Project · Madhya Pradesh

MYK Laticrete – Indore: 405 kWp metal sheet rooftop solar in Madhya Pradesh

MYK Laticrete bought the plant under CAPEX and owns it. The plant has supplied the site since Jun 2025. It is one of 5 MYK Laticrete plants on our project list.

405 kWp metal sheet rooftop plant at MYK Laticrete in Indore, Madhya Pradesh
Capacity
405 kWp
Installation
Metal sheet roof
Location
Indore, Madhya Pradesh
Finance model
CAPEX

Plant details

Client
MYK Laticrete
Capacity
405 kWp (DC), with 325 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jun 2025
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

405 kWp is mid-sized for the list, enough to span a production hall or two. 325 kW of inverters serve 405 kWp of modules: a DC/AC ratio of 1.25.

With a commissioning month of Jun 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Jun 2025 was a monsoon month, so early output ran under cloud.

For scale, the nearest match in capacity is Syngenta – Aurangabad (404 kWp, Maharashtra). Jun 2025 also saw Durian Industries – Palghar (525 kWp, Maharashtra) commissioned. Of the Madhya Pradesh plants on our list, Mysore Deep Perfumery – Indore was commissioned just before it and Springtech Suspensions – Pithampur just after.

On site

4 photos and a video clip from the plant. Select one to enlarge.

Engineering

How a 405 kWp plant is put together

For the metal sheet roof at MYK Laticrete – Indore, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.

On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.

Irradiance sensors give Asset Connect the sunshine a 405 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.

Finance model

Who owns the plant, and who runs it

The CAPEX route puts ownership with the client from the day of commissioning in Jun 2025. The plant is the owner's asset, and the owner decides how it is maintained and for how long.

After handover, the owner placed day-to-day care of the plant with our O&M team under contract.

Indore

Where MYK Laticrete – Indore sits on our list

Solar resource here
1,898 kWh/m² a yearAbout 1,606 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Indore; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp405 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Besides the plant, our list has 4 other plants in Indore. Sectors named there: packaging and printing; FMCG; personal care.

Indore is covered on the page for Pithampur and Indore, which lists 9 plants.

Madhya Pradesh has 9 projects on the list, across 2 towns. By roof, 9 on metal sheet roofs.

Projects

Related plants

Also in Indore

Elsewhere in Madhya Pradesh

Other plants on metal sheet roofs

Common questions

The MYK Laticrete – Indore plant: questions and answers

How long has the MYK Laticrete plant been running?

Our list records Jun 2025. Its seasonal pattern is now visible.

Who owns the MYK Laticrete – Indore plant?

The client owns it, because this Indore plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.

Could a plant like the plant fit my factory?

It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.

Free feasibility study

Want a 405 kWp plant on your own site?

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study