Madhya Pradesh
Industrial rooftop solar in Pithampur and Indore
9 plants in the Indore and Pithampur belt, from auto-component makers to packaging and personal-care plants.
- projects listed here in Pithampur and Indore
- 9
- places with a plant
- 2
- industries named
- 4
- most recent commissioning
- Jun 2026
The industrial belt
Pithampur in the Indore region
Pithampur is an industrial town in Dhar district and part of the Indore Metropolitan Region. Its industrial area is laid out in sectors, developed by the state's industrial development agencies. The automotive cluster here is the best known of its sectors.
Indore is the state's largest city. In our list the Pithampur plants lean automotive and the Indore ones lean packaging and consumer products.
Sources: Pithampur (opens in a new tab). As of Nov 2026.
Our plants here
Pithampur leans automotive, Indore packaging
The 9 plants listed here were commissioned between 2024 and 2026. Named sectors: automotive, packaging and printing, FMCG and personal care. By roof: 9 on metal sheet roofs. Of the plants we built, 7 were CAPEX and 1 was PPA / OPEX (the model is not recorded for 1).
Two auto-component entries here share a name and were commissioned about four months apart. Plants of the same company are often designed at different times, so ask whether your earlier plant's monitoring can be extended to the new one.
Projects
Plants listed in Pithampur and Indore
Newest first.
- 515 kWp
Siddhi Vinayak Flexipack – Indore
Madhya Pradesh
Commissioned Jun 2026
- 500 kWp
Natural Living – Pithampur
Madhya Pradesh
Commissioned Jun 2026
- 400 kWp
Springtech Suspensions – Pithampur
Madhya Pradesh
Commissioned Feb 2026
405 kWp
MYK Laticrete – Indore
Madhya Pradesh
Commissioned Jun 2025
266 kWp
Mysore Deep Perfumery – Indore
Madhya Pradesh
Commissioned May 2025
- 500 kWp
Simplex Metal Processors – Pithampur, 500 kWp
Madhya Pradesh
Commissioned Apr 2025
565 kWp
Apple Flexipack – Indore
Madhya Pradesh
Commissioned Apr 2025
- 500 kWp
Dabur – Indore
Madhya Pradesh
Commissioned Feb 2025
- 350 kWp
Simplex Metal Processors – Pithampur, 350 kWp
Madhya Pradesh
Commissioned Dec 2024
What to check first
Checks for Pithampur and Indore, starting with your shifts
- 01
Shift pattern
Solar helps most when you run through the day. Read your bill by time-of-day band before sizing.
Guide: reading your electricity bill - 02
Roof condition
Older sheds may need a structural check before any array goes up.
Metal sheet roof solar - 03
Rules for your connection
Net-metering and open-access terms are revised from time to time. Read the current rules for your connection before you size.
Madhya Pradesh solar policy
Guides and glossary
Guides and terms for Pithampur and Indore factories
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
- How rooftop solar pays back for Indian industryRead the guide
Terms used on this page
Common questions
What Pithampur and Indore factories ask before they buy
Speak with an industrial solar engineerDo you build in Pithampur Sectors 1, 2 and 3?
Our plants are listed by town, so none is tied to a numbered sector. If your factory is in any of them or in Kheda, give us your town and average monthly bill; that is all the free 7-day feasibility study needs to begin.
Which sectors are the plants in?
Automotive, packaging and printing, FMCG and personal care, plus plants tagged as general industrial. The projects above show each with its commissioning month.
Are they CAPEX or PPA?
Of the plants we built, 7 were CAPEX and 1 was PPA / OPEX (the model is not recorded for 1). The financing pages compare buying the plant with paying for its power.
Will a three-shift plant in Pithampur gain much from solar?
Solar covers the daytime hours, so the gain depends on how much of your load runs between sunrise and sunset. Read your bill by time-of-day band, and size the plant against the day load rather than the whole bill.
Is there an Adhvanik engineer near my factory in Pithampur and Indore?
Our team includes people based in Indore. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.
Free feasibility study
Pithampur or Indore factory? Send the bill
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation