Locations
Industrial rooftop solar in Bihar
Two FMCG plants on metal sheet roofs, each above a megawatt-peak: 1,600 kWp at Bihta and 1,050 kWp at Hajipur, commissioned a month apart in late 2025.
- projects listed here in Bihar
- 2
- places with a plant
- 2
- industry named
- 1
- most recent commissioning
- Nov 2025
Bihar
Two FMCG plants above one megawatt-peak
Both Bihar plants are above a megawatt-peak. Hajipur (1,050 kWp) was commissioned on 18 October 2025 and Bihta (1,600 kWp) on 16 November 2025, 29 days later. Both are FMCG plants, both sit on metal sheet roofs and both were bought on CAPEX.
At this size the roof is the main design input: how much of it is sound, how much the plant's own stacks and silos shade, and what the purlins can carry. A structural check comes before a layout, and the inverter count and cable route follow from the layout.
Bihta is a town in Patna district, about 30 km west of Patna, with a dry port and an oil depot near its railway station. Hajipur is the headquarters of Vaishali district, on the north bank of the Ganga about 10 km from Patna, and BIADA maintains an industrial area of around 150 acres there where several FMCG and agro-based companies have units. Our list names the towns and leaves out the estates.
Rain is concentrated: Hajipur averages about 993 mm a year, most of it from June to September, and July alone brings about 266 mm. Patna district's May daily maximum averages about 38.9°C. A proposal for either town should show how the monsoon months change monthly yield.
Where the plants are
Bihta and Hajipur
1 project
Bihta
A 1,600 kWp FMCG plant on a metal sheet roof in Patna district, commissioned in November 2025.
FMCG
1 project
Hajipur
A 1,050 kWp FMCG plant on a metal sheet roof in Vaishali district, commissioned in October 2025.
FMCG
What the list shows
Sectors, roofs and finance models in Bihar
Counts for the projects listed here in Bihar.
Sectors
- FMCG2
Roof types
- Metal sheet roof2
Finance model
- CAPEX2
By finance model, 2 were CAPEX. Sector and roof type are the same for both rows, so the page cannot say how another sector or roof would compare.
Projects
Plants listed in Bihar
Newest first.
What to check first
Checks for a megawatt-scale metal roof in Bihar
- 01
Structural check before layout
Ask for purlin spans, sheet gauge and the load each can take before anyone draws module rows.
Metal sheet roof solar - 02
Monsoon-month yield
Ask for generation month by month, so June to September are visible instead of folded into a yearly total.
Guide: performance ratio - 03
Plant size against contract demand
Check the plant's AC capacity against your contract demand and daytime load before the size is fixed.
Guide: reading your electricity bill - 04
Response time in the O&M contract
Ask what response time is committed and which city the engineer travels from.
Solar O&M and AMC
Guides and glossary
Guides and terms for Bihar factories
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
- How rooftop solar pays back for Indian industryRead the guide
Terms used on this page
Why do the Bihar plants show a kWp figure and a different kW (AC) figure?
Bihta is 1599.97 kWp of modules (DC) behind 1250 kW of inverter capacity (AC). Hajipur is 1050.08 kWp against 825 kW (AC). The DC to AC ratio term explains why designers size modules above inverters.
Which Bihar industrial areas have you built in?
Our list names the towns, Bihta and Hajipur, and leaves out the estate. If your factory is in Bihar, give us your town and average monthly bill; the free 7-day feasibility study starts from those.
Were the Bihar plants CAPEX or PPA?
By finance model, 2 were CAPEX. The financing pages compare the two, and the study gives you an ROI sheet and a budgetary quote for your roof.
How should a Bihar factory size a plant of a megawatt or more?
Start from the daytime load on your bill and from the roof area that is sound, then check the plant's AC capacity against your contract demand. The two Bihar plants are both over a megawatt-peak on metal sheet, which is the scale at which a structural check comes before any layout.
Who covers Bihar for site visits and enquiries?
Our team includes people based in Patna. Whatever your town, the first step is the same: your location and a recent electricity bill. An engineer replies within 48 hours.
What do the net-metering and open-access rules say in Bihar?
Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.
Free feasibility study
Large metal roof in Bihar? Ask for the structural check first
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation