Project · Madhya Pradesh

Siddhi Vinayak Flexipack – Indore: 515 kWp metal sheet rooftop solar in Madhya Pradesh

Siddhi Vinayak Flexipack bought the plant under CAPEX and owns it. The plant has supplied the site since Jun 2026.

Capacity
515 kWp
Installation
Metal sheet roof
Location
Indore, Madhya Pradesh
Finance model
CAPEX

Plant details

Client
Siddhi Vinayak Flexipack
Industry
Packaging & Printing
Capacity
515 kWp (DC), with 400 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jun 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

A 515 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. Its 515 kWp of modules feed 400 kW of inverters, a DC/AC ratio of 1.29.

The plant in Indore started supplying the site in Jun 2026. A few months of readings will set its baseline. Jun 2026 was a monsoon month, so early output ran under cloud.

For scale, the nearest match in capacity is Marico – Jalgaon (517 kWp, Maharashtra). Jun 2026 also saw West Coast – Surat (162 kWp, Gujarat) and Samruddhi Industries – Samadhan Industries, Maharashtra (250 kWp, Maharashtra) commissioned. Its nearest neighbour in Madhya Pradesh, in order of commissioning, is Natural Living – Pithampur.

Engineering

What a metal sheet rooftop plant involves

Siddhi Vinayak Flexipack – Indore is one of the metal sheet roof plants on our list. On a shed in Madhya Pradesh, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.

On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.

Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Indore call for them, with AI-enabled checks on cleaning quality.

Finance model

Who owns the plant, and who runs it

Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at Siddhi Vinayak Flexipack – Indore since Jun 2026.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Indore

Indore and the packaging and printing sector

Solar resource here
1,898 kWh/m² a yearAbout 1,606 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Indore; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp515 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Besides the plant, our list has 4 other plants in Indore. The named sectors are packaging and printing; FMCG; personal care.

Indore is covered on the page for Pithampur and Indore, which lists 9 plants.

Across Madhya Pradesh our list holds 9 plants in 2 towns, commissioned between 2024 and 2026.

Packaging works often run presses, laminators and cutters for long shifts, and that load fits solar hours.

Packaging units are commonly housed in metal sheet sheds, so the sheet condition and the purlin spacing set the design.

Projects

Related plants

Also in Indore

Elsewhere in Madhya Pradesh

Other plants on metal sheet roofs

Common questions

What people ask about this plant

When was the Siddhi Vinayak Flexipack plant commissioned?

Our list records Jun 2026. The early question is whether output matches the design.

Who looks after the 515 kWp plant at Indore?

Under CAPEX the client owns the Siddhi Vinayak Flexipack plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.

How do I find out if my roof can carry 515 kWp?

Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.

Free feasibility study

Plan a plant for your own Madhya Pradesh site

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study