Project · Madhya Pradesh

Mysore Deep Perfumery – Indore: 266 kWp metal sheet rooftop solar in Madhya Pradesh

Mysore Deep Perfumery bought the plant under CAPEX and owns it. The plant has supplied the site since May 2025.

266 kWp metal sheet rooftop plant at Mysore Deep Perfumery in Indore, Madhya Pradesh
Capacity
266 kWp
Installation
Metal sheet roof
Location
Indore, Madhya Pradesh
Finance model
CAPEX

Size, roof and finance model

Client
Mysore Deep Perfumery
Industry
Personal Care
Capacity
266 kWp (DC), with 200 kW (AC) of inverters
Service
EPC + O&M
Commissioned
May 2025
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 266 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters. 200 kW of inverters serve 266 kWp of modules: a DC/AC ratio of 1.33.

With a commissioning month of May 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. May 2025 put its first months in the hot, dusty season.

Closest in capacity on the list: MTC – Pune (270 kWp, Maharashtra). May 2025 also saw Zenith Irrigation – Nashik (420 kWp, Maharashtra) and Legrand – Sinnar (141 kWp, Maharashtra) commissioned. Of the Madhya Pradesh plants on our list, Simplex Metal Processors – Pithampur, 500 kWp was commissioned just before it and MYK Laticrete – Indore just after.

On site

4 photos from the plant. Select one to enlarge.

Engineering

How a 266 kWp plant is put together

The 266 kWp at Mysore Deep Perfumery – Indore sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.

On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.

Irradiance sensors give Asset Connect the sunshine a 266 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.

Finance model

How the plant is paid for

Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at the Mysore Deep Perfumery plant since May 2025.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Indore

Where Mysore Deep Perfumery – Indore sits on our list

Solar resource here
1,898 kWh/m² a yearAbout 1,606 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Indore; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp266 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

We list 5 plants in Indore, and this Indore plant is one of them. Sectors named there: packaging and printing; FMCG; personal care.

Indore is covered on the page for Pithampur and Indore, which lists 9 plants.

In Madhya Pradesh the list shows 9 projects in 2 towns. Named sectors include automotive; packaging and printing; FMCG; personal care.

Blending and filling lines run in daylight, so most of a roof plant's output is used on site.

Personal-care units in compact estates have little spare ground, so the roof is the place for a plant.

Projects

More plants near Indore

Also in Indore

Elsewhere in Madhya Pradesh

Other plants on metal sheet roofs

Common questions

The Mysore Deep Perfumery – Indore plant: questions and answers

What is the commissioning date of the Mysore Deep Perfumery – Indore plant?

Our list records May 2025.

Who owns the Mysore Deep Perfumery – Indore plant?

Under CAPEX the client owns the plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.

Can the Mysore Deep Perfumery – Indore design be repeated at my site?

Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.

Free feasibility study

Find out what your sheds can carry

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study