Project · Uttarakhand
Balmer Lawrie – Selaqui: 530 kWp metal sheet rooftop solar in Uttarakhand
Adhvanik Energy owns and runs it, and Balmer Lawrie pays for each unit the plant generates, under a PPA. The plant has supplied the site since Dec 2024.
- Capacity
- 530 kWp
- Installation
- Metal sheet roof
- Location
- Selaqui, Uttarakhand
- Finance model
- PPA / OPEX
Size, roof and finance model
- Client
- Balmer Lawrie
- Capacity
- 530 kWp (DC), with 440 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Dec 2024
- Status
- Operational. Owned and run by Adhvanik Energy.
A 530 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. The array is 21% larger than the inverters, a DC/AC ratio of 1.21.
With a commissioning month of Dec 2024, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Dec 2024 fell in the low-sun winter months.
For scale, the nearest match in capacity is FUSO Glass – Sriperumbudur (531 kWp, Tamil Nadu). Dec 2024 also saw Simplex Metal Processors – Pithampur (350 kWp, Madhya Pradesh) and Ronch Polymer – Daman (478 kWp, Dadra and Nagar Haveli and Daman and Diu) commissioned. Of the Uttarakhand plants on our list, Plastiblends – Roorkee was commissioned just before it and Akome Life Care – Haridwar just after.
Solar in the area: Uttarakhand. See it in the full project list.
Engineering
What a metal sheet rooftop plant involves
The 530 kWp at Balmer Lawrie – Selaqui sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.
Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 530 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
Who owns the plant, and who runs it
The plant gets its solar through a PPA: 530 kWp on its site, owned by Adhvanik Energy and paid for per unit generated, at the tariff in the contract.
Because we own the plant, we carry its performance: our O&M team runs it, and its output is what the contract is priced on. PPAs run 5 to 25 years.
Selaqui
The area around Balmer Lawrie – Selaqui
- Solar resource here
- 1,751 kWh/m² a yearAbout 1,571 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Selaqui; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp530 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
Besides the Balmer Lawrie plant, our list has 1 other plant in Selaqui. The sector named there is warehousing.
Across Uttarakhand our list holds 14 plants in 4 towns, commissioned between 2023 and 2026.
Sector pages: industries we work with. Rules for Uttarakhand: solar policy.
Projects
Other plants on the list
Also in Selaqui
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
Elsewhere in Uttarakhand
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other plants on metal sheet roofs
- Soma Resort – Nashik, 50 kWpMetal sheet roof · Feb 2022
- Ronch Polymer – Pune, 196 kWpMetal sheet roof · Jan 2022
- Ronch Polymer – Pune, 332 kWpMetal sheet roof · Jan 2022
- Apex Knives – Nagpur200 kWp · Metal sheet roof · Dec 2021
Common questions
What people ask about this plant
What is the commissioning date of the Balmer Lawrie – Selaqui plant?
Our list records Dec 2024. With a full year on record, a month that falls short of the same month last year stands out.
Who looks after the 530 kWp plant at Selaqui?
Under the PPA the plant is ours and so is its upkeep. The client at the Balmer Lawrie plant buys the electricity it produces at the tariff set in the contract.
Could a plant like this Selaqui plant fit my factory?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 530 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Uttarakhand site
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.