Knowledge base

Industrial solar guides for factory CFOs, plant heads and directors

Six guides for the people who sign off a factory solar project: how to pay for a plant, what it saves on your bill, what to build on your roof and how to judge the plant once it runs. Each one opens with a short answer.

Start here

Pick the guides for your role

A solar decision passes through finance, the plant and the board, and each asks different questions. Start with the three guides listed for your role.

All guides

Every guide, by topic

Financing comes first because most boards ask about money first. Policy, operations and engineering follow.

How we write them

Every rule is sourced and every example is labelled

Someone signing a 25-year decision needs to see where each figure comes from. Every guide cites its sources, labels illustrative numbers and carries a date. Nitish Mehta, Co-Founder, is the named technical author.

  • Sources for every rule

    Tax, tariff and metering rules are linked to the notification or a reliable summary of it, with the date we checked.

  • Illustrative numbers labelled

    Worked numbers are labelled illustrative and show the method. They are not quotes or results from our plants.

  • State rules flagged where they decide the detail

    Where a state decides the detail, the guide says so and quotes no figure that may not apply to you.

  • Questions you can ask anyone

    Each guide ends with questions to put to any vendor, including us.

Free feasibility study

Put your factory’s numbers through the same method

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study