Grid & policy

Net metering

Net metering is a billing arrangement in which a bidirectional meter records the units your solar plant exports to the grid and the units you import, and you pay only for the net units consumed in the billing period.

How net metering works

Your plant feeds your factory first. When it produces more than the factory is using, on a Sunday or a holiday, the surplus flows out through a bidirectional meter and is recorded as export. At the end of the billing period, exported units are set off against the units you imported, and you pay for the difference. Surplus credit left at the end of the settlement period is handled as your state's regulations say, often at a rate well below your tariff.

Who can use it

The Electricity (Rights of Consumers) Amendment Rules, 2021 let state commissions allow net metering for loads up to 500 kW or the sanctioned load, whichever is lower. Above 500 kW, the central rule points loads to gross metering (or net billing); states set the arrangement. Each state sets its own limits and terms in its regulations; Rajasthan, for instance, moved to the 500 kW limit in September 2021. Rules as of Nov 2026.

Why net metering matters less to many factories

A factory running two or three shifts, six days a week, uses almost every unit its rooftop plant generates. Net metering earns its keep on weekly offs, holidays and shutdowns, when surplus would otherwise be wasted. Because states revise their net-metering rules from time to time, we treat export credits as a bonus and size the plant so the economics stand on self-consumption. Behind-the-meter solar explains how that sizing works.

Illustrative example

Worked example: one month's bill

A factory with a net-metered rooftop plant.

Plant generation
60,000 kWh
Used directly by the factory
52,000 kWh
Exported on Sundays and holidays
8,000 kWh
Imported from the grid at other times
1,00,000 kWh

Units billed: 1,00,000 − 8,000 = 92,000 kWh.

Illustrative numbers. How exports are valued, and over what period, depends on your state.

What to confirm for your site

  • Your state's net-metering limit for industrial consumers, and how it relates to your sanctioned load
  • The settlement period, and what happens to surplus credit at the end of it
  • Whether exports and imports are netted within time-of-day slots
  • Any charges your state applies to net-metered industrial consumers
  • Meter replacement, testing and the approval timeline

Net metering on our plants and in the study

On metal sheet roofs, plants can be net-metered or behind-the-meter. Every feasibility study includes a policy check for your state and connection.

Get a free feasibility study

Sources

  1. Power Line: Electricity (Rights of Consumers) Amendment Rules, 2021 notified (opens in a new tab)
  2. Renewable Watch: RERC raises net metering limit to 500 kW (Sep 2021) (opens in a new tab)

Related terms

  • Grid & policy

    Gross metering

    All the power a plant generates is exported to the grid through its own meter and paid for at a feed-in tariff, while everything the site uses is billed at the normal tariff.

  • Grid & policy

    Net billing

    Also called net feed-in: imported units are charged at your tariff and exported units are credited in rupees at a different, usually lower, rate, with the two set off on your bill.

  • Grid & policy

    Behind-the-meter

    A plant connected on your side of the DISCOM's meter, so its power is used directly by your factory and only the shortfall comes from the grid.

  • Your power bill

    Sanctioned load

    The total connected load, in kW or kVA, that your DISCOM has approved for your connection. State rules often use it to cap how much rooftop solar you can connect.

Keep reading

Free feasibility study

Find out what net metering is worth to you

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study