Project · Uttarakhand
Legrand – Haridwar: 537 kWp RCC rooftop solar in Uttarakhand
Adhvanik Energy owns and runs it, and Legrand pays for each unit the plant generates, under a PPA. The plant has supplied the site since Jan 2024. It is one of 4 Legrand plants on our project list.

- Capacity
- 537 kWp
- Installation
- RCC
- Location
- Haridwar, Uttarakhand
- Finance model
- PPA / OPEX
Plant details
- Client
- Legrand
- Industry
- Electrical & Electronics
- Capacity
- 537 kWp (DC), with 400 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jan 2024
- Status
- Operational. Owned and run by Adhvanik Energy.
At 537 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local. Its 537 kWp of modules feed 400 kW of inverters, a DC/AC ratio of 1.34.
Commissioned in Jan 2024, the plant has several seasons of data. The question now is whether performance ratio has held steady. Jan 2024 falls in the short-day season.
Closest in capacity on the list: Pidilite – Kala Amb (537 kWp, Himachal Pradesh). Of the Uttarakhand plants on our list, Dabur – Rudrapur, 400 kWp was commissioned just before it and Plastiblends – Roorkee just after.
More on the area: Uttarakhand · Haridwar and Roorkee. Find this plant in the projects index.
On site
2 photos and a video clip from the plant. Select one to enlarge.
Engineering
How a 537 kWp plant is put together
Legrand – Haridwar is on an RCC roof, a flat concrete slab. A plant on a slab is held down by ballast, by anchors fixed into the concrete, or by a mix of both, and the choice follows how much extra weight the slab can carry and the condition of its waterproofing.
Parapets and tanks cast long shadows in December, when the sun is low. Rows on a slab like this are spaced for that month, so winter shading does not cut output below what the design assumed.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
How the plant is paid for
Under a PPA the client buys electricity from a plant we own. The tariff per unit is set in the contract, and the client pays only for the units the plant generates.
RESCO is the industry's name for this arrangement: a renewable energy service company that owns and operates the plant.
Haridwar
Where Legrand – Haridwar sits on our list
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp537 kWp here. 38 plants on our list are in this range.
- Type of installation
- RCCA flat concrete slab, ballasted or anchored.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
Besides the plant, our list has 8 other plants in Haridwar. Sectors named there: FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
Uttarakhand has 14 projects on the list, across 4 towns. By roof, 5 on ground mount, 5 on metal sheet roofs, 2 on metal sheet + RCC and 2 on RCC.
Electronics assembly and testing keep a steady daytime load, with cooling adding to it in summer.
Electrical and electronics sites can combine RCC blocks with shed extensions, so the roof type can differ across the site.
Sector page: Electrical & electronics solar. Rules for Uttarakhand: solar policy.
Projects
More plants near Haridwar
Also in Haridwar
- HUL – Haridwar, 685 kWpGround mount
- HUL – Haridwar, 436 kWpGround mount
- HUL – Haridwar, 64 kWpGround mount
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other plants on RCC roofs
- HUL – Nalagarh46 kWp · RCC · Jul 2023
- FDC – Baddi332 kWp · RCC · Sep 2021
- Pearl Global – Bengaluru637 kWp · RCC · Mar 2026
- Mahyco – Jalna1,119 kWp · RCC · Jan 2026
Common questions
The Legrand – Haridwar plant: questions and answers
How long has the Legrand plant been running?
Our list records Jan 2024. Module degradation and wear on inverters and cables now show in the record.
Who owns the Legrand – Haridwar plant?
Adhvanik Energy owns and runs the plant. The client pays for each unit the plant generates, at the tariff in its contract, and our O&M team looks after the plant.
Could a plant like the Legrand plant fit my factory?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 537 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Find out what your slab can carry
The free 7-day study gives a site in Haridwar an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.


