Plastiblends – Roorkee: 300 kWp RCC rooftop solar in Uttarakhand
Plastiblends bought the plant under CAPEX and owns it. The plant has supplied the site since Apr 2024. It is one of 6 Plastiblends plants on our project list.
- Capacity
- 300 kWp
- Installation
- RCC
- Location
- Roorkee, Uttarakhand
- Finance model
- CAPEX
Plant details
- Client
- Plastiblends
- Industry
- Polymer
- Capacity
- 300 kWp (DC), with 268 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Apr 2024
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 300 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters. 268 kW of inverters serve 300 kWp of modules: a DC/AC ratio of 1.12.
Commissioned in Apr 2024, the plant has several seasons of data. The question now is whether performance ratio has held steady. Apr 2024 put its first months in the hot, dusty season.
Closest in capacity on the list: Blink Infra – Sarai Sahjadi (300 kWp, Uttar Pradesh). Apr 2024 also saw Plastiblends – Daman (200 kWp, Dadra and Nagar Haveli and Daman and Diu) and MTC – Bidadi (181 kWp, Karnataka) commissioned. Of the Uttarakhand plants on our list, Legrand – Haridwar was commissioned just before it and Balmer Lawrie – Selaqui just after.
Solar in the area: Uttarakhand · Haridwar and Roorkee. Find this plant in the projects index.
Engineering
How a 300 kWp plant is put together
Plastiblends – Roorkee is on an RCC roof, a flat concrete slab. A plant on a slab is held down by ballast, by anchors fixed into the concrete, or by a mix of both, and the choice follows how much extra weight the slab can carry and the condition of its waterproofing.
Parapets and tanks cast long shadows in December, when the sun is low. Rows on a slab like this are spaced for that month, so winter shading does not cut output below what the design assumed.
Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Roorkee call for them, with AI-enabled checks on cleaning quality.
Finance model
How the plant is paid for
CAPEX is the model where the client buys the plant. For the Plastiblends plant, that means the 300 kWp system is the client's property since Apr 2024, with the savings and the upkeep decisions on the client's side.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Roorkee
Where Plastiblends – Roorkee sits on our list
- Solar resource here
- 1,740 kWh/m² a yearAbout 1,512 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Roorkee; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp300 kWp here. 36 plants on our list are in this range.
- Type of installation
- RCCA flat concrete slab, ballasted or anchored.
- Finance option
- CAPEXThe factory owns the plant from day one.
This Roorkee plant is the only Roorkee plant on our list.
Roorkee is covered on the page for Haridwar and Roorkee, which lists 10 plants.
Across Uttarakhand our list holds 14 plants in 4 towns, commissioned between 2023 and 2026.
Polymer processing is power-hungry and often continuous, so much of what a plant generates is used on site.
Polymer works often occupy long sheds, which suit straight rows and simple cable routes.
Sector page: Plastics & polymers solar. Rules for Uttarakhand: solar policy.
Projects
More plants near Roorkee
Elsewhere in Uttarakhand
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other plants on RCC roofs
- FDC – Baddi332 kWp · RCC · Sep 2021
- Pearl Global – Bengaluru637 kWp · RCC · Mar 2026
- Mahyco – Jalna1,119 kWp · RCC · Jan 2026
- Legrand – Haridwar537 kWp · RCC · Jan 2024
Common questions
What people ask about this plant
How long has the plant been running?
Our list records Apr 2024. Module degradation and wear on inverters and cables now show in the record.
Who maintains this Roorkee plant?
The client owns it, because the plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
Can the Plastiblends – Roorkee design be repeated at my site?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 300 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Find out what your slab can carry
The free 7-day study gives a site in Roorkee an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.