Open access
Open access means buying solar power made elsewhere and carried to your factory over the state grid. It is for factories whose demand is larger than their roofs and land can supply, and Adhvanik Energy helps you work out whether it pays.
Is it for you
Open access suits factories with a large, steady demand, such as furnaces, compressors and continuous process lines, where even a full roof plus spare land would cover only a slice of the units used. It also suits groups with several factories in one state that want to buy from one plant.
It makes sense after the roofs and the land are used. Where the charges are high, or the state limits banking, it may not.
Adhvanik Energy has solar parks coming up in Maharashtra and Gujarat. If your factories are in one of these states, ask us about them.
Rules change often. Your state’s current position is on our solar policy pages.
The route
Each of the four stops below adds a charge or a loss, and the total decides whether it beats your DISCOM tariff.
Built on land with good sunshine, often in another district, sometimes in another state.
Power enters the state transmission or distribution network at a substation.
The network carries it to the substation that serves your factory.
Units are set against your consumption, time slot by time slot, on your DISCOM bill.
Structures
| Item | Captive | Group captive | Third-party sale |
|---|---|---|---|
| Who owns the solar plant | You, as the consumer | A company or SPV in which you and other consumers hold equity | A developer, who sells you the power |
| Ownership and use test | At least 26% ownership, and at least 51% of the output consumed by the owner | The same 26% and 51% tests, met by the captive users together; since March 2026 each user’s captive consumption is capped at its proportionate entitlement | None |
| Cross-subsidy surcharge | Not levied on captive use | Not levied while the captive tests are met; failing them in a year makes surcharges payable for that year | Levied at the rate your state commission sets |
| Your capital | The full plant | Your equity share | None |
Landed cost
Each state sets its own rates and revises them.
| Charge | What it pays for | Who sets it |
|---|---|---|
| Transmission charges | Use of the transmission network between the solar plant and your area | State (and central, if the power crosses states) regulators |
| Wheeling charges | Use of the distribution network that delivers power to your plant | Your state electricity regulatory commission |
| Losses | Energy lost in the network on the way, deducted from the units you receive | Your state commission, as a percentage by voltage level |
| Cross-subsidy surcharge | Compensates the DISCOM for the subsidy built into industrial tariffs | Your state commission; captive use is exempt |
| Additional surcharge | Covers DISCOM power-purchase costs stranded when consumers move to open access | Your state commission |
| Banking | Lets surplus units be used in a later time slot, for a charge | Your state’s open access regulations |
| Scheduling and fees | Application, metering and scheduling by the state load despatch centre | Your state’s open access regulations |
Contract and operations
An open access supply is a long contract and a continuing piece of administration, and both belong in the calculation from the start.
Day to day, someone on your side deals with registration, scheduling with the state load despatch centre, metering at both ends and the monthly energy account reconciled against your DISCOM bill. Ask who does each of these before you sign.
Points to settle in the power contract

Where to start
Units from your own roofs and land are used behind the meter, so none of the charges above apply. Open access earns its place on the demand left over.
What we need
Have these ready when the engineer calls.
For every factory you want to supply: units, tariff category, demand charges and time-of-day slots.
Your sanctioned load and the voltage you take supply at decide eligibility and which charges apply.
Rules and charges differ by state, so the location of each factory matters.
Meter data shows when you use power, which decides how much solar you can absorb without banking.
Why Adhvanik
We do not have an open access project on our published list. What we bring is a calculation that treats your whole site.
We have solar parks coming up in Maharashtra and Gujarat. Ask the engineer about them when you call.
The engineer works out how much you can make on your roofs and land before looking at the grid.
Bills, contract demand, voltage and state are compared for each plant, so you see where open access helps.
Our rooftop and O&M work spans many states.
Guides: Behind-the-meter or net metering: which suits your site?, Reading your electricity bill: the numbers that matter for solar. Terms: Open access, Group captive, Cross-subsidy surcharge, Banking charges, or the full glossary.
Projects
Our published project list covers on-site plants. Capacities are DC unless marked AC.
Common questions
Landed cost, group captive rules, banking and what to ask before signing.
Speak with an industrial solar engineerIt can be, once every charge is added up: the generation tariff plus transmission, wheeling, surcharges, losses and banking. Where that total stays below the DISCOM energy charge it replaces for the contract term, open access saves money; demand charges usually continue. We model it for your state and tariff category.
Consumers at or above a minimum contract demand, which is set in each state’s regulations. The Green Energy Open Access Rules, 2022 lowered the threshold for green power to 100 kW, and the 100 kW can be met by aggregating connections with the same DISCOM. States are adopting it at different speeds, so check the current rules in your state.
Under the Electricity Rules, 2005, a captive plant must be at least 26% owned by its users, who must also consume at least 51% of its output. In a group captive, several consumers meet those tests together through a shared company. Since the Electricity (Amendment) Rules of March 2026, the tests are applied to the users in aggregate, and each user’s captive consumption is capped at its proportionate entitlement; anything above that attracts surcharges. Failing the tests in a year makes surcharges payable for that year. Third-party sale has no ownership test, but attracts cross-subsidy surcharge.
Rooftop first, in almost every case. Power from your own roof or land is used behind the meter, with no wheeling or transmission charges and no surcharges. Open access is for the demand left over once everything on site is used.
Depending on the state, surplus units can be banked with the DISCOM for use in a later slot, for a charge, or may lapse. Banking terms are one of the biggest differences between states.
Inter-state open access exists, but it can add central transmission charges (a waiver for solar is being phased out) and losses, and each state’s rules still apply at the receiving end. It needs a case-by-case calculation.
The term and tariff, the contracted capacity, shortfall and surplus units, payment security, and who carries the risk if a regulator revises a charge mid-term. These decide the saving as much as the headline tariff does.
Our solar policy pages summarise each state’s charges and banking terms. Our engineers can then check your own state and tariff category against your bills.
Free feasibility study
We model open access for your state and tariff category. An engineer replies within 48 hours.
What the study covers