Case studies

Industrial solar case studies

Six factory projects: Hindustan Unilever, Dabur India, Legrand India, Samruddhi Industries, Atomberg Technologies and Mahyco. Each case sets out the problem the plant had to solve, how it was engineered and built, and how it is paid for. Plant details come from our commissioning records.

Rooftop solar arrays across a metal sheet factory roof, with trees beyond

All case studies

Six cases, filtered by finance model

CAPEX: the client buys and owns the plant. PPA: Adhvanik owns it and the client pays for each unit it generates. Pick the one closer to how you would want to pay.

Compare

Find the case closest to your site

Match on roof type first, then on industry and how you want to pay.

Each case links to the plants it covers on our published project list.
Client and locationIndustryRoof / configurationFinance modelProblem solved
Hindustan UnileverHaridwar, UttarakhandFMCGGround mountCAPEXSolar whose value does not depend on net-metering rules
Dabur IndiaPantnagar (SIDCUL Rudrapur), UttarakhandFMCGMetal sheet + RCCPPA / OPEXGoing green without tying up capital
Legrand IndiaHaridwar + Sinnar (Nashik)Electrical & ElectronicsRCC + metal sheetPPA / OPEXSix roofs, five tilts and two roof profiles at one site
Samruddhi IndustriesKolhapur + Sangli, MaharashtraPolymerMetal sheetCAPEXSolar on metal sheet with no fixings through the roof
Atomberg TechnologiesPune (Khed), MaharashtraElectrical & ElectronicsMetal sheetCAPEXMatching plant size to a daytime-heavy load
MahycoBuldhana, MaharashtraAgroMetal sheetCAPEXA load that peaks four months a year

What each case covers

Every case answers the same four questions

They are the questions a CFO and a plant head ask before signing, in the order they ask them.

The challenge

The problem the plant had to solve: a roof that could not be drilled, a seasonal load, plants in two states, or a need to keep capital free.

The solution and its delivery

How we sized, mounted and connected the plant, and how it was built: structure, inverters, layout and metering, written for the plant head who has to live with it.

The finance model

Whether the client owns the plant (CAPEX) or buys the electricity under a PPA, and why that suited the site.

The record

Plant names, locations, capacities and commissioning months from our project records, so you can check the facts behind each story.

Track record

Company-wide figures

85% of our clients have given us another project, as several of the manufacturers above have.

industrial clients
50+
of our clients have given us another project
85%
factories under active maintenance
170+
average asset uptime
99%

Free feasibility study

Want a case study like these for your factory?

Send us your roof type and last year’s electricity bills. We will tell you what a plant would involve at your site, and whether CAPEX or a PPA fits better.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study