UCC – Pune: 166 kWp metal sheet rooftop solar in Maharashtra

UCC bought the plant under CAPEX and owns it. The plant has supplied the site since Nov 2023. It is one of 2 UCC plants on our project list.

Capacity
166 kWp
Installation
Metal sheet roof
Location
Pune, Maharashtra
Finance model
CAPEX

This plant at a glance

Client
UCC
Industry
Automotive
Capacity
166 kWp (DC), with 125 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Nov 2023
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 166 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. The array is 33% larger than the inverters, a DC/AC ratio of 1.33.

Since Nov 2023, the plant in Pune has run through several monsoons. That history is the first thing an O&M review reads. Nov 2023 falls as the monsoon ends.

Closest in capacity on the list: Arihant Auto – Aurangabad (162 kWp). Nov 2023 also saw HUL – Kandla (160 kWp, Gujarat) and Dabur – Rudrapur (1,000 kWp, Uttarakhand) commissioned. Of the Maharashtra plants on our list, Ginni Gopal – Boisar was commissioned just before it and Atomberg – Pune just after.

Engineering

What a metal sheet rooftop plant involves

UCC – Pune is one of the metal sheet roof plants on our list. On a shed in Maharashtra, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.

Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like UCC – Pune is drawn with those in place, so no row loses output to a shadow that was visible on the first day.

A plant in Pune is only as good as its upkeep: inspections of connectors and inverters, cleaning that follows the local dust, and Asset Connect alerts on a string that has gone quiet.

Finance model

How the plant is paid for

Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at the plant since Nov 2023.

After handover, the owner placed day-to-day care of the plant with our O&M team under contract.

Pune

Pune and the automotive sector

Solar resource here
1,920 kWh/m² a yearAbout 1,590 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Pune; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp166 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Pune is a repeat location on the list, with 12 plants listed. Between them they cover automotive; electrical and electronics; polymer; chemicals; steel and metals.

Pune is covered on the page for Pune and its MIDC estates, which lists 12 plants.

Maharashtra has 44 projects on the list, across 17 towns. By roof, 40 on metal sheet roofs, 1 on Carport, 1 on Carport + RCC, 1 on ground mount and 1 on RCC.

Automotive suppliers run on takt times and shift patterns, and the day shift is where solar output and demand meet.

Press shops and assembly bays have tall, wide roofs where structure and wind load decide the design.

Projects

More plants near Pune

Also in Pune

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

What people ask about this plant

When was the UCC plant commissioned?

Nov 2023. That is when the 166 kWp plant in Pune began supplying the site, and the generation record runs from then.

Who maintains this Pune plant?

Ownership sits with the client under CAPEX. We designed and built the plant, and our O&M team maintains it.

Can the UCC – Pune design be repeated at my site?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Find out what your sheds can carry

The free 7-day study gives a site in Pune an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study