Glossary

Industrial solar glossary for factory finance and plant teams

33 terms you will meet in a solar proposal, a PPA or a factory power bill, explained by engineers for the finance and plant teams who have to sign off.

Start here

The six terms finance and plant teams ask about first

Who pays, how the power reaches you, and how the plant is judged once it runs. Each has a full entry with a worked example.

  • Contracts & finance

    CAPEX vs OPEX

    The two main ways to pay for factory solar: buy and own the plant (CAPEX), or let a developer own it and pay a per-unit tariff for its power (OPEX, through a PPA).

  • Contracts & finance

    PPA

    Power purchase agreement: a developer builds, owns and runs a solar plant at your site, and you pay a per-unit tariff for the units it generates (plus any deemed-generation units the contract specifies).

  • Grid & policy

    Open access

    The right to buy electricity from a generator other than your DISCOM, such as an offsite solar farm, and have it delivered over the grid for a set of network charges and surcharges.

  • Plant performance

    Performance ratio (PR)

    Of the energy a plant could have produced from the sunlight that reached it, the share it delivered. The standard measure of how well a plant is run.

  • Your power bill

    Contract demand

    The maximum power, usually in kVA, that a high-tension (high-voltage) consumer agrees with its DISCOM to draw. A share of it sets the floor for demand charges on every monthly bill.

  • Your power bill

    ToD tariff

    Time-of-day tariff: electricity priced by the hour of use, at least 20% cheaper in the state's solar hours and at least 20% dearer in peak hours for industry.

All terms, A to Z

33 terms · 16 with a full entry

A

  • Contracts & finance

    Accelerated depreciation

    The higher rate (40% a year on written-down value, as of Nov 2026) at which Indian tax rules let a business write off a solar plant it owns.

  • Grid & policy

    Additional surcharge

    A per-unit charge under Section 42(4) of the Electricity Act that lets a DISCOM recover the fixed costs of power it contracted for an open-access consumer. Captive users do not pay it.

  • Equipment & O&M

    AMC

    Annual maintenance contract: a yearly agreement covering a plant's cleaning, inspections, preventive and corrective maintenance, and reporting, ideally with uptime or generation guarantees.

B

  • Grid & policy

    Banking charges

    What a DISCOM charges to "store" surplus renewable power you inject into the grid and let you draw it back later in the settlement period.

  • Grid & policy

    Behind-the-meter

    A plant connected on your side of the DISCOM's meter, so its power is used directly by your factory and only the shortfall comes from the grid.

  • Equipment & O&M

    BESS

    Battery energy storage system: batteries with their own inverter and controls that store energy and release it later, used in industry mainly to cut peaks and back up critical loads.

C

  • Contracts & finance

    CAPEX vs OPEX

    The two main ways to pay for factory solar: buy and own the plant (CAPEX), or let a developer own it and pay a per-unit tariff for its power (OPEX, through a PPA).

  • Your power bill

    Contract demand

    The maximum power, usually in kVA, that a high-tension (high-voltage) consumer agrees with its DISCOM to draw. A share of it sets the floor for demand charges on every monthly bill.

  • Grid & policy

    Cross-subsidy surcharge

    A per-unit charge open-access consumers pay their DISCOM to make up for the cross-subsidy their regular tariff would have carried. Captive users are exempt.

  • Plant performance

    CUF

    Capacity utilisation factor: the energy a plant produced in a period divided by what it would have produced running at full rated capacity every hour of that period.

D

  • Plant performance

    DC/AC ratio

    A plant's DC module capacity (kWp) divided by its AC inverter capacity (kW). A ratio above 1 keeps inverters busier through the day, at the cost of some midday clipping.

  • Plant performance

    Degradation

    The gradual loss of a module's output over the years. Module warranties state the maximum loss allowed in the first year and in each year after.

  • Grid & policy

    DISCOM

    Distribution company: the utility that supplies power to your factory, bills you and approves grid connections, net metering and open access in its area.

G

  • Grid & policy

    Gross metering

    All the power a plant generates is exported to the grid through its own meter and paid for at a feed-in tariff, while everything the site uses is billed at the normal tariff.

  • Grid & policy

    Group captive

    An open-access structure in which electricity users jointly own at least 26% of a generating plant and consume at least 51% of its output, which exempts that power from cross-subsidy and additional surcharges.

I

  • Contracts & finance

    IRR

    Internal rate of return: the annual return a solar investment earns over its life, taking the timing of every cost and saving into account. Used to compare the plant with other uses of capital.

  • Equipment & O&M

    IV-curve test

    A test that sweeps a string of modules through its current-voltage curve to reveal faults such as damaged cells, failed bypass diodes or mismatch that monitoring alone may miss.

K

  • Plant performance

    kWp vs kW

    kWp is a plant's DC module capacity under standard test conditions; kW usually means AC power, such as the inverters' rated output or the power your factory draws.

L

  • Contracts & finance

    LCOE

    Levelised cost of energy: a plant's lifetime costs divided by the energy it will produce over its life, both discounted to today. A standard way to compare a solar unit with a grid unit.

N

  • Grid & policy

    Net billing

    Also called net feed-in: imported units are charged at your tariff and exported units are credited in rupees at a different, usually lower, rate, with the two set off on your bill.

  • Grid & policy

    Net metering

    A bidirectional meter records the units your plant exports and the units you import, and you pay only for the net units consumed in the billing period.

O

  • Grid & policy

    Open access

    The right to buy electricity from a generator other than your DISCOM, such as an offsite solar farm, and have it delivered over the grid for a set of network charges and surcharges.

P

  • Contracts & finance

    Payback period

    How long a plant's savings take to repay its upfront cost. Simple to grasp, but it ignores what the plant earns after payback, so read it alongside IRR.

  • Your power bill

    Peak shaving

    Cutting the highest point of your demand, usually with a battery or load scheduling, to lower the demand charge on your bill and avoid peak-hour tariffs.

  • Plant performance

    Performance ratio (PR)

    Of the energy a plant could have produced from the sunlight that reached it, the share it delivered. The standard measure of how well a plant is run.

  • Contracts & finance

    PPA

    Power purchase agreement: a developer builds, owns and runs a solar plant at your site, and you pay a per-unit tariff for the units it generates (plus any deemed-generation units the contract specifies).

R

  • Contracts & finance

    RESCO

    Renewable energy service company: a developer that invests in, owns and operates a solar plant on your premises and sells you the power under a PPA.

S

  • Your power bill

    Sanctioned load

    The total connected load, in kW or kVA, that your DISCOM has approved for your connection. State rules often use it to cap how much rooftop solar you can connect.

  • Equipment & O&M

    SCADA

    Supervisory control and data acquisition: the system that collects live data from inverters, meters and sensors so engineers can monitor a plant and act on faults remotely.

  • Plant performance

    Specific yield

    Energy generated per unit of installed capacity, in kWh per kWp per year. It depends mainly on location, tilt and shading, and lets you compare plants of different sizes.

T

  • Equipment & O&M

    Thermography

    Infrared imaging of modules and electrical panels, usually by drone or handheld camera, to find hot spots, failed cells and loose connections before they cost generation or cause damage.

  • Your power bill

    ToD tariff

    Time-of-day tariff: electricity priced by the hour of use, at least 20% cheaper in the state's solar hours and at least 20% dearer in peak hours for industry.

W

  • Grid & policy

    Wheeling charges

    What you pay the distribution company for carrying open-access power over its network from the generator to your factory, usually per unit, plus a share of energy lost on the way.

Free feasibility study

Bring a term from your proposal

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design