Solar policy

Solar rules for factories, state by state

The same roof earns a different return depending on the state that regulates it. We read the regulations and orders for eight states where we have built factory plants, and set out what they mean for a factory, with sources and dates.

What state rules decide

Six things your state decides

The central government sets a framework and each state regulator decides how it applies to your connection. These six points shape a factory plan.

Which metering route you get

Net metering, net billing, gross metering or behind the meter. It decides whether a unit you generate offsets your retail tariff or earns a regulator’s rate.

How big the plant can be

A ceiling in kW or MW, and a link to your contract demand or sanctioned load. The smaller of the two usually decides.

Whether open access is open to you

The minimum load, whether connections can be added together, and whether captive users face any limit.

What you pay on top

Wheeling, cross-subsidy surcharge, additional surcharge, standby and network charges. Each is set by order, and each state sets them differently.

How banking and surplus work

The period in which a surplus can be set off, and what the distribution company pays for what remains.

How long approval takes

Technical feasibility, agreements and metering are state procedures, and some states have recently removed steps.

The central rules

What every state starts from

Four national rules set the floor, and states adopt, tighten or add to them through their own regulations.

  • Net metering. The 2021 amendment to the Electricity (Rights of Consumers) Rules allows net metering for systems up to 500 kW or the sanctioned load, whichever is lower.1
  • Green energy open access. Under the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, as amended in 2023, consumers with a contract demand or sanctioned load of 100 kW or more, alone or through connections added together in an electricity division, can take it.2 Captive users face no load limit.3
  • Captive status. The Electricity (Amendment) Rules of 13 March 2026 keep the 26% ownership and 51% consumption tests but apply them to group captive users collectively, with a cap on each user’s consumption.4
  • Time-of-day tariffs. The Electricity (Rights of Consumers) Amendment Rules, 2023 bring time-of-day tariffs to commercial and industrial consumers, which changes what a unit of daytime solar is worth.5

A state regulator can set a different ceiling for a given route, charge for network use, or take its own view of open access alongside rooftop. States also draw the aggregation line differently: the central rules and Haryana speak of an electricity division, Maharashtra of an electricity circle. The state pages below pick up where this list stops.

Comparison

Eight states, side by side

Only cells we could source appear. Where a rule is unsettled or we could not confirm it, the cell says so.

Rooftop and open access rules as of Nov 2026. Sources, dates and caveats are on each state page. Where a cell says to confirm, the rule was unsettled or we could not source it.
StateRegulatorRooftop net meteringGreen open accessThe rule that matters most
MaharashtraMERCLower of 5 MW or contract demand; storage needed for new plants above 100 kW; Grid Support Charge on net metering100 kW or more, aggregated within an electricity circle; no limit for captive usersStorage rule for new plants above 100 kW, and a Grid Support Charge on net metering
GujaratGERCNo sanctioned-load limit for captive and third-party-sale projects, within the permissible limit (2022 text); check the current textSixth Amendment of August 2026 revised the interim banking charge; annual determination reported from April 2027Size, set-off and export payment depend on consumer class
Tamil NaduTNERCCheck with your distribution company: network charges on rooftop generation are contested in courtHT and EHT consumers with contracted demand of 63 kVA or more; captive plants have an automatic rightNetwork charges on rooftop solar are under court challenge
Madhya PradeshMPERCLimits of 500 kW to 1 MW depending on the arrangement, as reported; confirm in the regulation textMPERC 2023 regulations on open access and banking charges for green energy, as amended in 2024; additional surcharge not levied up to contract demand if fixed charges are paidNet or gross metering and open access are not combined
UttarakhandUERC1 MW ceiling under net metering; UERC refused to relax it in 2025100 kW or more; no limit for captive users and generatorsThe 1 MW ceiling held in 2025, even when the state solar policy was cited
HaryanaHERC500 kW net-metering ceiling; above it, gross meteringSingle or aggregated connections of 100 kW or more within one electricity division, after the Feb 2025 amendmentAbove 500 kW the route is gross metering
Andhra PradeshAPERC500 kWp for net metering under Regulation 4 of 2023; behind-the-meter captive plants outside itGreen Energy Open Access, Charges and Banking Regulation, 2024; check the threshold in the textBehind-the-meter plants carry no open-access surcharges
Himachal PradeshHPERC80% of sanctioned contract demand for two-part-tariff consumers (2018 text); confirm with HPSEBLContracted demand of 100 kW or more; 15-day approval clock, deemed approval if technical conditions are metA 15-day approval clock for green open access applications

How we source this

How these pages are dated and sourced

Policy pages go stale quickly, so each one is dated Nov 2026, was last checked on 4 Nov 2026, and numbers its sources so you can trace any statement to a regulation, an order or a trade-press report.

We do not quote tariffs, cross-subsidy or additional surcharge rates, banking charges or network charges. Regulators set them by order and revise them regularly, so a figure copied into a web page is wrong by the next order. Ask your distribution company for the current schedule for your connection.

Where we could not confirm a rule against the regulation text, the page says so and turns it into a question for your distribution company. If you spot a rule that has changed, tell us and we will update the page.

Free feasibility study

Get the rules of your state applied to your site

Send your bill and sanctioned load. An engineer replies within 48 hours, and the free study includes the metering route that fits your connection.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study