Group captive solar

Group captive is an open-access arrangement in which electricity users jointly own at least 26% of a generating plant and together consume at least 51% of its output, which exempts that power from cross-subsidy and additional surcharges.

How a group captive plant is set up

A developer forms a special purpose company (SPV) to own a solar plant, usually away from the factories on cheaper land. The factories buy equity in the SPV, at least 26% between them, and sign agreements to buy its power. The power travels over the state grid under open access. The users still pay network charges such as transmission, wheeling and banking, but a plant that meets the captive tests is exempt from the cross-subsidy surcharge and, following a December 2021 Supreme Court ruling, from additional surcharge too.

Why the surcharges matter

For a third-party open-access buyer, the cross-subsidy and additional surcharges can make up a large share of the landed cost of power. Removing them is what makes group captive solar attractive for factories whose load is far larger than their roofs can serve.

What changed in 2026

The Electricity (Amendment) Rules, 2026, notified on 13 March 2026, kept the 26% and 51% thresholds but changed how they are applied:

  • The tests are met by the captive users in aggregate, rather than member by member within a set band.
  • Each user's consumption is capped at 100% of its proportionate entitlement. Power taken beyond that is treated as ordinary supply and attracts both surcharges. The cap does not apply to a single user holding 26% or more.
  • A holding company, its subsidiaries and fellow subsidiaries count as one captive user.
  • Verification moves to the state's designated nodal agency for intra-state plants and to the National Load Despatch Centre for inter-state plants.
  • No surcharge is charged while verification is pending if a declaration is filed, but if the plant fails, both surcharges become payable with carrying cost.

Rules as of Nov 2026. States apply them through their own regulations, so confirm the position in your state.

Illustrative example

Worked example: does the plant qualify this year?

A group captive plant generates 1 crore kWh in a financial year. Its captive users hold 26% of the SPV's voting equity.

Ownership test
26% held by captive users: passes
Minimum captive consumption
51% of 1 crore kWh = 51 lakh kWh
Captive users consumed
55 lakh kWh (55%): passes

The plant keeps captive status for the year. Had the users taken only 48 lakh kWh (48%), it would have failed, and the surcharges would apply.

Illustrative numbers. The consumption forecast is the weak point: a plant that misses 51% in a weak year loses the exemption for that year.

What to settle before you invest

  • Your share of equity, what it costs, and how you exit when the contract ends
  • A consumption forecast that clears 51% across the group, even in a slow production year
  • Who files the captive declaration and manages verification each year
  • The wheeling, transmission and banking charges in your state, and how they may change
  • Lock-in period and what happens if a member leaves the group

Group captive in our open access work

We build offsite solar wheeled to your plant, for loads larger than your roof can serve. Group captive structures are part of our open access work.

Open access and group captive solar

Sources

  1. Power Line: Electricity (Amendment) Rules, 2026 and captive users (opens in a new tab)
  2. Power Line: Supreme Court deems captive consumers not liable to pay additional surcharge (Dec 2021) (opens in a new tab)
  3. Mercom: no load limit for green energy open access for captive consumers (June 2022) (opens in a new tab)

Related terms

  • Grid & policy

    Open access

    The right to buy electricity from a generator other than your DISCOM, such as an offsite solar farm, and have it delivered over the grid for a set of network charges and surcharges.

  • Grid & policy

    Cross-subsidy surcharge

    A per-unit charge open-access consumers pay their DISCOM to make up for the cross-subsidy their regular tariff would have carried. Captive users are exempt.

  • Grid & policy

    Additional surcharge

    A per-unit charge under Section 42(4) of the Electricity Act that lets a DISCOM recover the fixed costs of power it contracted for an open-access consumer. Captive users do not pay it.

  • Grid & policy

    Wheeling charges

    What you pay the distribution company for carrying open-access power over its network from the generator to your factory, usually per unit, plus a share of energy lost on the way.

Keep reading

Free feasibility study

Ask whether your group could meet 26/51

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study