Project · Madhya Pradesh
Dabur – Indore: 500 kWp metal sheet rooftop solar in Madhya Pradesh
Generating since Feb 2025. Adhvanik Energy owns and runs it, and Dabur pays for each unit the plant generates, under a PPA. It is one of 5 Dabur plants on our project list.
- Capacity
- 500 kWp
- Installation
- Metal sheet roof
- Location
- Indore, Madhya Pradesh
- Finance model
- PPA / OPEX
Size, roof and finance model
- Client
- Dabur
- Industry
- FMCG
- Capacity
- 500 kWp (DC), with 375 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Feb 2025
- Status
- Operational. Owned and run by Adhvanik Energy.
A 500 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. 375 kW of inverters serve 500 kWp of modules: a DC/AC ratio of 1.33.
Dabur – Indore began supplying the site in Feb 2025. With a full year on record, a month that falls short of the same month last year stands out. Feb 2025 falls in the short-day season.
Closest in capacity on the list: Simplex Metal Processors – Pithampur (500 kWp). In Madhya Pradesh, in order of commissioning, Simplex Metal Processors – Pithampur, 350 kWp comes before it and Apple Flexipack – Indore after.
On the location pages: Madhya Pradesh · Pithampur and Indore. Find this plant in the full project list.
Engineering
The engineering behind a plant like Dabur – Indore
Metal sheet is a light roof, and a 500 kWp array adds weight and wind load to purlins that were sized for the sheet alone. On a roof like this one in Indore, a structural engineer confirms the roof can take the load, and the structure is designed for the wind speed under IS 875.
Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 500 kWp plant runs.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
How the plant is paid for
A PPA moves the capital cost to us. The client at the plant has had a solar supply since Feb 2025, with the cost arriving as a per-unit charge on what the plant supplies.
For the host site the PPA is a long contract, with terms from 5 to 25 years.
Indore
Indore and the FMCG sector
- Solar resource here
- 1,898 kWh/m² a yearAbout 1,606 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Indore; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp500 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
Indore is a repeat location on the list, with 5 plants listed. Sectors named there: packaging and printing; FMCG; personal care.
Indore is covered on the page for Pithampur and Indore, which lists 9 plants.
Across Madhya Pradesh our list holds 9 plants in 2 towns, commissioned between 2024 and 2026.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar. Rules for Madhya Pradesh: solar policy.
Projects
More plants near Indore
Also in Indore
- Siddhi Vinayak Flexipack – Indore515 kWp · Metal sheet roof · Jun 2026
- MYK Laticrete – Indore405 kWp · Metal sheet roof · Jun 2025
- Mysore Deep Perfumery – Indore266 kWp · Metal sheet roof · May 2025
- Apple Flexipack – Indore565 kWp · Metal sheet roof · Apr 2025
Elsewhere in Madhya Pradesh
- Natural Living – Pithampur500 kWp · Metal sheet roof · Jun 2026
Other plants on metal sheet roofs
- Ronch Polymer – Pune, 332 kWpMetal sheet roof · Jan 2022
- Apex Knives – Nagpur200 kWp · Metal sheet roof · Dec 2021
- UCC – Pune, 310 kWpMetal sheet roof · Jun 2021
- MTC – Pune270 kWp · Metal sheet roof · May 2021
Common questions
What people ask about this plant
What does 500 kWp mean for the Dabur plant?
The plant carries 500 kWp of modules and 375 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. The modules exceed the inverter rating by about 33%, a DC/AC ratio of 1.33.
What does the roof mean for the 500 kWp plant at Indore?
It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.
Does Adhvanik Energy work near Indore?
Yes. 5 plants are listed for Indore, among 9 in Madhya Pradesh. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 500 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Madhya Pradesh site
A 500 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.