Solar policy · GERC

Solar rules for factories in Gujarat

Gujarat’s rooftop rules have been amended five times since 2016, and size limits, set-off and export payment depend on the class of consumer. The 2022 amendment replaced the 2020 formulas. The sections below give its text and what to check.

  • Rooftop regulationGERC Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016, amended to 2025134
  • Size (2022 text)No sanctioned-load limit for captive and third-party-sale projects, within the permissible limit1
  • Set-off (2022 text)HT and EHV captive plants: same day, 07:00 to 18:001
  • Green open accessSixth Amendment, August 2026, revised the interim banking charge56
Rules as of Nov 2026
Regulations and orders change. We quote rules and dates, not tariffs, surcharges or network-charge rates, because those are set by order and move. GERC regulates; GEDA, or an agency the state designates, registers rooftop projects.

Rooftop rules: five amendments since 2016

The framework is the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016. The commission has amended it five times: in 2017, 2020, 2022 (Third Amendment, Notification No. 2 of 2022), 2024 (Fourth Amendment, notified 6 September 2024, which amended Regulation 7) and 2025 (Fifth Amendment, in force from 4 November 2025).1234

The 2020 second amendment tied rooftop size at a non-residential connection to 50% of sanctioned load or contract demand and left the export rate to the commission. The 2022 third amendment replaced those provisions, so a summary based on the 2020 text is out of date.12

Source: GERC Third Amendment, Notification No. 2 of 2022. We do not quote the rates; confirm the current ones.
ConsumerSize limit (2022 text)Set-off and export (2022 text)
Captive consumer, HT or EHVNo restriction up to sanctioned load or contract demand, within the permissible limit.1Solar energy set off only if consumed between 07:00 and 18:00 on the same day. Surplus beyond that is bought by the distribution company at surplus injection compensation rates.1
Captive consumer, LT demand-basedSame as above.1Set-off between 07:00 and 18:00 within the same billing cycle. Other LT consumers are accounted on a billing-cycle basis.1
MSME manufacturing enterprise (surplus)Same as above.1A rate fixed for the first five years from commissioning, then a formula linked to GUVNL’s competitively bid solar tariffs, fixed for the rest of the agreement.1
Other than MSME manufacturing (surplus)Same as above.1A formula linked to GUVNL’s competitively bid solar tariffs in the preceding six months, fixed for the term of the agreement.1
Projects under the REC mechanismUp to sanctioned load or contract demand.1Per the regulation text.1

Two more rules matter. A per-unit banking charge applies to solar energy consumed, at different levels for demand-based consumers and for MSME and other consumers, and government buildings are exempt. And captive status is tested on ownership and consumption each financial year: a plant that fails the test is treated as third-party supply and attracts cross-subsidy and additional surcharge.1 Ask for the current banking charge instead of relying on a printed one.

On connection voltage, the fifth amendment (November 2025) stops hard-coding a table in the net-metering rules and points to the GERC Supply Code. The Supply Code’s 2024 amendment lets a consumer choose low-tension connectivity up to 150 kVA or kW of contract demand, up from 100.3

Green energy open access: banking charge reset in 2026

GERC published draft green energy open access regulations in June 2023 and has amended the final rules several times since.8 The Fifth Amendment extended an interim banking charge.7 In August 2026 GERC notified a Sixth Amendment that revised the interim banking charge and, as reported, moves to annual determination of the charge from April 2027.56 Check the figure and the methodology in the gazette before you model banking.

GERC also sets the additional surcharge for open access consumers by order for each six-month period; one such order covered April to September 2025.9 Ask your distribution company for the one that applies now.

The central rules set the eligibility threshold at 100 kW or more of contract demand or sanctioned load, with no load limit for captive users.1011 Confirm the threshold and any aggregation rule in GERC’s current text.

Start with your consumer class

In Gujarat the first question is your consumer class. As a captive HT or EHV consumer you are not held to sanctioned load, within the permissible limit, but only solar you consume between 07:00 and 18:00 on the same day is set off. Anything beyond that is paid at a formula rate instead of your retail tariff, so size the plant to your daytime consumption.1

If you are an MSME manufacturer, the surplus formula differs in the first five years, which changes the payback on a plant sized above your own daytime load.1

Captive status is a continuing test. Whoever owns the plant, for example under a PPA, has to be set up so the ownership and consumption tests are met each financial year, or the plant is treated as third-party supply and the surcharges apply.1

Because the rules have changed five times and the banking charge was reset in August 2026, build the feasibility study on the current consolidated text and ask for the current surplus compensation and banking charge in writing.

Confirm with GEDA or your distribution company

Questions to put to the distribution company in writing before you finalise the design:

  1. Whether your enterprise is classed as an MSME manufacturing enterprise, and the surplus formula that applies to you.
  2. Whether your plant is captive or third-party sale, and how ownership and consumption will be proven each year.
  3. The current permissible limit for your connection under the amended regulations.
  4. The current surplus injection compensation and banking charge, in writing.
  5. Your connection voltage under the GERC Supply Code and whether any strengthening charge applies.

Sources

Checked 4 Nov 2026. Where a source is trade press, the regulator’s own order or regulation text is the authority; confirm the version in force for your connection.

  1. GERC: Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022, Notification No. 2 of 2022 (opens in a new tab)
  2. GERC: Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020 (copy on CBIP) (opens in a new tab)
  3. SolarQuarter: GERC approves Fifth Amendment to net metering regulations, 2025 (opens in a new tab)
  4. GERC: Net Metering Rooftop Solar PV Grid Interactive Systems (Fourth Amendment) Regulations, 2024 (opens in a new tab)
  5. Energetica India: Gujarat reduces green energy open access banking charge (27 August 2026) (opens in a new tab)
  6. TeamLease RegTech: GERC Terms and Conditions for Green Energy Open Access, Sixth Amendment Regulations, 2026 (opens in a new tab)
  7. SolarQuarter: GERC extends interim green energy open access banking charge until 31 August 2026 (opens in a new tab)
  8. SolarQuarter: GERC proposes draft regulations for green energy open access (June 2023) (opens in a new tab)
  9. SolarQuarter: GERC sets additional surcharge for open access consumers, April to September 2025 (opens in a new tab)
  10. Mercom: consumers with aggregate demand of 100 kW can avail green energy open access (opens in a new tab)
  11. Mercom: no load limit for green energy open access for captive consumers (June 2022) (opens in a new tab)

Common questions

Questions on Gujarat set-off and banking

Speak with an industrial solar engineer
Is there a size limit on rooftop solar for a factory in Gujarat?

Under the 2022 amendment, captive consumers and third-party-sale projects are not restricted to sanctioned load or contract demand, within the permissible limit in the regulations. The 2020 limit of 50% of sanctioned load was replaced, and further amendments followed in 2024 and 2025, so check the current text.

How does Gujarat treat solar energy a captive factory does not use?

For HT and EHV captive plants, set-off applies only to solar energy consumed between 07:00 and 18:00 on the same day. Surplus beyond that is bought by the distribution company at a formula rate linked to competitively bid solar tariffs, with a different arrangement for MSME manufacturers in the first five years.

What changed for open access banking in Gujarat in 2026?

GERC notified a Sixth Amendment in August 2026 that revised the interim banking charge and, as reported, moves to annual determination from April 2027. Check the gazette for the figure.

Keep reading

Guides, glossary terms and the other seven states

Free feasibility study

Which consumer class is your Gujarat plant?

Send us your bill and sanctioned load. An engineer replies within 48 hours and the study includes the metering route that fits your connection.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study