Locations

Industrial rooftop solar in Daman and Silvassa

This union territory has 7 projects listed here, in Daman and Silvassa: polymer plants, general industrial plants and a consumer-goods plant, on CAPEX and PPA.

Rooftop solar plant at a factory in Silvassa
projects listed here in this union territory
7
places with a plant
2
industries named
2
most recent commissioning
Jun 2026

This territory

A union territory since January 2020

Dadra and Nagar Haveli and Daman and Diu is a union territory, formed by merging two earlier territories in January 2020. Our 7 projects here are in two towns: 4 plants in Daman and 3 plants in Silvassa.

Polymers dominate Daman: all four plants there are polymer plants, two entries under each of two names. Silvassa is more varied, with two general industrial plants and a consumer-goods plant, all commissioned in 2026, and two of the three are on a PPA.

Because this is a union territory, confirm the rules that apply to your connection with the utility and its regulator, and do not assume the rules of a neighbouring state apply. That is why this page has no policy companion.

Where the plants are

Daman and Silvassa

What the list shows

Sectors, roofs and finance models

Counts for the projects listed here in this union territory.

Sectors

  • Polymer4
  • FMCG1
  • General industrial2

Roof types

  • Metal sheet roof7

Finance model

  • CAPEX2
  • PPA / OPEX3

Service

  • Built by Adhvanik5
  • O&M only (built by others)2

Among the plants we built here, 2 were CAPEX and 3 were PPA / OPEX. Roof types: 7 on metal sheet roofs. Several rows have no roof type recorded.

What to check first

Checks for a Daman or Silvassa factory

  1. 01

    The rules for a union territory

    Ask your utility for the current metering and surplus terms in writing.

    Industrial solar solutions
  2. 02

    Multi-unit sites

    Daman entries come in pairs under the same name. If you run adjoining units, design them together.

    Metal sheet roof solar
  3. 03

    Roof type per building

    Sheds and RCC blocks need different mounting. Ask for a design per roof.

    RCC roof solar
  4. 04

    CAPEX or PPA

    Ask for CAPEX and PPA prices for the same roof.

    Compare CAPEX and PPA

Common questions

What Daman and Silvassa factories ask before they buy

Speak with an industrial solar engineer
Which towns in this territory have you built in?

Daman and Silvassa. The projects section lists each plant with its commissioning month.

Explore industrial solar projects

Which industries are the plants in?

Polymer and FMCG, plus plants tagged as general industrial. All 7 are shown above.

Plastics and polymers solar

Are the plants CAPEX or PPA?

Among the plants we built here, 2 were CAPEX and 3 were PPA / OPEX. Under a PPA, Adhvanik invests in and owns the plant and the factory pays for the power it generates.

Compare CAPEX and PPA for your factory

Does a Daman or Silvassa factory follow the same solar rules as Gujarat?

Not necessarily. This is a union territory, so do not read rules across from a neighbouring state. Ask the utility that supplies your connection for the terms in writing; the free study includes that check.

Get a free feasibility study

Is there an Adhvanik engineer near my factory in Daman and Silvassa?

Our team includes people based in Daman. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.

Speak with an industrial solar engineer

What do the net-metering and open-access rules say in this territory?

Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.

Get a free feasibility study

Free feasibility study

Daman or Silvassa factory? Tell us your bill

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study