Uttarakhand
Industrial rooftop solar in Haridwar and Roorkee
10 plants in Haridwar district: consumer goods, pharma, polymers and electrical equipment, on mixed roofs.
- projects listed here in Haridwar and Roorkee
- 10
- places with a plant
- 2
- industries named
- 4
- most recent commissioning
- Jul 2026
The industrial belt
SIDCUL and Haridwar district
SIDCUL, the State Infrastructure and Industrial Development Corporation of Uttarakhand, was set up in 2002 and developed the Integrated Industrial Estate at Haridwar under the state's industrial package of 2003. Roorkee is a city in Haridwar district, about 31 km from Haridwar.
Our list names the town only. The four plants here span a consumer-goods warehouse, a pharma plant, a polymer plant and an electrical-equipment plant, which makes this one of the more varied belts in the list.
Sources: SIDCUL (opens in a new tab), Roorkee (opens in a new tab). As of Nov 2026.
Our plants here
Warehouse, pharma, polymer and electrical plants
The 10 plants listed here were commissioned between 2024 and 2026. Named sectors: FMCG, electrical and electronics, pharma and polymer. By roof: 5 on ground mount, 3 on metal sheet roofs and 2 on RCC. Among the plants we built here, 9 were CAPEX and 1 was PPA / OPEX.
A warehouse and a process plant need different structures, so ask for a design per roof.
Projects
Plants listed in Haridwar and Roorkee
Newest first.
- 332 kWp
HUL – Haridwar, 332 kWp
Uttarakhand
Commissioned Jul 2026
600 kWp
Akome Life Care – Haridwar
Uttarakhand
Commissioned Apr 2025
- 300 kWp
Plastiblends – Roorkee
Uttarakhand
Commissioned Apr 2024
537 kWp
Legrand – Haridwar
Uttarakhand
Commissioned Jan 2024
- 1,126 kWp
HUL – Haridwar, 1,126 kWp
Uttarakhand
- 801 kWp
HUL – Haridwar, 801 kWp
Uttarakhand
- 800 kWp
HUL – Haridwar, 800 kWp
Uttarakhand
- 685 kWp
HUL – Haridwar, 685 kWp
Uttarakhand
- 436 kWp
HUL – Haridwar, 436 kWp
Uttarakhand
- 64 kWp
HUL – Haridwar, 64 kWp
Uttarakhand
What to check first
Per-roof design and monsoon checks in Haridwar and Roorkee
- 01
Per-roof design
Warehouses and process buildings need different structures. Ask for a design per roof.
Industrial solar solutions - 02
Heavy monsoon
Ask how drainage, cleaning and module tilt are planned for the wet season.
Solar O&M and AMC - 03
Rules for your connection
Read the current Uttarakhand rules on metering and surplus power before you size.
Uttarakhand solar policy
Guides and glossary
Guides and terms for Haridwar and Roorkee factories
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Common questions
What Haridwar and Roorkee factories ask before they buy
Speak with an industrial solar engineerDo you build inside SIDCUL estates?
Our plants are listed by town. If your factory is in an integrated industrial estate in Haridwar or elsewhere, the form asks for your town and average monthly bill, and the free 7-day feasibility study follows from those.
Which sectors are the plants in?
FMCG, electrical and electronics, pharma and polymer. The projects above show each with its commissioning month.
Are they CAPEX or PPA?
Among the plants we built here, 9 were CAPEX and 1 was PPA / OPEX. The financing pages compare the two.
Can a warehouse in Haridwar go solar on the ground instead of the roof?
Yes. One plant listed here is a ground-mount array for a consumer-goods warehouse. A ground array needs spare land inside the boundary, a soil check and a layout that keeps room for future sheds.
Who covers Haridwar and Roorkee for site visits and enquiries?
Our team includes people based in Haridwar. Whatever your town, the first step is the same: your location and a recent electricity bill. An engineer replies within 48 hours.
Free feasibility study
Haridwar or Roorkee factory? Start with your bill
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation