When open access makes sense
A factory roof can rarely carry enough panels to meet a large, round-the-clock load. Open access lets you add solar from a plant elsewhere in the state and receive it through the grid. For most factories the best order is rooftop first, then open access for the remaining load. Rooftop power pays no wheeling charges or open-access surcharges; a few states levy network or grid-support charges on rooftop generation, so check yours.
The Green Energy Open Access Rules, 2022
The Ministry of Power's rules, notified in June 2022 and since amended, set out what states must allow for renewable open access:
- Any consumer with a contract demand or sanctioned load of 100 kW or more is eligible, down from the 1 MW limit most states used before. Connections in the same electricity division can be added together to reach 100 kW.
- Captive consumers face no load limit.
- The nodal agency must decide on applications within 15 days.
- Banking must be allowed for at least 30% of monthly consumption, settled at least monthly.
- The cross-subsidy surcharge cannot rise by more than 50% over the 12 years from the start of open access, and additional surcharge does not apply if the consumer already pays fixed charges.
States implement these through their own regulations, so eligibility, charges and timelines differ from state to state. Rules as of Nov 2026.
The charges that set your landed cost
The price at the solar farm is only the start. Your landed cost per unit, the full price once the power reaches your factory, adds transmission and wheeling charges for the network, the cross-subsidy and additional surcharges (unless the plant is captive), banking charges, scheduling fees and line losses. Each is set by your state commission and revised in its tariff orders.
Illustrative example
Worked example: building up a landed cost
How an open-access unit compares with grid power for a third-party buyer.
- Tariff at the solar plant
- ₹3.50 per kWh
- Transmission and wheeling
- + ₹1.00
- Cross-subsidy and additional surcharge
- + ₹1.50
- Banking, losses and fees
- + ₹0.30
- Landed cost
- ₹6.30 per kWh
- Grid energy charge
- ₹8.00 per kWh
Saving: ₹1.70 per unit. Under group captive, the ₹1.50 of surcharges falls away and the saving rises to ₹3.20.
Illustrative numbers only. Every line varies by state and is revised each year.
What to check in your state
- Whether your state regulations have adopted the 100 kW threshold and the aggregation rule
- Current wheeling, transmission, surcharge and banking charges in the latest tariff order
- Whether the power will be captive (no surcharges) or third-party (surcharges apply)
- Banking terms: settlement period, any time-of-day limits, and what happens to unused units
- How long connectivity and open-access approvals take in practice
Rooftop and open access together
We build offsite solar wheeled to your plant, for loads larger than your roof can serve. Where your roof can serve part of the load, we design rooftop and open access together.
Sources
- JMK Research: Green Energy Open Access Rules 2022, summary of provisions (opens in a new tab)
- Mercom: consumers with aggregate demand of 100 kW can avail green energy open access (opens in a new tab)
- Mercom: no load limit for green energy open access for captive consumers (June 2022) (opens in a new tab)
- Mercom: Tamil Nadu cuts rooftop solar network charges for MSMEs (Dec 2023) (opens in a new tab)