Project · Madhya Pradesh
Apple Flexipack – Indore: 565 kWp metal sheet rooftop solar in Madhya Pradesh
Generating since Apr 2025. Apple Flexipack bought the plant under CAPEX and owns it.

- Capacity
- 565 kWp
- Installation
- Metal sheet roof
- Location
- Indore, Madhya Pradesh
- Finance model
- CAPEX
Plant details
- Client
- Apple Flexipack
- Industry
- Packaging & Printing
- Capacity
- 565 kWp (DC), with 450 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Apr 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 565 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local. The array is 26% larger than the inverters, a DC/AC ratio of 1.26.
With a commissioning month of Apr 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Apr 2025 put its first months in the hot, dusty season.
For scale, the nearest match in capacity is West Coast – Surat (577 kWp, Gujarat). Mahyco – Buldhana (621 kWp, Maharashtra) and Samruddhi Industries – Sangli (800 kWp, Maharashtra) were also commissioned in Apr 2025. In Madhya Pradesh, in order of commissioning, Dabur – Indore comes before it and Simplex Metal Processors – Pithampur, 500 kWp after.
More on the area: Madhya Pradesh · Pithampur and Indore. Find this plant in the full project list.
Engineering
What a metal sheet rooftop plant involves
A shed roof in Indore gives a 565 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.
The layout in Indore is drawn around ventilators and skylights, which keep their access and stay out of the modules' shade. A shed roof is often long and clear in one direction, which allows straight rows and short cable runs to the LT panel.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
What CAPEX means here
CAPEX is the model where the client buys the plant. For Apple Flexipack – Indore, that means the 565 kWp system is the client's property since Apr 2025, with the savings and the upkeep decisions on the client's side.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Indore
Where Apple Flexipack – Indore sits on our list
- Solar resource here
- 1,898 kWh/m² a yearAbout 1,606 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Indore; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp565 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 5 plants in Indore, and the plant is one of them. Sectors named there: packaging and printing; FMCG; personal care.
Indore is covered on the page for Pithampur and Indore, which lists 9 plants.
Madhya Pradesh has 9 projects on the list, across 2 towns. By roof, 9 on metal sheet roofs.
Printing presses and converting lines draw steady power through the day shift, so output from a roof plant is used on site.
Humidity and temperature control for paper and film add to the daytime load, which a plant can cover in part.
Sector page: Packaging & printing solar. Rules for Madhya Pradesh: solar policy.
Projects
Related plants
Also in Indore
- Siddhi Vinayak Flexipack – Indore515 kWp · Metal sheet roof · Jun 2026
- MYK Laticrete – Indore405 kWp · Metal sheet roof · Jun 2025
- Mysore Deep Perfumery – Indore266 kWp · Metal sheet roof · May 2025
- Dabur – Indore500 kWp · Metal sheet roof · Feb 2025
Elsewhere in Madhya Pradesh
- Natural Living – Pithampur500 kWp · Metal sheet roof · Jun 2026
Other plants on metal sheet roofs
- Terex – Gujarat352 kWp · Metal sheet roof · Mar 2025
- Ronch Polymer – Daman, 478 kWpMetal sheet roof · Dec 2024
- Ronch Polymer – Daman, 173 kWpMetal sheet roof · Dec 2024
- Radiant Indus Chem – Aurangabad1,235 kWp · Metal sheet roof · Dec 2024
Common questions
What people ask about this plant
What does 565 kWp mean for the Apple Flexipack plant?
The plant carries 565 kWp of modules and 450 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. As a ratio that is 1.26: the array is rated above the inverters, which cap what the plant can feed the site at any moment.
What roof is this Indore plant built on?
It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.
Do you build plants in Madhya Pradesh?
Yes. 5 plants are listed for Indore, among 9 in Madhya Pradesh. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 565 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.