and site conditions. We quote after reviewing the plant. We also carry out standalone plant audits for plants we did not build.
Projects
Recent plants, state by state
The newest plant we have commissioned in each of six states.
450 kWp
MYK Laticrete – Durgapur
West Bengal
Commissioned Oct 2026
- 531 kWp
FUSO Glass – Sriperumbudur
Tamil Nadu
Commissioned Oct 2026
- 450 kWp
MYK Laticrete – Vadodara
Gujarat
Commissioned Sep 2026
- 332 kWp
HUL – Haridwar, 332 kWp
Uttarakhand
Commissioned Jul 2026
1,332 kWp
Exotic Fruits – Nashik
Maharashtra
Commissioned Jul 2026
- 210 kWp
HUL – Rajpura
Punjab
Commissioned Jul 2026
Guides and glossary
The terms behind the guarantees
Terms used on this page
O&M assessment
Want these guarantees on your plant?
Tell us where your factory is and what it runs on today. An engineer gets back to you within 48 hours.
What our O&M contracts carry
- 95% uptime guarantee plus a performance-ratio guarantee
- Lost generation is credited at ₹3.00/kWh
- Remote response within 1 working day
- Contracts of up to 25 years
