Industrial rooftop solar in Punjab
One plant listed in Punjab: a 210 kWp ground-mount plant at Rajpura for an FMCG warehouse, commissioned in July 2026.
- projects listed here in Punjab
- 1
- plant built on CAPEX
- 1
- industry named
- 1
- most recent commissioning
- Jul 2026
Punjab
A ground-mount plant at a logistics hub
Rajpura sits where National Highway 1 from Delhi meets National Highway 64 from Chandigarh, about 38 km from Chandigarh, and its junction is the first railway junction in Punjab on the line from Delhi.
Its Wikipedia entry calls it an industrial town with steel and machine works, an emerging warehousing and logistics hub, and the site of a planned 1,099-acre integrated manufacturing cluster. The one plant listed here serves a warehouse in that setting.
The plant is on the ground. Our list does not say why, but a ground array is what a site uses when the roof is full, weak or already spoken for, or when it has idle land inside the boundary. It was commissioned on 16 July 2026. Among the plants we built here, 1 was CAPEX.
Summers are hot, with May and June daily maxima around 38 to 39°C, January nights fall to about 2°C on average, and annual rain is about 730 mm, with most of it in July and August. For a ground array the winter matters as much as the summer, because low sun in December and January sets how far apart the rows must stand. Ask how the layout stops one row shading the next at that time of year.
Where the plants are
Rajpura
1 project
Rajpura
A 210 kWp ground-mount plant for an FMCG warehouse in Patiala district, commissioned in July 2026.
FMCG
What the list shows
Sectors, roofs and finance models in Punjab
Counts for the projects listed here in Punjab.
Sectors
- FMCG1
Roof types
- Metal sheet roof1
Finance model
- CAPEX1
The only row is a CAPEX ground-mount plant. Roof counts are empty here, and with one plant the page makes no claim about warehouses in general.
Projects
Plants listed in Punjab
Newest first.
What to check first
Land, shade and warehouse checks for Punjab
- 01
Roof or ground
Ask for a design on the roof and a design on the ground, with the cost of each, before choosing.
Ground-mount solar - 02
Row spacing in winter
Ask the engineer to show the shadow between rows in December and January, when the sun is lowest.
Guide: performance ratio - 03
Land you may want back
Ask for the layout with future sheds and yard space marked, so the array is not on the next plot you need.
Industrial solar solutions - 04
Daylight load
A warehouse that works through the day fits solar well. Read your bill by time of day to see how much of it does.
Guide: reading your electricity bill
Guides and glossary
Guides and terms for Punjab factories
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Why is the Rajpura plant on the ground?
Our list records the installation type and not the reason. A ground array suits a site with a full or weak roof, or with spare land. The ground-mount page sets out what it needs, from soil checks to fencing.
Do you build for warehouses?
Yes. The Rajpura plant serves a warehouse, and the same engineering questions apply to a roof or a plot. Factories are most of our work; tell us the building type, your town and your average monthly bill.
Do you work near Chandigarh and Patiala?
Our Punjab plant is at Rajpura, in Patiala district. For a site elsewhere in the region, share the town and your bill, and the free 7-day feasibility study starts there.
Does a ground array cost more than a rooftop plant?
It can, because it needs foundations, fencing and cabling across the plot, while a roof plant uses the building. Whether it costs more per kWp for you depends on the site, so ask for the roof and the ground designs priced side by side.
What do the net-metering and open-access rules say in Punjab?
Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.
Free feasibility study
Land or roof at a Punjab site? Ask for both designs
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation