Project · Uttarakhand
HUL – Haridwar: 800 kWp ground-mount solar in Uttarakhand
HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 800 kWp
- Installation
- Ground mount
- Location
- Haridwar, Uttarakhand
- Finance model
- CAPEX
Plant details
- Client
- HUL
- Industry
- FMCG
- Capacity
- 800 kWp
- Service
- EPC
- Status
- Operational. Built by Adhvanik Energy; maintained by the client.
At 800 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local.
The commissioning month for the plant is still being confirmed, so no date appears in the plant record yet.
Closest in capacity on the list: ArcelorMittal Nippon Steel – Pune (800 kW (AC), Maharashtra).
More on the area: Uttarakhand · Haridwar and Roorkee. See it in the filterable project list.
Engineering
How an 800 kWp plant is put together
For 800 kWp on open land in Haridwar, soil conditions set the foundation type. The layout also has to leave space for the internal roads and fire access of an operating site.
Cable runs are longer than on a roof, so trench routes, cable sizing and the inverter location are fixed early to keep losses down. A ground plant is also easy to reach for cleaning and inspection, because nobody works at height.
Irradiance sensors give Asset Connect the sunshine an 800 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.
Finance model
What CAPEX means here
The HUL plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.
Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.
Haridwar
Where HUL – Haridwar sits on our list
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp800 kWp here. 38 plants on our list are in this range.
- Type of installation
- Ground mountSpare land inside the plant boundary.
- Finance option
- CAPEXThe factory owns the plant from day one.
Besides this Haridwar plant, our list has 8 other plants in Haridwar. Between them they cover FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
In Uttarakhand the list shows 14 projects in 4 towns. Named sectors include FMCG; electrical and electronics; pharma; polymer.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar. Rules for Uttarakhand: solar policy.
Projects
More plants near Haridwar
Also in Haridwar
- HUL – Haridwar, 801 kWpGround mount
- HUL – Haridwar, 685 kWpGround mount
- HUL – Haridwar, 436 kWpGround mount
- HUL – Haridwar, 64 kWpGround mount
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other ground-mount plants
- Syngenta – Aurangabad404 kWp · Ground mount · Jun 2022
- HUL – Orai1,131 kWp · Ground mount · Apr 2022
Common questions
Questions about HUL – Haridwar
Is 800 kWp the module or the inverter size at the plant?
The list gives 800 kWp for the HUL plant, the module capacity (DC). The inverter rating is not recorded, so no AC figure is shown.
How is the plant at Haridwar mounted?
No. The list records ground mount, with modules on steel structures standing on land inside the site boundary, so the checks are foundations, drainage and cable trenches.
Is Haridwar within your reach for a new plant?
Yes. 9 plants are listed for Haridwar, among 14 in Uttarakhand. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind an 800 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Find out what your land can carry
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.