Project · Uttarakhand

Legrand – Haridwar: 537 kWp RCC rooftop solar in Uttarakhand

Adhvanik Energy owns and runs it, and Legrand pays for each unit the plant generates, under a PPA. The plant has supplied the site since Jan 2024. It is one of 4 Legrand plants on our project list.

537 kWp RCC rooftop plant at Legrand in Haridwar, Uttarakhand
Capacity
537 kWp
Installation
RCC
Location
Haridwar, Uttarakhand
Finance model
PPA / OPEX

Plant details

Client
Legrand
Industry
Electrical & Electronics
Capacity
537 kWp (DC), with 400 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jan 2024
Status
Operational. Owned and run by Adhvanik Energy.

At 537 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local. Its 537 kWp of modules feed 400 kW of inverters, a DC/AC ratio of 1.34.

Commissioned in Jan 2024, the plant has several seasons of data. The question now is whether performance ratio has held steady. Jan 2024 falls in the short-day season.

Closest in capacity on the list: Pidilite – Kala Amb (537 kWp, Himachal Pradesh). Of the Uttarakhand plants on our list, Dabur – Rudrapur, 400 kWp was commissioned just before it and Plastiblends – Roorkee just after.

On site

2 photos and a video clip from the plant. Select one to enlarge.

Engineering

How a 537 kWp plant is put together

Legrand – Haridwar is on an RCC roof, a flat concrete slab. A plant on a slab is held down by ballast, by anchors fixed into the concrete, or by a mix of both, and the choice follows how much extra weight the slab can carry and the condition of its waterproofing.

Parapets and tanks cast long shadows in December, when the sun is low. Rows on a slab like this are spaced for that month, so winter shading does not cut output below what the design assumed.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

How the plant is paid for

Under a PPA the client buys electricity from a plant we own. The tariff per unit is set in the contract, and the client pays only for the units the plant generates.

RESCO is the industry's name for this arrangement: a renewable energy service company that owns and operates the plant.

Haridwar

Where Legrand – Haridwar sits on our list

Solar resource here
1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp537 kWp here. 38 plants on our list are in this range.
Type of installation
RCCA flat concrete slab, ballasted or anchored.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

Besides the plant, our list has 8 other plants in Haridwar. Sectors named there: FMCG; electrical and electronics; pharma.

Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.

Uttarakhand has 14 projects on the list, across 4 towns. By roof, 5 on ground mount, 5 on metal sheet roofs, 2 on metal sheet + RCC and 2 on RCC.

Electronics assembly and testing keep a steady daytime load, with cooling adding to it in summer.

Electrical and electronics sites can combine RCC blocks with shed extensions, so the roof type can differ across the site.

Projects

More plants near Haridwar

Also in Haridwar

Elsewhere in Uttarakhand

Other plants on RCC roofs

Common questions

The Legrand – Haridwar plant: questions and answers

How long has the Legrand plant been running?

Our list records Jan 2024. Module degradation and wear on inverters and cables now show in the record.

Who owns the Legrand – Haridwar plant?

Adhvanik Energy owns and runs the plant. The client pays for each unit the plant generates, at the tariff in its contract, and our O&M team looks after the plant.

Could a plant like the Legrand plant fit my factory?

It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.

Free feasibility study

Find out what your slab can carry

The free 7-day study gives a site in Haridwar an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study