Industrial rooftop solar in Assam
One plant listed in Assam: a 1,700 kWp FMCG plant on a metal sheet roof in Kamrup, commissioned in 2026.
- projects listed here in Assam
- 1
- plant built on CAPEX
- 1
- industry named
- 1
- most recent commissioning
- Jan 2026
Assam
Where June brings 314 mm of rain
June in Guwahati averages about 314 mm of rain, July and August add about 547 mm between them, and relative humidity sits between 78 and 82 percent from June to September. Those are 1991 to 2020 normals from the airport. Any solar estimate for Assam has to be read month by month.
Our one Assam plant is listed under Kamrup. The district headquarters are at Amingaon in North Guwahati, the Brahmaputra splits the district into two nearly equal parts, and Kamrup Metropolitan, which covers Guwahati, is surrounded by Kamrup Rural. The Guwahati Refinery at Noonmati is the city's most important manufacturing industry.
The plant is 1,700 kWp on a metal sheet roof, built on CAPEX for an FMCG factory. On a roof that size, the fasteners and the drainage detail decide whether the array leaks into the building. In humid air the connectors and the inverter room need attention as well: ask where the inverters sit and how that room is ventilated.
The district's own Wikipedia page gives about 1,400 mm of rain a year, against about 1,695 mm at Guwahati airport in the 1991 to 2020 normals. Sources differ, so ask a proposal which rainfall data it uses.
Where the plants are
Kamrup, around Guwahati
1 project
Kamrup
A 1,700 kWp FMCG plant on a metal sheet roof, commissioned in 2026.
FMCG
What the list shows
Sectors, roofs and finance models in Assam
Counts for the projects listed here in Assam.
Sectors
- FMCG1
Roof types
- Metal sheet roof1
Finance model
- CAPEX1
The only row is a CAPEX plant on a metal sheet roof. One plant is an example, and the counts above cannot show a pattern for Assam.
Projects
Plants listed in Assam
Newest first.
What to check first
Wet-roof and humidity checks for Assam
- 01
Fasteners and drainage on a wet roof
Ask how every roof penetration is sealed, and where the water goes at the sheet laps.
Metal sheet roof solar - 02
Inverter room ventilation
Ask where the inverters are housed and how heat and humidity are handled there.
Solar O&M and AMC - 03
Yield for June to September
Ask for monthly generation, so the wettest months are visible and not averaged away.
Guide: performance ratio - 04
Payback built on a yearly figure
A payback that ignores the wet months overstates the first years. Ask what yield the figure assumes.
Guide: solar payback for industry
Guides and glossary
Guides and terms for Assam factories
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
- How rooftop solar pays back for Indian industryRead the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Is the Assam plant in Guwahati?
Our list files it under Kamrup. The Kamrup Metropolitan district covers Guwahati and is surrounded by Kamrup Rural, so the place name in the list does not settle which side of that line the factory is on. The free 7-day feasibility study starts from your town and average monthly bill.
What roof and finance model does it use?
1,700 kWp on a metal sheet roof. Among the plants we built here, 1 was CAPEX. The financing pages compare CAPEX with a PPA.
How much does the monsoon cut a solar plant's output?
It depends on the site, so ask for a monthly generation estimate and compare the June to September months with the rest. A plant is sized on the year, but the bill is paid every month.
Is there an Adhvanik engineer near my factory in Assam?
Our team includes people based in Guwahati. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.
What do the net-metering and open-access rules say in Assam?
Electricity rules differ between states and territories and are revised often. Ask the distribution company and the regulator for the current terms that apply to your connection before sizing the plant; the free 7-day feasibility study includes a policy check for your state and connection.
Free feasibility study
Planning solar in Assam? Ask for the monsoon months first
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation