Project · Uttarakhand
HUL – Haridwar: 436 kWp ground-mount solar in Uttarakhand
HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 436 kWp
- Installation
- Ground mount
- Location
- Haridwar, Uttarakhand
- Finance model
- CAPEX
This plant at a glance
- Client
- HUL
- Industry
- FMCG
- Capacity
- 436 kWp
- Service
- EPC
- Status
- Operational. Built by Adhvanik Energy; maintained by the client.
At 436 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters.
Our list does not yet record when the HUL plant was commissioned. The month will be added once it is confirmed.
For scale, the nearest match in capacity is MYK Laticrete – Perundurai (427 kWp, Tamil Nadu).
On the location pages: Uttarakhand · Haridwar and Roorkee. It is also listed in the full project list.
Engineering
The engineering behind a plant like HUL – Haridwar
Ground mount uses land the factory is not otherwise using. The first design decisions on a ground plant are about layout: row spacing for winter sun, internal roads, fire access and the path of stormwater.
Vegetation is a ground-plant issue that roofs do not have. Grass that grows up to the module edge shades the lowest cells, so the O&M plan for a plant like HUL – Haridwar has to cover the ground under and between rows as well as the modules.
Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.
Finance model
How the plant is paid for
CAPEX is the model where the client buys the plant. For this Haridwar plant, that means the 436 kWp system is the client's property, with the savings and the upkeep decisions on the client's side.
An owner can hand day-to-day care of a CAPEX plant to our O&M team under contract, which can run up to 25 years. Without one, the owner runs the plant.
Haridwar
FMCG plants in Uttarakhand
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp436 kWp here. 36 plants on our list are in this range.
- Type of installation
- Ground mountSpare land inside the plant boundary.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 9 plants in Haridwar, and the plant is one of them. Sectors named there: FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
Across Uttarakhand our list holds 14 plants in 4 towns, commissioned between 2023 and 2026.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar. Rules for Uttarakhand: solar policy.
Projects
Other plants on the list
Also in Haridwar
- Akome Life Care – Haridwar600 kWp · Metal sheet roof · Apr 2025
- Legrand – Haridwar537 kWp · RCC · Jan 2024
- HUL – Haridwar, 1,126 kWpMetal sheet roof
- HUL – Haridwar, 801 kWpGround mount
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other ground-mount plants
- Syngenta – Aurangabad404 kWp · Ground mount · Jun 2022
- HUL – Orai1,131 kWp · Ground mount · Apr 2022
- HUL – Haridwar, 800 kWpGround mount
- HUL – Haridwar, 685 kWpGround mount
Common questions
What people ask about this plant
How big is the HUL – Haridwar plant?
The HUL plant is recorded at 436 kWp of modules. Its inverter rating is not on the list, so we do not state an AC figure.
Who maintains this Haridwar plant?
Ownership sits with the client under CAPEX. We designed and built the plant, and the client's own team maintains it.
Could a plant like the plant fit my factory?
Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.
Guides and glossary
Guides and terms behind a 436 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Want a 436 kWp plant on your own site?
The free 7-day study gives a site in Haridwar an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.