Locations
Industrial rooftop solar in Daman and Silvassa
This union territory has 7 projects listed here, in Daman and Silvassa: polymer plants, general industrial plants and a consumer-goods plant, on CAPEX and PPA.

- projects listed here in this union territory
- 7
- places with a plant
- 2
- industries named
- 2
- most recent commissioning
- Jun 2026
This territory
A union territory since January 2020
Dadra and Nagar Haveli and Daman and Diu is a union territory, formed by merging two earlier territories in January 2020. Our 7 projects here are in two towns: 4 plants in Daman and 3 plants in Silvassa.
Polymers dominate Daman: all four plants there are polymer plants, two entries under each of two names. Silvassa is more varied, with two general industrial plants and a consumer-goods plant, all commissioned in 2026, and two of the three are on a PPA.
Because this is a union territory, confirm the rules that apply to your connection with the utility and its regulator, and do not assume the rules of a neighbouring state apply. That is why this page has no policy companion.
Where the plants are
Daman and Silvassa
4 projects
Daman
Four polymer plants, two entries under each of two names, commissioned in 2024.
Polymer
Daman industrial solar page3 projects
Silvassa
Two industrial plants and a consumer-goods plant, all commissioned in 2026.
FMCG
Silvassa industrial solar page
What the list shows
Sectors, roofs and finance models
Counts for the projects listed here in this union territory.
Sectors
- Polymer4
- FMCG1
- General industrial2
Roof types
- Metal sheet roof7
Finance model
- CAPEX2
- PPA / OPEX3
Service
- Built by Adhvanik5
- O&M only (built by others)2
Among the plants we built here, 2 were CAPEX and 3 were PPA / OPEX. Roof types: 7 on metal sheet roofs. Several rows have no roof type recorded.
Projects
Plants listed here
Newest first.
- 500 kWp
Sterlite – Silvassa, 500 kWp
Dadra and Nagar Haveli and Daman and Diu
Commissioned Jun 2026
- 249 kWp
Sterlite – Silvassa, 249 kWp
Dadra and Nagar Haveli and Daman and Diu
Commissioned May 2026
937 kWp
Dabur – Silvassa
Dadra and Nagar Haveli and Daman and Diu
Commissioned Apr 2026
- 478 kWp
Ronch Polymer – Daman, 478 kWp
Dadra and Nagar Haveli and Daman and Diu
Commissioned Dec 2024
173 kWp
Ronch Polymer – Daman, 173 kWp
Dadra and Nagar Haveli and Daman and Diu
Commissioned Dec 2024
200 kWp
Plastiblends – Daman, 200 kWp
Dadra and Nagar Haveli and Daman and Diu
Commissioned Apr 2024
67 kWp
Plastiblends – Daman, 67 kWp
Dadra and Nagar Haveli and Daman and Diu
Commissioned Apr 2024
What to check first
Checks for a Daman or Silvassa factory
- 01
The rules for a union territory
Ask your utility for the current metering and surplus terms in writing.
Industrial solar solutions - 02
Multi-unit sites
Daman entries come in pairs under the same name. If you run adjoining units, design them together.
Metal sheet roof solar - 03
Roof type per building
Sheds and RCC blocks need different mounting. Ask for a design per roof.
RCC roof solar - 04
Guides and glossary
Guides and terms for Daman and Silvassa factories
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Common questions
What Daman and Silvassa factories ask before they buy
Speak with an industrial solar engineerWhich towns in this territory have you built in?
Daman and Silvassa. The projects section lists each plant with its commissioning month.
Which industries are the plants in?
Polymer and FMCG, plus plants tagged as general industrial. All 7 are shown above.
Are the plants CAPEX or PPA?
Among the plants we built here, 2 were CAPEX and 3 were PPA / OPEX. Under a PPA, Adhvanik invests in and owns the plant and the factory pays for the power it generates.
Does a Daman or Silvassa factory follow the same solar rules as Gujarat?
Not necessarily. This is a union territory, so do not read rules across from a neighbouring state. Ask the utility that supplies your connection for the terms in writing; the free study includes that check.
Is there an Adhvanik engineer near my factory in Daman and Silvassa?
Our team includes people based in Daman. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.
What do the net-metering and open-access rules say in this territory?
Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.
Free feasibility study
Daman or Silvassa factory? Tell us your bill
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation