EMI
Solar on EMI: own your factory's plant and pay for it in instalments
With EMI the plant is yours from the day it is commissioned. A financing partner's loan pays for it, and you repay the loan in monthly instalments while the plant cuts your electricity bill. Adhvanik Energy designs, builds and commissions it.
- free feasibility study, no commitment
- 7 days
- typical plant delivery
- 90–100 days
- uptime guarantee
- 95%

At a glance
EMI in one view
EMI (equated monthly instalments) is one of the 4 ways to pay for a plant with us: ownership, as with CAPEX, paid for over time.
- Who owns it
- You do. The plant is yours from commissioning, and you pay for it in instalments.
- Who lends
- A financing partner. Its loan pays for the plant, and you repay the loan in equated monthly instalments (EMI).
- Who builds it
- Adhvanik Energy designs, procures, builds and commissions the plant, the same way as for a cash purchase.
- Who sets the credit terms
- The financing partner. The interest rate, the repayment period, any down payment and any security are in its offer.
- Who maintains it
- You choose: your own team, or our in-house O&M team under a contract of up to 25 years.
- Main benefit
- Ownership and the long-run savings of CAPEX, without paying the whole cost before the plant earns.
- Main limit
- Interest adds to the cost of the plant, and the instalment is due whether or not the sun shone that month.
- Suits a factory that
- Wants to own the plant but would rather keep its cash for production.
How EMI works
From your bill to a plant you own, in four steps
The loan is between you and the financing partner. The plant, its build and its upkeep are between you and us.
- 01
Size the plant and the saving
The feasibility study gives you an ROI sheet and a budgetary quote, which is what a lender asks to see.
- 02
Apply for the loan
You choose EMI in the enquiry. The financing partner assesses your company and sends its offer.
- 03
We build; you own
With the loan in place, we design, build and commission the plant (typical delivery: 90–100 days). It is your asset from day one.
- 04
Repay from the savings
Each month the plant cuts your bill and you pay the instalment. After the last one, the saving is all yours.
We work with financing partners including Tata Capital, Siemens, Solfin and Creditfair.
The loan
What a lender generally looks at before it lends
Each financing partner sets its own criteria and its own terms. These are the things lenders generally weigh, so you can get them ready.
Your financial statements
Profit, cash flow and the strength of the balance sheet behind the loan.
Your existing borrowing
What you already owe and how you have repaid it.
The plant's projected savings
How the saving on your bill compares with the instalment. The ROI sheet from our study sets this out.
Security
Whether the loan is secured on the plant or on other assets. Each partner has its own policy.
Who it suits
EMI or one of the other three models?
Ask two questions: do you want to own the plant, and do you want to pay for it now or over time?
EMI suits you if
- You want to own the plant from day one
- You would rather not take the whole cost out of working capital
- The projected saving sits comfortably against an instalment
- You are happy to run the plant, or to contract us to
Consider instead
- CAPEX
- If you have the cash or a cheaper loan already, buying outright avoids interest.
- Financial lease
- If you want lower cash at the start and are content to own the plant at the end of the lease.
- PPA / OPEX
- If you would rather not own or run a plant at all and just pay per unit.
Compare
EMI next to CAPEX, PPA and a lease
Ownership, cash at the start, what you pay over time and who carries the risk if the plant underperforms.
| EMIPay for the plant in instalments | CAPEXYou own the plant from day one | PPA / OPEXAdhvanik owns it; you pay per unit | Financial leaseLower upfront outgo, ownership via lease | |
|---|---|---|---|---|
| Who owns the plant | You, from commissioning | You, from day one | Adhvanik, for the PPA term | You move towards ownership; the lease sets when title passes |
| Cash at the start | Whatever the lender's offer asks for | The full plant cost | None from you | Lower than CAPEX |
| What you pay over time | Loan instalments, with interest | Nothing for the plant; O&M if you contract it | A tariff per unit generated | Lease rentals |
| Who sets the terms | The financing partner, in its offer | Your purchase order with us | The PPA, set per project | The financing partner, in its offer |
| Who carries performance risk | You, shared through our O&M guarantees if we run it | You, shared through our O&M guarantees if we run it | Mostly Adhvanik | You, shared through our O&M guarantees if we run it |
| How EMI works | CAPEX in detail | PPA in detail | Lease in detail |
Before you sign
Six questions to put to the lender's offer
Get each answer in writing before you sign the loan, and ask your CA how the loan and the plant will be treated in your accounts.
Cost of the loan
What is the effective interest rate once processing and other fees are counted?
The headline rate is not the full cost of borrowing.
Is the rate fixed or floating?
A floating rate can raise the instalment during the loan.
Cash flow
Does the projected monthly saving cover the instalment?
Put the ROI sheet next to the offer and check the gap month by month.
Is a down payment needed, and how much?
It changes how much cash you put in before the plant earns.
Flexibility
Can you prepay or close the loan early, and is there a charge?
If savings run ahead of plan, paying down the loan early cuts the interest.
What security or collateral does the lender ask for?
Security ties up assets you might need for other borrowing.
Warranties and upkeep
A plant you own, with warranties we handle
The loan changes how you pay, not how the plant is built or looked after. While you repay it, the plant has to keep generating, so upkeep matters.
Our O&M service- 1-year defect liability period on the entire installation.
- Manufacturer (OEM) warranties on modules, inverters and other equipment. We handle the claims with the manufacturer, so you don't have to.
- If our O&M team runs the plant, the contract carries a 95% uptime guarantee plus a performance-ratio guarantee. Lost generation is credited at ₹3.00/kWh
- 99% average asset uptime across the plants we maintain
- Remote response within 1 working day; an engineer on site within 2 working days if the fault cannot be fixed remotely
- Monitoring on Asset Connect, with a monthly report signed by an engineer
Common questions
Ownership, instalments, savings and upkeep: EMI questions
The loan terms come from the financing partner. The plant, the study and the upkeep come from us.
Compare all four financing modelsWho owns the plant if we pay through EMI?
You do. EMI is a loan for the plant: the financing partner pays for it, and you repay the loan in instalments while the plant is yours. The loan agreement says what security the lender holds until the last instalment.
Who sets the interest rate, the repayment period and the instalment?
The financing partner, in its offer. It sets them after assessing your company, so they differ from one factory to the next. We do not publish rates or instalments for that reason.
Is a down payment needed?
That is the financing partner's decision, and its offer will say whether one is needed and how much. Plan your cash flow from the offer, not from a general figure.
Will the monthly savings cover the EMI?
It depends on your grid tariff, how much power you use in daylight and the loan terms. Our feasibility study gives you financial ROI sheet based on a preliminary design; put it next to the lender's offer and compare the projected saving with the instalment for each month.
What does the lender look at before it approves the loan?
Each financing partner has its own criteria. Lenders generally look at your financial statements, your existing borrowings and repayment record, the plant's projected savings and the security on offer.
Who maintains the plant while we are paying for it?
The plant is yours, so you decide. Your own team can maintain it, or our in-house O&M team can, under a contract of up to 25 years. We respond remotely within 1 working day. If the fault cannot be fixed remotely, an engineer attends site within 2 working days.
What warranties come with the plant?
1-year defect liability period on the entire installation. Manufacturer (OEM) warranties on modules, inverters and other equipment. We handle the claims with the manufacturer, so you don't have to.
How is EMI different from a financial lease?
Under EMI the plant is yours from commissioning and the loan is repaid in instalments. Under a lease, lower upfront outgo, ownership via lease: you pay rentals and the lease sets when title passes. Ask your CA how each would be treated in your accounts. We work with financing partners including Tata Capital, Siemens, Solfin and Creditfair.
Guides and glossary
Guides on payback and your electricity bill
- How rooftop solar pays back for Indian industryRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Get the ROI sheet your lender will ask for
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Budgetary quote