Project · Uttarakhand
Dabur – Rudrapur: 1,000 kWp rooftop solar on two roof types in Uttarakhand
Generating since Nov 2023. Adhvanik Energy owns and runs it, and Dabur pays for each unit the plant generates, under a PPA. It is one of 5 Dabur plants on our project list.
- Capacity
- 1,000 kWp
- Installation
- Metal sheet + RCC
- Location
- Rudrapur, Uttarakhand
- Finance model
- PPA / OPEX
Size, roof and finance model
- Client
- Dabur
- Industry
- FMCG
- Capacity
- 1,000 kWp (DC), with 750 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Nov 2023
- Status
- Operational. Owned and run by Adhvanik Energy.
At 1,000 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local. Its 1,000 kWp of modules feed 750 kW of inverters, a DC/AC ratio of 1.33.
Commissioned in Nov 2023, the plant has several seasons of data. The question now is whether performance ratio has held steady. Nov 2023 came just after the monsoon, a clear-sky start.
For scale, the nearest match in capacity is Mitsubishi Electric – Pune (1,000 kWp, Maharashtra). HUL – Kandla (160 kWp, Gujarat) and Dabur – Rudrapur (400 kWp) were also commissioned in Nov 2023. Its nearest neighbour in Uttarakhand, in order of commissioning, is Dabur – Rudrapur, 400 kWp.
More on the area: Uttarakhand. See it in the projects index.
Engineering
How a 1,000 kWp plant is put together
The 1,000 kWp at the plant is split between roof types. Each block is designed on its own terms, and the blocks are then tied into one electrical design with a single metering and monitoring arrangement.
Walkways differ by block: fixed paths on the sheet roofs, where the sheet was not built for foot traffic, and marked routes between rows on the slabs.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
How the plant is paid for
The Dabur plant is a PPA / OPEX plant. Adhvanik Energy invested in it, owns it and runs it, and the client pays for each unit it generates at the tariff in its contract, with no capital of its own.
A PPA keeps the client's capital free for the factory itself; its cost is the tariff on the units the plant generates.
Rudrapur
Where Dabur – Rudrapur sits on our list
- Solar resource here
- 1,781 kWh/m² a yearAbout 1,533 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Rudrapur; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,000 kWp here. 19 plants on our list are in this range.
- Type of installation
- Metal sheet + RCCMetal sheet and RCC roofs, each with its own mounting.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
Rudrapur is a repeat location on the list, with 2 plants listed. Its one named sector is FMCG.
Across Uttarakhand our list holds 14 plants in 4 towns, commissioned between 2023 and 2026.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar. Rules for Uttarakhand: solar policy.
Projects
Other plants on the list
Also in Rudrapur
- Dabur – Rudrapur, 400 kWpMetal sheet + RCC · Nov 2023
Elsewhere in Uttarakhand
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
Other FMCG plants
- Britannia – Bihta1,600 kWp · Metal sheet roof · Nov 2025
- Britannia – Hajipur1,050 kWp · Metal sheet roof · Oct 2025
- Dabur – Indore500 kWp · Metal sheet roof · Feb 2025
- Dabur – Newai480 kWp · Metal sheet + RCC + Ground mount · Mar 2024
Common questions
Questions about Dabur – Rudrapur
How big is the Dabur – Rudrapur plant?
This Rudrapur plant has 1,000 kWp of modules (DC) feeding 750 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.33: the array is rated above the inverters, which cap what the plant can feed the site at any moment.
What roof is the plant built on?
The plant spans metal sheet and RCC roofs, so each block follows its own checks: wind uplift and sheet condition on sheet, load and waterproofing on slabs.
Do you build plants in Uttarakhand?
Yes. 2 plants are listed for Rudrapur, among 14 in Uttarakhand. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 1,000 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Want a 1,000 kWp plant on your own site?
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.