Grid & policy

Open access solar

Open access lets an electricity consumer buy power from a generator other than its local DISCOM, such as an offsite solar farm, and have it delivered over the transmission and distribution network for a set of charges.

When open access makes sense

A factory roof can rarely carry enough panels to meet a large, round-the-clock load. Open access lets you add solar from a plant elsewhere in the state and receive it through the grid. For most factories the best order is rooftop first, then open access for the remaining load. Rooftop power pays no wheeling charges or open-access surcharges; a few states levy network or grid-support charges on rooftop generation, so check yours.

The Green Energy Open Access Rules, 2022

The Ministry of Power's rules, notified in June 2022 and since amended, set out what states must allow for renewable open access:

  • Any consumer with a contract demand or sanctioned load of 100 kW or more is eligible, down from the 1 MW limit most states used before. Connections in the same electricity division can be added together to reach 100 kW.
  • Captive consumers face no load limit.
  • The nodal agency must decide on applications within 15 days.
  • Banking must be allowed for at least 30% of monthly consumption, settled at least monthly.
  • The cross-subsidy surcharge cannot rise by more than 50% over the 12 years from the start of open access, and additional surcharge does not apply if the consumer already pays fixed charges.

States implement these through their own regulations, so eligibility, charges and timelines differ from state to state. Rules as of Nov 2026.

The charges that set your landed cost

The price at the solar farm is only the start. Your landed cost per unit, the full price once the power reaches your factory, adds transmission and wheeling charges for the network, the cross-subsidy and additional surcharges (unless the plant is captive), banking charges, scheduling fees and line losses. Each is set by your state commission and revised in its tariff orders.

Illustrative example

Worked example: building up a landed cost

How an open-access unit compares with grid power for a third-party buyer.

Tariff at the solar plant
₹3.50 per kWh
Transmission and wheeling
+ ₹1.00
Cross-subsidy and additional surcharge
+ ₹1.50
Banking, losses and fees
+ ₹0.30
Landed cost
₹6.30 per kWh
Grid energy charge
₹8.00 per kWh

Saving: ₹1.70 per unit. Under group captive, the ₹1.50 of surcharges falls away and the saving rises to ₹3.20.

Illustrative numbers only. Every line varies by state and is revised each year.

What to check in your state

  • Whether your state regulations have adopted the 100 kW threshold and the aggregation rule
  • Current wheeling, transmission, surcharge and banking charges in the latest tariff order
  • Whether the power will be captive (no surcharges) or third-party (surcharges apply)
  • Banking terms: settlement period, any time-of-day limits, and what happens to unused units
  • How long connectivity and open-access approvals take in practice

Rooftop and open access together

We build offsite solar wheeled to your plant, for loads larger than your roof can serve. Where your roof can serve part of the load, we design rooftop and open access together.

See open access solar

Sources

  1. JMK Research: Green Energy Open Access Rules 2022, summary of provisions (opens in a new tab)
  2. Mercom: consumers with aggregate demand of 100 kW can avail green energy open access (opens in a new tab)
  3. Mercom: no load limit for green energy open access for captive consumers (June 2022) (opens in a new tab)
  4. Mercom: Tamil Nadu cuts rooftop solar network charges for MSMEs (Dec 2023) (opens in a new tab)

Related terms

  • Grid & policy

    Group captive

    An open-access structure in which electricity users jointly own at least 26% of a generating plant and consume at least 51% of its output, which exempts that power from cross-subsidy and additional surcharges.

  • Grid & policy

    Cross-subsidy surcharge

    A per-unit charge open-access consumers pay their DISCOM to make up for the cross-subsidy their regular tariff would have carried. Captive users are exempt.

  • Grid & policy

    Banking charges

    What a DISCOM charges to "store" surplus renewable power you inject into the grid and let you draw it back later in the settlement period.

  • Grid & policy

    Wheeling charges

    What you pay the distribution company for carrying open-access power over its network from the generator to your factory, usually per unit, plus a share of energy lost on the way.

Keep reading

Free feasibility study

Ask about open access for your factory

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection
  • Roof feasibility and the area available for installation
Call us+91 22 4618 3484Get a free feasibility study