Technology

The software behind our feasibility studies, builds and monthly reports

Adhvanik Energy built its own tools for sizing and pricing a plant, building it and running it. You never log in to most of them. You meet each one as something you receive: a feasibility study, a plant built to a standard design, a monthly report signed by an engineer.

The stack

Four tools, one for each stage of a plant's life

Feasibility, delivery and operation each run on their own system. AI-enabled checks sit at the two points where a mistake costs the most: the design before it reaches site, and cleaning once the plant runs.

  1. 01FeasibilityGreenAdhvanikProfiles your site and models tariff, IRR and feasibility before you commit.How it works
  2. 02BuildAdhvanik CentralRuns standard design, procurement, bill of quantities and milestone control.How it works
  3. 03OperateAsset ConnectTracks generation, PR, irradiance and alerts, and produces the monthly signed report.How it works
  4. 04CheckAI checksReviews designs and audits cleaning quality where mistakes are costly.How it works
Engineer on an industrial rooftop solar site

GreenAdhvanik

Feasibility modelling: your tariff, your roof and your IRR

GreenAdhvanik is our origination and feasibility tool. It profiles an industrial site and models tariff, IRR and feasibility, which is how a free study comes back in 7 days with figures your finance team can check against your own bills.

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
  • Budgetary quote
Completed rooftop plant with walkway and yellow safety handrails
A completed plant in Durgapur, West Bengal.

Adhvanik Central

Project ERP: one plan for design, procurement and milestones

Adhvanik Central is our project ERP, the system that runs a build. Standard design, procurement, the bill of quantities and milestone control live in one place, so each plant is built to a known plan. Typical plant delivery is 90–100 days.

  • Standard design across plants
  • Procurement and bill of quantities in one place
  • Milestone control through the build

Asset Connect

Monitoring that ends in a monthly report signed by an engineer

Asset Connect is our monitoring and O&M platform. It tracks generation, performance ratio, irradiance and alerts on the plants we run. It also produces the monthly report that an engineer signs before it reaches you. The report is how you check the plant against its guarantee, which our O&M page explains.

  • Generation, plant by plant
  • Performance ratio, so output is judged against the sunlight received
  • Irradiance alongside generation
  • Alerts that start the fault response, with a remote response within 1 working day

99%average asset uptime across the plants we maintain, on contracts of up to 25 years

How our O&M works
Illustration of the report's sections on Asset Connect. Layout only: no real plant data is shown.

AI checks

AI-enabled checks on the design and on the cleaning

A layout error found on screen costs an edit. Found on the roof, it costs a rework. Soiling that nobody checks costs output for months.

Design checks

A plant layout is checked before it goes to site, so a mistake is caught on screen, where it costs an edit, rather than on the roof, where it costs a rework.

Cleaning-quality audits

Cleaning rounds are audited, so a plant recorded as cleaned has been cleaned, and soiling losses do not hide behind a ticked checklist.

In your project

What you receive from each tool, and when

WhenToolWhat you receive
Before you signGreenAdhvanikA free feasibility study within 7 days: financial ROI sheet based on a preliminary design; policy check for your state and connection; roof feasibility and the area available for installation; budgetary quote.
During the buildAdhvanik CentralA plant built to a standard design, with procurement and milestones controlled in one system; typical delivery in 90–100 days.
Every month afterAsset ConnectMonitoring of generation, performance ratio, irradiance and alerts, and a report signed by an engineer, for contracts of up to 25 years.
At design and in O&MAI checksA layout checked before it reaches site, and cleaning rounds audited once the plant is running.

Hardware

Tier-one components, specified plant by plant

We are not tied to any one maker, so the bill of materials follows your roof and your load.

  • Solar modules

    N-type TOPCon modules from tier-one makers, monofacial or bifacial to suit the roof

  • Inverters

    String inverters sized to the array, with remote monitoring built in

  • Cables

    UV-resistant solar DC cables on the roof; armoured AC cables to your LT panel

  • Switchgear

    AC and DC distribution boxes with surge protection, tied into your LT panel

  • Structure

    Galvanised steel structure, designed for the wind speed under IS 875 as applicable

  • Earthing

    Earthing and lightning protection for the whole plant

The exact makes and ratings for your plant are set out in your technical proposal.

Free feasibility study

Send us a bill and see what the feasibility model returns

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation