Project · Uttarakhand
HUL – Haridwar: 801 kWp ground-mount solar in Uttarakhand
HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 801 kWp
- Installation
- Ground mount
- Location
- Haridwar, Uttarakhand
- Finance model
- CAPEX
Size, roof and finance model
- Client
- HUL
- Industry
- FMCG
- Capacity
- 801 kWp
- Service
- EPC
- Status
- Operational. Built by Adhvanik Energy; maintained by the client.
801 kWp puts HUL – Haridwar in the larger group on the list, usually with several inverters sharing the load.
The commissioning month for HUL – Haridwar is still being confirmed, so no date appears in the plant record yet.
The plant closest to it in size on our list is ArcelorMittal Nippon Steel – Pune (800 kW (AC), Maharashtra).
Solar in the area: Uttarakhand · Haridwar and Roorkee. Find this plant in the projects index.
Engineering
What a ground-mount plant involves
Putting 801 kWp on the ground changes the checklist. There is no sheet or slab to protect. There are soil and foundations, drainage, fencing, and the route of the cable trenches back to the panel.
An array on an operating campus has to respect internal roads, drainage and fire access. Rows are spaced so they do not shade each other in winter, and the fence line and any cameras are placed as part of the layout.
Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Haridwar call for them, with AI-enabled checks on cleaning quality.
Finance model
Who owns the plant, and who runs it
At the plant the client carried the capital cost of the 801 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Haridwar
Haridwar and the FMCG sector
- Solar resource here
- 1,754 kWh/m² a yearAbout 1,530 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Haridwar; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp801 kWp here. 38 plants on our list are in this range.
- Type of installation
- Ground mountSpare land inside the plant boundary.
- Finance option
- CAPEXThe factory owns the plant from day one.
Haridwar is a repeat location on the list, with 9 plants listed. The named sectors are FMCG; electrical and electronics; pharma.
Haridwar is covered on the page for Haridwar and Roorkee, which lists 10 plants.
Uttarakhand has 14 projects on the list, across 4 towns. By roof, 5 on ground mount, 5 on metal sheet roofs, 2 on metal sheet + RCC and 2 on RCC.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar. Rules for Uttarakhand: solar policy.
Projects
Related plants
Also in Haridwar
- HUL – Haridwar, 436 kWpGround mount
- HUL – Haridwar, 64 kWpGround mount
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
- Akome Life Care – Haridwar600 kWp · Metal sheet roof · Apr 2025
Elsewhere in Uttarakhand
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Dabur – Rudrapur, 1,000 kWpMetal sheet + RCC · Nov 2023
Other ground-mount plants
- Syngenta – Aurangabad404 kWp · Ground mount · Jun 2022
- HUL – Orai1,131 kWp · Ground mount · Apr 2022
- HUL – Haridwar, 800 kWpGround mount
- HUL – Haridwar, 685 kWpGround mount
Common questions
The HUL – Haridwar plant: questions and answers
What does 801 kWp mean for the HUL plant?
The list gives 801 kWp for this Haridwar plant, the module capacity (DC). The inverter rating is not recorded, so no AC figure is shown.
Is the plant a rooftop plant?
It stands on the ground, inside the plant boundary. Soil, foundations, drainage and vegetation control take the place of roof checks.
Does Adhvanik Energy work near Haridwar?
Yes. 9 plants are listed for Haridwar, among 14 in Uttarakhand. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind an 801 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Uttarakhand site
Send your Uttarakhand town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.