How a group captive plant is set up
A developer forms a special purpose company (SPV) to own a solar plant, usually away from the factories on cheaper land. The factories buy equity in the SPV, at least 26% between them, and sign agreements to buy its power. The power travels over the state grid under open access. The users still pay network charges such as transmission, wheeling and banking, but a plant that meets the captive tests is exempt from the cross-subsidy surcharge and, following a December 2021 Supreme Court ruling, from additional surcharge too.
Why the surcharges matter
For a third-party open-access buyer, the cross-subsidy and additional surcharges can make up a large share of the landed cost of power. Removing them is what makes group captive solar attractive for factories whose load is far larger than their roofs can serve.
What changed in 2026
The Electricity (Amendment) Rules, 2026, notified on 13 March 2026, kept the 26% and 51% thresholds but changed how they are applied:
- The tests are met by the captive users in aggregate, rather than member by member within a set band.
- Each user's consumption is capped at 100% of its proportionate entitlement. Power taken beyond that is treated as ordinary supply and attracts both surcharges. The cap does not apply to a single user holding 26% or more.
- A holding company, its subsidiaries and fellow subsidiaries count as one captive user.
- Verification moves to the state's designated nodal agency for intra-state plants and to the National Load Despatch Centre for inter-state plants.
- No surcharge is charged while verification is pending if a declaration is filed, but if the plant fails, both surcharges become payable with carrying cost.
Rules as of Nov 2026. States apply them through their own regulations, so confirm the position in your state.
Illustrative example
Worked example: does the plant qualify this year?
A group captive plant generates 1 crore kWh in a financial year. Its captive users hold 26% of the SPV's voting equity.
- Ownership test
- 26% held by captive users: passes
- Minimum captive consumption
- 51% of 1 crore kWh = 51 lakh kWh
- Captive users consumed
- 55 lakh kWh (55%): passes
The plant keeps captive status for the year. Had the users taken only 48 lakh kWh (48%), it would have failed, and the surcharges would apply.
Illustrative numbers. The consumption forecast is the weak point: a plant that misses 51% in a weak year loses the exemption for that year.
What to settle before you invest
- Your share of equity, what it costs, and how you exit when the contract ends
- A consumption forecast that clears 51% across the group, even in a slow production year
- Who files the captive declaration and manages verification each year
- The wheeling, transmission and banking charges in your state, and how they may change
- Lock-in period and what happens if a member leaves the group
Group captive in our open access work
We build offsite solar wheeled to your plant, for loads larger than your roof can serve. Group captive structures are part of our open access work.
Sources
- Power Line: Electricity (Amendment) Rules, 2026 and captive users (opens in a new tab)
- Power Line: Supreme Court deems captive consumers not liable to pay additional surcharge (Dec 2021) (opens in a new tab)
- Mercom: no load limit for green energy open access for captive consumers (June 2022) (opens in a new tab)