PPA: power purchase agreement

A power purchase agreement (PPA) is a long-term contract under which a developer builds, owns and runs a solar plant at your site, and you pay a per-unit tariff, agreed in advance, for the units it generates (plus any deemed-generation units the contract specifies).

How a solar PPA works

The developer, often called a RESCO, studies your bills and roof, then pays for the design, equipment and construction itself. Once the plant is running, a meter records every unit it generates, and you receive a monthly bill for those units at the PPA tariff. You never pay for panels, inverters or structure.

The tariff is either flat for the whole term or rises by a small fixed step each year; the contract says which. Because the developer earns only when the plant generates, it carries the cost of breakdowns, cleaning and repairs. At the end of the term the plant is usually handed over to you or the contract is renewed, on terms set out on day one.

Why factories choose a PPA

  • No capital. Your capex budget stays with production lines.
  • Savings from the first bill. If the PPA tariff is below the energy charge you pay your distribution company (DISCOM), every unit saves money from month one.
  • Performance risk sits with the owner. A plant that stops generating stops earning for the developer.
  • A known price. A tariff set in the contract takes a share of your power cost out of future grid tariff revisions.

The trade-off: over the life of the plant you save less than an owner would, because the developer needs a return on its capital. Ask your auditor how the contract will be treated in your accounts; some PPAs are assessed as leases under Ind AS 116, the lease accounting standard. The other route is to own the plant: see CAPEX vs OPEX.

What sets a PPA tariff

A PPA tariff is the developer's cost and return spread over the units the plant will produce. Six things move it: the plant's capital cost, how much sunlight your location gets, how easy your roof is to build on, the length of the term, your company's credit profile, and your state's rules on metering and export. A longer term and a stronger balance sheet usually mean a lower tariff.

Illustrative example

Worked example: year-one saving

A factory with a 500 kWp rooftop plant under a PPA.

Plant size
500 kWp
Generation assumed
1,300 kWh per kWp a year = 6,50,000 kWh
Grid energy charge you avoid
₹8.00 per kWh
PPA tariff
₹4.50 per kWh
Saving per unit
₹3.50

Year-one saving: 6,50,000 kWh × ₹3.50 = ₹22.75 lakh, with no capital spent.

Illustrative numbers only, not a quote. Real figures depend on your tariff, roof and location.

Clauses to check before you sign

  • Tariff and escalation: flat for the term, or rising each year, and by how much
  • Deemed generation: whether you pay for units lost to grid outages or your own shutdowns
  • Lock-in, early termination and the buy-out price schedule, year by year
  • What happens if you relocate, expand or need to repair the roof
  • Who insures the plant and who pays if it is damaged
  • Generation guarantee, and how a shortfall is compensated
  • Transfer of the plant at the end of the term, and at what price

PPAs with Adhvanik

Adhvanik invests, owns and runs the plant; you pay per unit, with zero upfront investment and a tariff set in the contract, below your grid rate. We sign 5–25 year PPAs, with PPAs running to 2040 and 2051.

How our PPA / OPEX model works

Related terms

  • Contracts & finance

    RESCO

    Renewable energy service company: a developer that invests in, owns and operates a solar plant on your premises and sells you the power under a PPA.

  • Contracts & finance

    CAPEX vs OPEX

    The two main ways to pay for factory solar: buy and own the plant (CAPEX), or let a developer own it and pay a per-unit tariff for its power (OPEX, through a PPA).

  • Grid & policy

    Behind-the-meter

    A plant connected on your side of the DISCOM's meter, so its power is used directly by your factory and only the shortfall comes from the grid.

  • Contracts & finance

    LCOE

    Levelised cost of energy: a plant's lifetime costs divided by the energy it will produce over its life, both discounted to today. A standard way to compare a solar unit with a grid unit.

Keep reading

Free feasibility study

Get a budgetary quote for your roof

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study