Locations

Industrial rooftop solar in Uttar Pradesh

Four plants in two groups: three small ones commissioned in May and June 2026, and a 1,131 kWp ground-mount plant at Orai running since 2022.

projects listed here in Uttar Pradesh
4
places with a plant
4
industries named
2
most recent commissioning
Jun 2026

Uttar Pradesh

Three small plants and a ground-mount at Orai

Uttar Pradesh has 4 projects listed here, and they fall into two groups. Sarai Sahjadi (300 kWp) and Bhokapur (125 kWp) were both commissioned on 21 June 2026. Gaddipur (250 kWp) followed on 28 May 2026. The fourth plant, at Orai, is a ground-mount plant of 1,131 kWp that has been generating since 2022.

Orai is the headquarters of Jalaun district, on the plains of Bundelkhand. Its May daily maximum averages about 40.7°C, and annual rain is about 514 mm, with August and July the wettest months. For a ground array that points to two questions: how far output falls on the hottest afternoons, and how often the modules are washed through the long dry months between rains.

The three newer plants have no roof type recorded in our list, so this page says nothing about their roofs. Among the plants we built here, 1 was CAPEX (the model is not recorded for 3).

A plant of 100 to 300 kWp has few inverters, and one fault takes a large share of it offline. Ask how many the design uses and who attends when one trips. That is the question an O&M contract should answer in writing.

Where the plants are

Sarai Sahjadi, Bhokapur, Gaddipur and Orai

  • 2 projects

    Sarai Sahjadi and Bhokapur

    Bhokapur, Sarai Sahjadi

    Two plants of 300 and 125 kWp, commissioned on the same day in June 2026.

    Warehousing

  • 1 project

    Gaddipur

    A 250 kWp plant commissioned in May 2026, 24 days before the other two.

    Warehousing

  • 1 project

    Orai

    A ground-mount FMCG plant of 1,131 kWp in Jalaun district, commissioned in 2022.

    FMCG

What the list shows

Sectors, roofs and finance models in Uttar Pradesh

Counts for the projects listed here in Uttar Pradesh.

Sectors

  • Warehousing3
  • FMCG1

Roof types

  • Metal sheet roof3
  • Ground mount1

Finance model

  • CAPEX1

Among the plants we built here, 1 was CAPEX (the model is not recorded for 3). Only one roof type is recorded, ground mount at Orai; the other three rows leave it blank, and the counts above leave them out.

What to check first

Ground, heat and dust: checks for Uttar Pradesh

  1. 01

    Ground or roof

    Orai shows what a ground array looks like in our list. If your boundary holds idle land, ask whether it could carry the plant instead of a roof.

    Ground-mount solar
  2. 02

    Output in May and June

    Ask the proposal to show the hot months on their own line, apart from the annual total.

    Guide: performance ratio
  3. 03

    Washing between rains

    Most of the rain at Orai falls in July and August. Ask what washing interval the yield estimate assumes.

    Solar O&M and AMC
  4. 04

    Inverter count and attendance

    On a small plant, ask who attends a tripped inverter and how soon.

    AMC for existing plants

Common questions

What Uttar Pradesh factories ask before they buy

Speak with an industrial solar engineer
What does a ground-mount plant need that a rooftop plant does not?

Land free of shade and of later building plans, a soil check to choose the foundations, a fence and drainage. Our Uttar Pradesh list includes one ground-mount plant, at Orai. The ground-mount page sets out the site questions.

Ground-mount solar

Are the Uttar Pradesh plants in industrial estates?

Our list names the town or village and leaves out the estate, so we make no claim about which estate a plant belongs to. Tell us your factory's town and average monthly bill; the free 7-day feasibility study starts from those.

Were the Uttar Pradesh plants bought or paid for through a PPA?

Among the plants we built here, 1 was CAPEX (the model is not recorded for 3). A PPA is available where a factory would rather not spend capital: Adhvanik invests in and owns the plant, and the factory pays for the electricity it generates.

Compare CAPEX and PPA for your factory

How does heat affect a plant in Bundelkhand?

Modules lose some output as they warm up, and Orai's May afternoons average about 40.7°C at the daily maximum. A good proposal gives monthly yield, so the hot months are visible before you sign.

Is there an Adhvanik engineer near my factory in Uttar Pradesh?

Our team includes people based in Noida. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.

Speak with an industrial solar engineer

What do the net-metering and open-access rules say in Uttar Pradesh?

Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.

Get a free feasibility study

Free feasibility study

Ground or roof in Uttar Pradesh? Start with the study

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study