Project · Karnataka
MTC – Bidadi: 181 kWp metal sheet rooftop solar in Karnataka
MTC bought the plant under CAPEX and owns it. The plant has supplied the site since Apr 2024. It is one of 3 MTC plants on our project list.
- Capacity
- 181 kWp
- Installation
- Metal sheet roof
- Location
- Bidadi, Karnataka
- Finance model
- CAPEX
Size, roof and finance model
- Client
- MTC
- Industry
- Automotive
- Capacity
- 181 kWp (DC), with 176 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Apr 2024
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
181 kWp is at the smaller end of the plants on our list: one roof, with room for a second phase later. Modules and inverters are closely matched, a DC/AC ratio of 1.03.
The plant has run since Apr 2024. Module degradation and wear on inverters and cables now show in the record. Its first readings, in Apr 2024, came in the dusty summer months.
The plant closest to it in size on our list is MDB Chemicals – Jalgaon (176 kWp, Maharashtra). Apr 2024 also saw Plastiblends – Daman (200 kWp, Dadra and Nagar Haveli and Daman and Diu) and Plastiblends – Daman (67 kWp, Dadra and Nagar Haveli and Daman and Diu) commissioned. Its nearest neighbour in Karnataka, in order of commissioning, is Pearl Global – Bengaluru.
Solar in the area: Karnataka. See it in the filterable project list.
Engineering
The engineering behind a plant like MTC – Bidadi
For the metal sheet roof at MTC – Bidadi, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.
Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 181 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
How the plant is paid for
At the MTC plant the client carried the capital cost of the 181 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Bidadi
Bidadi and the automotive sector
- Solar resource here
- 1,942 kWh/m² a yearAbout 1,586 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Bidadi; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp181 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Besides this Bidadi plant, our list has 1 other plant in Bidadi. The sector named there is automotive.
Across Karnataka our list holds 3 plants in 1 town, commissioned between 2024 and 2026.
Automotive suppliers run on takt times and shift patterns, and the day shift is where solar output and demand meet.
Press shops and assembly bays have tall, wide roofs where structure and wind load decide the design.
Sector page: Automotive & auto components solar.
Projects
Related plants
Also in Bidadi
- MTC – Bidadi, 100 kW (AC)O&M only · Apr 2024
Elsewhere in Karnataka
- Pearl Global – Bengaluru637 kWp · RCC · Mar 2026
Other plants on metal sheet roofs
- Ginni Gopal – Boisar104 kWp · Metal sheet roof · Jan 2023
- Arihant Gold Plast – Sarigam274 kWp · Metal sheet roof · Sep 2022
- Lemken – Nagpur477 kWp · Metal sheet roof · Jul 2022
- Arihant Auto – Aurangabad162 kWp · Metal sheet roof · May 2022
Common questions
The MTC – Bidadi plant: questions and answers
When was the plant commissioned?
Apr 2024. That is when the 181 kWp plant in Bidadi began supplying the site, and the generation record runs from then.
Who owns the MTC – Bidadi plant?
Ownership sits with the client under CAPEX. We designed and built the plant, and our O&M team maintains it.
Can the MTC – Bidadi design be repeated at my site?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 181 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Want a 181 kWp plant on your own site?
The free 7-day study gives a site in Bidadi an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.