Project · Uttarakhand
HUL – Haridwar: 685 kWp ground-mount solar in Uttarakhand
HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 685 kWp
- Installation
- Ground mount
- Location
- Haridwar, Uttarakhand
- Finance model
- CAPEX
Size, roof and finance model
- Client
- HUL
- Industry
- FMCG
- Capacity
- 685 kWp
- Service
- EPC
- Status
- Operational. Built by Adhvanik Energy; maintained by the client.
685 kWp puts HUL – Haridwar in the larger group on the list, usually with several inverters sharing the load.
Our list does not yet record when the plant was commissioned. The month will be added once it is confirmed.
The plant closest to it in size on our list is Horiba – Nagpur (721 kWp, Maharashtra).
Solar in the area: Uttarakhand · Haridwar and Roorkee. Find this plant in the projects index.
Engineering
What a ground-mount plant involves
Ground mount uses land the factory is not otherwise using. The first design decisions on a ground plant are about layout: row spacing for winter sun, internal roads, fire access and the path of stormwater.
Vegetation is a ground-plant issue that roofs do not have. Grass that grows up to the module edge shades the lowest cells, so the O&M plan for a plant like HUL – Haridwar has to cover the ground under and between rows as well as the modules.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
Who owns the plant, and who runs it
The HUL plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.
Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.
Haridwar
Haridwar and the FMCG sector
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp685 kWp here. 38 plants on our list are in this range.
- Type of installation
- Ground mountSpare land inside the plant boundary.
- Finance option
- CAPEXThe factory owns the plant from day one.
Haridwar is a repeat location on the list, with 9 plants listed. The named sectors are FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
Uttarakhand has 14 projects on the list, across 4 towns. By roof, 5 on ground mount, 5 on metal sheet roofs, 2 on metal sheet + RCC and 2 on RCC.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar. Rules for Uttarakhand: solar policy.
Projects
Related plants
Also in Haridwar
- HUL – Haridwar, 800 kWpGround mount
- HUL – Haridwar, 436 kWpGround mount
- HUL – Haridwar, 64 kWpGround mount
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other ground-mount plants
- Syngenta – Aurangabad404 kWp · Ground mount · Jun 2022
- HUL – Orai1,131 kWp · Ground mount · Apr 2022
- HUL – Haridwar, 801 kWpGround mount
Common questions
The HUL – Haridwar plant: questions and answers
What does 685 kWp mean for this Haridwar plant?
The plant is recorded at 685 kWp of modules. Its inverter rating is not on the list, so we do not state an AC figure.
Who owns the HUL – Haridwar plant?
The client owns it, because the HUL plant was financed as CAPEX. Adhvanik Energy built the plant, and the client maintains it itself.
Can the HUL – Haridwar design be repeated at my site?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 685 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Uttarakhand site
The free 7-day study gives a site in Haridwar an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.