Locations
Industrial rooftop solar in Madhya Pradesh
Every Madhya Pradesh plant in our list is in the Indore and Pithampur belt: 9 projects listed here, from auto components and packaging to personal care and building materials.
- projects listed here in Madhya Pradesh
- 9
- places with a plant
- 2
- industries named
- 4
- most recent commissioning
- Jun 2026
Madhya Pradesh
What factories nearby chose
Our Madhya Pradesh list is a single belt: 5 plants in Indore and 4 plants in Pithampur, 9 in all, commissioned between 2024 and 2026.
That concentration is useful if you are in the same belt: the list shows what factories nearby chose, and when. Automotive plants lead in Pithampur, and packaging and consumer products lead in Indore.
Of the plants we built, 7 were CAPEX and 1 was PPA / OPEX (the model is not recorded for 1). If you want solar power without the capital outlay, a PPA is the route to price next to CAPEX.
Where the plants are
Indore and Pithampur
9 projects
Pithampur and Indore
Indore, Pithampur
Auto-component, packaging, personal care and building-materials plants.
Automotive · Packaging & Printing · FMCG · Personal Care
Pithampur and Indore industrial solar page
What the list shows
Sectors, roofs and finance models in Madhya Pradesh
Counts for the projects listed here in Madhya Pradesh.
Sectors
- Automotive3
- Packaging & Printing2
- FMCG1
- Personal Care1
- General industrial2
Roof types
- Metal sheet roof9
Finance model
- CAPEX7
- PPA / OPEX1
Automotive is the largest named sector (3 of 9 projects), followed by packaging and printing. Of the plants we built, 7 were CAPEX and 1 was PPA / OPEX (the model is not recorded for 1). Every roof type recorded is metal sheet.
Projects
Plants listed in Madhya Pradesh
Newest first.
- 515 kWp
Siddhi Vinayak Flexipack – Indore
Madhya Pradesh
Commissioned Jun 2026
- 500 kWp
Natural Living – Pithampur
Madhya Pradesh
Commissioned Jun 2026
- 400 kWp
Springtech Suspensions – Pithampur
Madhya Pradesh
Commissioned Feb 2026
405 kWp
MYK Laticrete – Indore
Madhya Pradesh
Commissioned Jun 2025
266 kWp
Mysore Deep Perfumery – Indore
Madhya Pradesh
Commissioned May 2025
- 500 kWp
Simplex Metal Processors – Pithampur, 500 kWp
Madhya Pradesh
Commissioned Apr 2025
565 kWp
Apple Flexipack – Indore
Madhya Pradesh
Commissioned Apr 2025
- 500 kWp
Dabur – Indore
Madhya Pradesh
Commissioned Feb 2025
- 350 kWp
Simplex Metal Processors – Pithampur, 350 kWp
Madhya Pradesh
Commissioned Dec 2024
What to check first
Checks for an Indore or Pithampur factory
- 01
Your shift pattern
Two-shift and three-shift plants use grid power at different hours. Solar helps most when you run through the day.
Guide: reading your electricity bill - 02
Roof sheet and purlin condition
Older sheds may need a structural check before any array goes up.
Metal sheet roof solar - 03
Rules for your connection
Metering and open-access terms are set per state. Read the current position before you size.
Madhya Pradesh solar policy - 04
Landlord or lease
If the factory is leased, a PPA may suit you better than CAPEX, with the landlord's consent.
Solar PPA for factories
Guides and glossary
Guides and terms for Madhya Pradesh factories
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- CAPEX or PPA: which solar model fits your factory?Read the guide
- How rooftop solar pays back for Indian industryRead the guide
Terms used on this page
Common questions
What Madhya Pradesh factories ask before they buy
Speak with an industrial solar engineerDo you build only in Indore and Pithampur?
Those are the two towns in our Madhya Pradesh list. If your factory is elsewhere in the state, tell us your town and average monthly bill; the free 7-day feasibility study starts from those.
Which industries are the Madhya Pradesh plants in?
Automotive, packaging and printing, FMCG and personal care, plus plants tagged as general industrial. All 9 are shown with their town and commissioning month in the projects section.
Are the plants CAPEX or PPA?
Of the plants we built, 7 were CAPEX and 1 was PPA / OPEX (the model is not recorded for 1). Under a PPA, Adhvanik invests in and owns the plant and the factory pays for the electricity it generates. The free study gives you an ROI sheet and a budgetary quote for your roof.
My Indore factory is on a leased site. Can I still go solar?
Yes, with the landlord's written consent. A PPA suits a leased site because the plant belongs to Adhvanik and you pay only for the power it generates, but the lease term and the roof owner's consent need to be settled first.
Who covers Madhya Pradesh for site visits and enquiries?
Our team includes people based in Indore and Bhopal. Whatever your town, the first step is the same: your location and a recent electricity bill. An engineer replies within 48 hours.
What do the net-metering and open-access rules say in Madhya Pradesh?
They differ from one state to the next and are reviewed regularly. Our Madhya Pradesh policy page sets out the current position with sources; read it before you size the plant, because the rules decide whether surplus power is exported, banked or avoided by design.
Free feasibility study
Compare CAPEX and PPA for an Indore or Pithampur roof
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation