Why there are two numbers
Modules are rated in the lab under standard test conditions: strong sunlight of 1,000 W/m², a cell temperature of 25 °C and a standard light spectrum. Add up the ratings of every module and you have the plant's kWp. The inverters turn that DC power into the AC power your factory uses, and their combined rating is the plant's AC capacity in kW.
Why a plant rarely delivers its kWp
On a real roof, cells run much hotter than 25 °C, the sun is rarely at full strength, and some energy is lost in cables and inverters. So a plant's actual output is usually below its kWp. Designers therefore often install more DC capacity than AC capacity, a DC/AC ratio above 1, so the inverters run closer to full load for more of the day. Push the ratio too far and the inverters clip the midday peak.
Comparing quotes
A price per kWp and a price per kW (AC) differ, and so do generation estimates per kWp and per kW. Before comparing two proposals, put them on the same basis, and check the DC/AC ratio each one assumes. State rules on how much rooftop capacity you may connect can be written in either unit, so check which your state uses.
Illustrative example
Worked example: one plant's ratings
A rooftop plant built with 550 Wp modules.
- Modules
- 1,100 × 550 Wp = 605 kWp (DC)
- Inverters
- 2 × 250 kW = 500 kW (AC)
- DC/AC ratio
- 605 ÷ 500 = 1.21
The plant can be described as 605 kWp or 500 kW (AC). A quote should say which.
Illustrative numbers.
What to check in a proposal
- Whether capacity and price are stated in kWp (DC) or kW (AC)
- The DC/AC ratio, and the clipping loss it assumes
- Module power tolerance: positive-only tolerance means no module is below its rating
- Whether the generation estimate is per kWp or per kW
How we state plant sizes
Our project list gives each plant's size in kWp (DC). Where only an AC figure is on record, it is labelled kW (AC), so the two are never mixed.