AMC pricing
AMC pricing typically ranges from ₹500 to ₹1,000 per kW a year, depending on the plant's capacity, its age and site conditions. We quote after reviewing the plant.
Solar AMC
Adhvanik Energy takes over operation and maintenance of plants built by other EPCs, puts them on Asset Connect and reports to you every month. Many clients have seen generation rise by 5 to 10% after moving their O&M to us; that is an average, not a guarantee.

What changes
Sliding generation, unwatched monitoring and faults that wait for someone to notice are signs a plant needs new O&M. The modules and inverters stay as they are. The AMC adds monitoring on Asset Connect, a team that answers for the plant and contract terms you can hold us to.
| Aspect | Without active O&M | Under an Adhvanik Energy AMC |
|---|---|---|
| Monitoring | Portal offline, or online and unwatched | Continuous monitoring on Asset Connect: generation, performance ratio, irradiance and alerts |
| Fault response | Whenever someone is free | Remote response within 1 working day; an engineer on site within 2 working days if it cannot be fixed remotely |
| Performance | Nobody accountable for output | One team accountable for output, with monitoring and a monthly report |
| Reporting | No regular report, or an export nobody reads | A monthly report on generation, performance and issues, signed by an engineer |
| Who does the work | Whoever is free on site | Our in-house O&M team, dedicated to client sites |
| Term | Year to year, if at all | Contracts of up to 25 years |
Pricing and audits
AMC pricing typically ranges from ₹500 to ₹1,000 per kW a year, depending on the plant's capacity, its age and site conditions. We quote after reviewing the plant.
Takeover
Five steps from your first message to the first monthly report.
Send the location, the capacity, who built the plant and whatever drawings, datasheets, warranty papers and generation history exist. Gaps are normal.
Our engineers review the plant and its records, so the AMC reflects the plant as it is today and not as the drawings say it should be.
One document sets out the scope, the response times, the guarantees, the price and the term.
The plant is connected to our monitoring platform. From then on, alerts reach our O&M team.
Every month you receive a report on the plant, signed by an engineer.

Monitoring
Once the AMC starts, your plant reports to Asset Connect, the same system that monitors the plants we built. Generation, performance ratio and irradiance sit side by side, so a dip caused by weather can be told apart from a dip caused by a fault.
On site
When an AMC starts, our own O&M engineers visit the plant, inspect the roof and the panel room, and work at height with the right safety gear.




Proof
Plants installed by other companies and now maintained by our team. They sit within the 170+ factories under our active maintenance.
Haryana
Commissioned Sep 2025

Haryana
Commissioned Oct 2024

Dadra and Nagar Haveli and Daman and Diu
Commissioned Apr 2024

Dadra and Nagar Haveli and Daman and Diu
Commissioned Apr 2024
Maharashtra
Commissioned Apr 2024
Karnataka
Commissioned Apr 2024
Common questions
What plant heads and finance teams ask when weighing a takeover.
Speak with an industrial solar engineerYes. We take over operation and maintenance of plants built by other EPCs under an AMC. We maintain 170+ factories today, including plants we did not build.
We do not write uptime or generation guarantees into an AMC for a plant we did not build. Many of our clients have seen generation rise by 5 to 10% after moving their O&M to us. That is an average, not a guarantee. Separately, average asset uptime across the plants we maintain is 99%. That is a result, not a promise.
We respond remotely within 1 working day. If the fault cannot be fixed remotely, an engineer attends site within 2 working days. It is the same response we work to on plants we built.
Up to 25 years. A longer term lets us plan the plant's care in advance instead of renewing it year by year.
AMC pricing typically ranges from ₹500 to ₹1,000 per kW a year, depending on the plant's capacity, its age and site conditions. We quote after reviewing the plant.
Yes. We also carry out standalone plant audits for plants we did not build.
Our standard O&M scope is the starting point: 24 to 26 module cleaning cycles a year, with additional cycles based on site conditions; 4 preventive maintenance cycles a year; up to 10 breakdown visits a year; daily remote monitoring; subscription to the Asset Connect software included; performance monitoring and enhancement. The final scope is written into the proposal after the plant review.
AMC means annual maintenance contract. It is the contract under which O&M, the operation and maintenance of the plant, is carried out.
Our team members are based in 19 cities, including Delhi, Haridwar, Hyderabad, Chennai, Bhopal, Indore and Aurangabad. Tell us where your plant is and we will confirm coverage.
Guides and glossary
Terms used on this page
Solar AMC
Send your location and contact details and an engineer gets back to you within 48 hours. Or email solar@adhvanik.com with the plant's capacity and who built it.
What the AMC includes