Project · Uttarakhand

HUL – Haridwar: 332 kWp metal sheet rooftop solar in Uttarakhand

HUL bought the plant under CAPEX and owns it. The plant has supplied the site since Jul 2026. It is one of 11 HUL plants on our project list.

Capacity
332 kWp
Installation
Metal sheet roof
Location
Haridwar, Uttarakhand
Finance model
CAPEX

Size, roof and finance model

Client
HUL
Industry
FMCG
Capacity
332 kWp (DC), with 250 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jul 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

332 kWp is mid-sized for the list, enough to span a production hall or two. Its 332 kWp of modules feed 250 kW of inverters, a DC/AC ratio of 1.33.

Commissioned in Jul 2026, the plant is recent. Its early months set the performance-ratio baseline. Its first weeks, in Jul 2026, were monsoon weeks.

The plant closest to it in size on our list is Blink Infra – Selaqui (332 kWp). Jul 2026 also saw FUSO Glass – Murbad (926 kWp, Maharashtra) and HUL – Rajpura (210 kWp, Punjab) commissioned. Its nearest neighbour in Uttarakhand, in order of commissioning, is Blink Infra – Selaqui.

On site

1 photo and a video clip from the plant. Select one to enlarge.

Engineering

What a metal sheet rooftop plant involves

The 332 kWp at HUL – Haridwar sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.

Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 332 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.

A plant in Haridwar is only as good as its upkeep: inspections of connectors and inverters, cleaning that follows the local dust, and Asset Connect alerts on a string that has gone quiet.

Finance model

Who owns the plant, and who runs it

Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at HUL – Haridwar since Jul 2026.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Haridwar

Haridwar and the FMCG sector

Solar resource here
1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp332 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Haridwar is a repeat location on the list, with 9 plants listed. The named sectors are FMCG; electrical and electronics; pharma.

Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.

Uttarakhand has 14 projects on the list, across 4 towns. By roof, 5 on ground mount, 5 on metal sheet roofs, 2 on metal sheet + RCC and 2 on RCC.

FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.

Warehouses and packing halls give long runs of clear roof, which keeps the array simple.

Projects

Related plants

Also in Haridwar

Elsewhere in Uttarakhand

Other plants on metal sheet roofs

Common questions

The HUL – Haridwar plant: questions and answers

When was the plant commissioned?

Our list records Jul 2026. The early question is whether output matches the design.

Who owns the HUL – Haridwar plant?

The client owns it, because this Haridwar plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.

Can the HUL – Haridwar design be repeated at my site?

Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.

Free feasibility study

Plan a plant for your own Uttarakhand site

The free 7-day study gives a site in Haridwar an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study