Project · Madhya Pradesh
MYK Laticrete – Indore: 405 kWp metal sheet rooftop solar in Madhya Pradesh
MYK Laticrete bought the plant under CAPEX and owns it. The plant has supplied the site since Jun 2025. It is one of 5 MYK Laticrete plants on our project list.

- Capacity
- 405 kWp
- Installation
- Metal sheet roof
- Location
- Indore, Madhya Pradesh
- Finance model
- CAPEX
Plant details
- Client
- MYK Laticrete
- Capacity
- 405 kWp (DC), with 325 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jun 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
405 kWp is mid-sized for the list, enough to span a production hall or two. 325 kW of inverters serve 405 kWp of modules: a DC/AC ratio of 1.25.
With a commissioning month of Jun 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Jun 2025 was a monsoon month, so early output ran under cloud.
For scale, the nearest match in capacity is Syngenta – Aurangabad (404 kWp, Maharashtra). Jun 2025 also saw Durian Industries – Palghar (525 kWp, Maharashtra) commissioned. Of the Madhya Pradesh plants on our list, Mysore Deep Perfumery – Indore was commissioned just before it and Springtech Suspensions – Pithampur just after.
Solar in the area: Madhya Pradesh · Pithampur and Indore. It is also listed in the full project list.
On site
4 photos and a video clip from the plant. Select one to enlarge.
Engineering
How a 405 kWp plant is put together
For the metal sheet roof at MYK Laticrete – Indore, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.
On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.
Irradiance sensors give Asset Connect the sunshine a 405 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.
Finance model
Who owns the plant, and who runs it
The CAPEX route puts ownership with the client from the day of commissioning in Jun 2025. The plant is the owner's asset, and the owner decides how it is maintained and for how long.
After handover, the owner placed day-to-day care of the plant with our O&M team under contract.
Indore
Where MYK Laticrete – Indore sits on our list
- Solar resource here
- 1,898 kWh/m² a yearAbout 1,606 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Indore; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp405 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Besides the plant, our list has 4 other plants in Indore. Sectors named there: packaging and printing; FMCG; personal care.
Indore is covered on the page for Pithampur and Indore, which lists 9 plants.
Madhya Pradesh has 9 projects on the list, across 2 towns. By roof, 9 on metal sheet roofs.
Sector pages: industries we work with. Rules for Madhya Pradesh: solar policy.
Projects
Related plants
Also in Indore
- Siddhi Vinayak Flexipack – Indore515 kWp · Metal sheet roof · Jun 2026
- Mysore Deep Perfumery – Indore266 kWp · Metal sheet roof · May 2025
- Apple Flexipack – Indore565 kWp · Metal sheet roof · Apr 2025
- Dabur – Indore500 kWp · Metal sheet roof · Feb 2025
Elsewhere in Madhya Pradesh
- Natural Living – Pithampur500 kWp · Metal sheet roof · Jun 2026
Other plants on metal sheet roofs
- HUL – Haridwar, 332 kWpMetal sheet roof · Jul 2026
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
Common questions
The MYK Laticrete – Indore plant: questions and answers
How long has the MYK Laticrete plant been running?
Our list records Jun 2025. Its seasonal pattern is now visible.
Who owns the MYK Laticrete – Indore plant?
The client owns it, because this Indore plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
Could a plant like the plant fit my factory?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 405 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Want a 405 kWp plant on your own site?
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.




