HUL – Haridwar: 436 kWp ground-mount solar in Uttarakhand

HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.

Capacity
436 kWp
Installation
Ground mount
Location
Haridwar, Uttarakhand
Finance model
CAPEX

This plant at a glance

Client
HUL
Industry
FMCG
Capacity
436 kWp
Service
EPC
Status
Operational. Built by Adhvanik Energy; maintained by the client.

At 436 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters.

Our list does not yet record when the HUL plant was commissioned. The month will be added once it is confirmed.

For scale, the nearest match in capacity is MYK Laticrete – Perundurai (427 kWp, Tamil Nadu).

Engineering

The engineering behind a plant like HUL – Haridwar

Ground mount uses land the factory is not otherwise using. The first design decisions on a ground plant are about layout: row spacing for winter sun, internal roads, fire access and the path of stormwater.

Vegetation is a ground-plant issue that roofs do not have. Grass that grows up to the module edge shades the lowest cells, so the O&M plan for a plant like HUL – Haridwar has to cover the ground under and between rows as well as the modules.

Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.

Finance model

How the plant is paid for

CAPEX is the model where the client buys the plant. For this Haridwar plant, that means the 436 kWp system is the client's property, with the savings and the upkeep decisions on the client's side.

An owner can hand day-to-day care of a CAPEX plant to our O&M team under contract, which can run up to 25 years. Without one, the owner runs the plant.

Haridwar

FMCG plants in Uttarakhand

Solar resource here
1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp436 kWp here. 36 plants on our list are in this range.
Type of installation
Ground mountSpare land inside the plant boundary.
Finance option
CAPEXThe factory owns the plant from day one.

We list 9 plants in Haridwar, and the plant is one of them. Sectors named there: FMCG; electrical and electronics; pharma.

Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.

Across Uttarakhand our list holds 14 plants in 4 towns, commissioned between 2023 and 2026.

FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.

Warehouses and packing halls give long runs of clear roof, which keeps the array simple.

Projects

Other plants on the list

Also in Haridwar

Elsewhere in Uttarakhand

Other ground-mount plants

Common questions

What people ask about this plant

How big is the HUL – Haridwar plant?

The HUL plant is recorded at 436 kWp of modules. Its inverter rating is not on the list, so we do not state an AC figure.

Who maintains this Haridwar plant?

Ownership sits with the client under CAPEX. We designed and built the plant, and the client's own team maintains it.

Could a plant like the plant fit my factory?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Want a 436 kWp plant on your own site?

The free 7-day study gives a site in Haridwar an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study