Locations
Industrial rooftop solar in Haryana
Our Haryana plants sit in the NCR industrial belt, around Gurugram, Manesar and Bahadurgarh: 5 projects listed here, 3 of the 3 plants we built on a CAPEX basis.
- projects listed here in Haryana
- 5
- places with a plant
- 3
- industries named
- 3
- most recent commissioning
- Sep 2025
Haryana
Four Gurugram entries share a name
Haryana has 5 projects listed here: 3 plants in Gurugram, one in Manesar and one in Bahadurgarh. They were commissioned between 2024 and 2025.
Four Gurugram entries share a name in our list, and three of them were commissioned within ten days of one another in 2025. Where a company has several buildings, treating them as one project can mean one design review and one approval path.
By finance model, 3 were CAPEX. The financing pages explain how CAPEX and a PPA compare, and the study gives you an ROI sheet and a budgetary quote.
Where the plants are
Gurugram, Manesar and Bahadurgarh
4 projects
Gurugram and Manesar
Gurugram, Manesar
Four Gurugram entries that share a name, plus an automotive plant in Manesar.
Textile · Automotive
Gurugram and Manesar industrial solar page1 project
Bahadurgarh
A steel and metals plant on the Delhi border.
Steel & Metals
What the list shows
Sectors, roofs and finance models in Haryana
Counts for the projects listed here in Haryana.
Sectors
- Textile3
- Automotive1
- Steel & Metals1
Roof types
- Metal sheet roof5
Finance model
- CAPEX3
Service
- Built by Adhvanik3
- O&M only (built by others)2
By finance model, 3 were CAPEX. Sectors in the list: textile, automotive and steel and metals, plus general industrial. Roof type is recorded for half the rows, and where it is, it is metal sheet.
Projects
Plants listed in Haryana
Newest first.
- 201 kWp
Sansera Engineering – Manesar
Haryana
Commissioned Sep 2025
384 kWp
Pearl Global – Gurugram, 384 kWp
Haryana
Commissioned Jul 2025
186 kWp
Pearl Global – Gurugram, 186 kWp
Haryana
Commissioned Jul 2025
152 kWp
Pearl Global – Gurugram, 152 kWp
Haryana
Commissioned Jul 2025
600 kWp
ArcelorMittal Nippon Steel – Bahadurgarh
Haryana
Commissioned Oct 2024
What to check first
Checks for a Haryana site with several buildings
- 01
Every building you own
Group the roofs into one project and approval, design and upkeep happen once.
Industrial solar solutions - 02
Evening and night load
If most of your load is after dark, solar alone will not cover it. Ask about storage.
Battery energy storage - 03
Rules for your connection
Sizing depends on what happens to surplus power. Read the current rules for your connection first.
Haryana solar policy - 04
Shading from neighbours
Tall neighbouring buildings change yield in dense industrial estates. Ask for the shadow study.
Guide: performance ratio
Guides and glossary
Guides and terms for Haryana factories
- Behind-the-meter or net metering: which suits your site?Read the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
- How rooftop solar pays back for Indian industryRead the guide
Terms used on this page
Do you work across the NCR?
Our Haryana plants are in Gurugram, Bahadurgarh and Manesar. For a site elsewhere in the NCR, share your town and average monthly bill, and the free 7-day feasibility study begins there.
Can you solarise several buildings of one company?
Yes. Four Gurugram entries in our list share a name, and three were commissioned within ten days of each other. One design review and one approval path covers the group, and each roof still gets its own mounting design.
Are the Haryana plants CAPEX or PPA?
By finance model, 3 were CAPEX. The financing page explains the trade-off between owning the plant and paying for the power.
My Haryana plant runs through the night. Is solar worth it?
Solar covers the daytime share of the load and the grid covers the rest, so read your bill by time-of-day band to see how large that share is. Battery storage can shift some solar energy into the evening; ask what it would add and cost before assuming it pays.
Is there an Adhvanik engineer near my factory in Haryana?
Our team includes people based in Gurugram and Delhi. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.
What do the net-metering and open-access rules say in Haryana?
The regulator sets the terms, and the terms move. Our Haryana policy page sets out the current position with sources; read it before you size the plant, because the rules decide whether surplus power is exported, banked or avoided by design.
Free feasibility study
Several buildings in Haryana? Price them as one project
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation