Project · Uttarakhand

Dabur – Rudrapur: 400 kWp rooftop solar on two roof types in Uttarakhand

Adhvanik Energy owns and runs it, and Dabur pays for each unit the plant generates, under a PPA. The plant has supplied the site since Nov 2023. It is one of 5 Dabur plants on our project list.

Capacity
400 kWp
Installation
Metal sheet + RCC
Location
Rudrapur, Uttarakhand
Finance model
PPA / OPEX

This plant at a glance

Client
Dabur
Industry
FMCG
Capacity
400 kWp (DC), with 310 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Nov 2023
Status
Operational. Owned and run by Adhvanik Energy.

400 kWp is mid-sized for the list, enough to span a production hall or two. The array is 29% larger than the inverters, a DC/AC ratio of 1.29.

Since Nov 2023, the plant in Rudrapur has run through several monsoons. That history is the first thing an O&M review reads. Nov 2023 falls as the monsoon ends.

Closest in capacity on the list: Springtech Suspensions – Pithampur (400 kWp, Madhya Pradesh). Nov 2023 also saw HUL – Kandla (160 kWp, Gujarat) and Dabur – Rudrapur (1,000 kWp) commissioned. Of the Uttarakhand plants on our list, Dabur – Rudrapur, 1,000 kWp was commissioned just before it and Legrand – Haridwar just after.

Engineering

What a rooftop on two roof types plant involves

Dabur – Rudrapur spans metal sheet and RCC roofs, so the plant is two engineering jobs under one design. The sheet roofs get clamp or adhesive mounting and wind-load checks. The concrete roofs get ballast or anchors and a waterproofing check.

Roof age differs too, so a block that needs re-sheeting or fresh waterproofing is dealt with before its share of the plant goes on.

Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Rudrapur call for them, with AI-enabled checks on cleaning quality.

Finance model

What PPA / OPEX means here

Under a PPA the client buys electricity from a plant we own. The tariff per unit is set in the contract, and the client pays only for the units the plant generates.

Because we own the plant, we carry its performance: our O&M team runs it, and its output is what the contract is priced on. PPAs run 5 to 25 years.

Rudrapur

Rudrapur and the FMCG sector

Solar resource here
1,781 kWh/m² a yearAbout 1,533 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Rudrapur; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp400 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet + RCCMetal sheet and RCC roofs, each with its own mounting.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

We list 2 plants in Rudrapur, and Dabur – Rudrapur is one of them. The sector named there is FMCG.

In Uttarakhand the list shows 14 projects in 4 towns. Named sectors include FMCG; electrical and electronics; pharma; polymer.

FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.

Warehouses and packing halls give long runs of clear roof, which keeps the array simple.

Projects

More plants near Rudrapur

Also in Rudrapur

Elsewhere in Uttarakhand

Other FMCG plants

Common questions

The Dabur – Rudrapur plant: questions and answers

When was the plant commissioned?

Our list records Nov 2023. That history is the first thing an O&M review reads.

Who maintains the Dabur plant?

We do. This Rudrapur plant is a PPA / OPEX plant, so Adhvanik Energy owns it, operates it and maintains it, and the host site pays per unit generated.

Can the Dabur – Rudrapur design be repeated at my site?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Start with the numbers for your site

The free 7-day study gives a site in Rudrapur an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study