Gross metering is an arrangement in which all the electricity a solar plant generates is exported to the grid through its own meter and paid for at a feed-in tariff, while everything the site consumes is billed separately at the normal tariff.

How it differs from net metering

Under net metering, solar power serves your load first and only the surplus is exported. Under gross metering the plant and the factory are measured separately: the plant sells its entire output to the DISCOM, and the factory keeps buying all its power at the normal tariff. You earn the feed-in payment, and your power bill stays as it was.

Net billing, also called net feed-in, sits between the two: imports are charged at your tariff and exports are credited in rupees at a different rate, with the two set off on the bill.

Why it rarely suits a factory

Feed-in tariffs are usually well below what an industrial consumer pays for grid power. Selling every unit at the feed-in rate gives up the gap between the two on every unit the factory could have used itself. That is why factories prefer a behind-the-meter plant, which replaces grid units at the full tariff.

Where you will meet it

Under the Electricity (Rights of Consumers) Amendment Rules, 2021, the central rule points loads above 500 kW to gross metering (or net billing); states set the arrangement. In practice, many large factories avoid it by keeping the plant behind the meter with a zero-export controller. Some state schemes also use gross metering for specific categories. Rules as of Nov 2026.

Illustrative example

Worked example: the value of 1,000 units

The same 1,000 solar units, valued two ways.

Used on site, replacing grid power at ₹8.00
₹8,000
Exported under gross metering at a ₹3.50 feed-in tariff
₹3,500

Self-consumption is worth more than twice as much per unit in this case.

Illustrative numbers. Feed-in tariffs and industrial tariffs vary by state.

If your state requires gross metering

  • The feed-in tariff, and whether it is fixed for the life of the plant
  • How and when the DISCOM pays for exported units
  • Whether a behind-the-meter design with zero export is allowed instead
  • Who owns, tests and maintains the generation meter

Comparing metering options in the study

Our feasibility study includes a policy check for your state and connection, so you can see what each metering option is worth before you decide.

Get a free feasibility study

Sources

  1. Power Line: Electricity (Rights of Consumers) Amendment Rules, 2021 notified (opens in a new tab)

Related terms

  • Grid & policy

    Net metering

    A bidirectional meter records the units your plant exports and the units you import, and you pay only for the net units consumed in the billing period.

  • Grid & policy

    Net billing

    Also called net feed-in: imported units are charged at your tariff and exported units are credited in rupees at a different, usually lower, rate, with the two set off on your bill.

  • Grid & policy

    Behind-the-meter

    A plant connected on your side of the DISCOM's meter, so its power is used directly by your factory and only the shortfall comes from the grid.

  • Grid & policy

    DISCOM

    Distribution company: the utility that supplies power to your factory, bills you and approves grid connections, net metering and open access in its area.

Keep reading

Free feasibility study

Compare metering options for your plant

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study